| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Point Wind | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 219.1 GWh | Feb 2021 | Mar 2026 | Wind |
| Camino Solar Hybrid | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 132.8 GWh | - | Mar 2026 | Solar |
| Wistaria Ranch Solar | Consolidated Edison Development Inc. | Calexico, CA | California Independent System Operator (CISO) | 286.6 GWh | Nov 2018 | Mar 2026 | Solar |
| Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 64.9 GWh | Mar 2020 | Mar 2026 | Solar |
| Voyager Wind III | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 123.1 GWh | Nov 2018 | Mar 2026 | Wind |
| Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 451.8 GWh | Nov 2018 | Mar 2026 | Wind |
| RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 112.8 GWh | Apr 2023 | Mar 2026 | Solar |
| Slate Hybrid | MN8 Energy LLC | Stratford, CA | California Independent System Operator (CISO) | 726.8 GWh | Oct 2021 | Mar 2026 | Solar |
| Solar Blue | Westlands Solar Blue (OZ) Owner, LLC | Lemoore, CA | California Independent System Operator (CISO) | 650.5 GWh | Nov 2023 | Mar 2026 | Solar |
| Chestnut | Castanea Project LLC | Lemoore, CA | California Independent System Operator (CISO) | 381.3 GWh | Nov 2023 | Mar 2026 | Solar |
| Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 399.3 GWh | Dec 2019 | Mar 2026 | Solar |
| Golden Field Solar III, LLC | Golden Fields Solar III, LLC | Rosamond, CA | California Independent System Operator (CISO) | 538.9 GWh | Nov 2020 | Mar 2026 | Solar : 99.4% |
| Titan Solar 1 (CA) | Titan Solar 1, LLC | Borrego Springs, CA | California Independent System Operator (CISO) | 134.1 GWh | Nov 2020 | Mar 2026 | Solar |
| Central 40 | Central 40, LLC | Newman, CA | California Independent System Operator (CISO) | 73.9 GWh | Jan 2021 | Mar 2026 | Solar |
| Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 250.5 GWh | Nov 2018 | Mar 2026 | Solar |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 134.1 GWh | Oct 2017 | Mar 2026 | Wind |
| Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 670.4 GWh | Oct 2018 | Mar 2026 | Solar |
| Eland Solar & Storage Center, Phase 2 Hy | 69SV 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 385.2 GWh | - | Mar 2026 | Solar |
| Eland Solar & Storage Center, Phase 1 Hy | 68SF 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 669.7 GWh | Oct 2024 | Mar 2026 | Solar |
| Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 192.0 GWh | Nov 2020 | Mar 2026 | Solar |
| Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 291.4 GWh | Nov 2020 | Mar 2026 | Solar |
| Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 277.5 GWh | Oct 2021 | Mar 2026 | Solar |
| Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 391.5 GWh | Nov 2021 | Mar 2026 | Solar |
| Fifth Standard Solar PV, LLC (Hybrid) | Big Sky Wind, LLC | Huron, CA | California Independent System Operator (CISO) | 321.5 GWh | Aug 2023 | Mar 2026 | Solar |
| Bellefield Solar and Energy Storage Farm | 50LW 8me LLC | Mojave, CA | California Independent System Operator (CISO) | 270.9 GWh | - | Mar 2026 | Solar |
| SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 566.9 GWh | Nov 2021 | Mar 2026 | Solar |
| Hyperion Treatment Plant CHP Plant | Constellation New Energy Inc. | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 155.3 GWh | Mar 2017 | Mar 2026 | Other Biomass Gas : 66.0% Natural Gas : 34.0% |
| Coachella Hills Wind | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 198.6 GWh | Feb 2021 | Mar 2026 | Wind |
| Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 182.6 GWh | Jun 2021 | Mar 2026 | Wind |
| Colgreen North Shore Solar Farm | Sunpin Holdings, LLC | Mecca, CA | Imperial Irrigation District (IID) | 134.5 GWh | Nov 2018 | Mar 2026 | Solar |
| American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 314.4 GWh | Nov 2020 | Mar 2026 | Solar |
| Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2020 | Mar 2026 | Natural Gas |
| Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 359.9 GWh | Nov 2019 | Mar 2026 | Wind |
| Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 142.3 GWh | Nov 2016 | Mar 2026 | Solar |
| Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 138.6 GWh | Nov 2016 | Mar 2026 | Solar |
| Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 643.9 GWh | Feb 2022 | Mar 2026 | Solar |
| Springbok 3 Solar Farm Hybrid | 64KT 8me LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 243.4 GWh | Jun 2019 | Mar 2026 | Solar |
| Resurgence Solar | Resurgence Solar | Boron, CA | California Independent System Operator (CISO) | 251.5 GWh | Jul 2023 | Mar 2026 | Solar |
| Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 331.8 GWh | Jul 2022 | Mar 2026 | Solar |
| Hudson - High Desert Hybrid | MN8 Energy LLC | Victorville, CA | California Independent System Operator (CISO) | 295.2 GWh | Nov 2021 | Mar 2026 | Solar |
| Midway Solar Farm 1 | 83WI 8ME, LLC | Calipatria, CA | Imperial Irrigation District (IID) | 113.6 GWh | Dec 2017 | Mar 2026 | Solar |
| Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 239.9 GWh | Dec 2018 | Mar 2026 | Solar |
| Rabbitbrush Solar, LLC | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 250.2 GWh | Sep 2022 | Mar 2026 | Solar |
| Rexford Solar Farm | AES Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 717.3 GWh | - | Mar 2026 | Solar |
| Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 523.5 GWh | Nov 2023 | Mar 2026 | Solar |
| Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 39.8 GWh | Apr 2017 | Mar 2026 | Solar |
| Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 869.3 GWh | Jun 2023 | Mar 2026 | Solar |
| Chaparral Springs | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 395.0 GWh | - | Mar 2026 | Solar |
| Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 57.0 GWh | Nov 2021 | Mar 2026 | Solar |
| Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 332.8 GWh | Jul 2022 | Mar 2026 | Solar |
| Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 302.3 GWh | Nov 2021 | Mar 2026 | Solar |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 473.5 GWh | May 2024 | Mar 2026 | Solar |
| Luciana | Tulare Solar Center, LLC | Richgrove, CA | California Independent System Operator (CISO) | 138.2 GWh | Mar 2022 | Mar 2026 | Solar |
| Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 120.5 GWh | Nov 2016 | Mar 2026 | Solar |
| Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 202.3 GWh | Nov 2016 | Mar 2026 | Solar |
| Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 84.6 GWh | Feb 2022 | Mar 2026 | Solar |
| Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 102.4 GWh | Feb 2022 | Mar 2026 | Solar |
| BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 340.2 GWh | Jan 2022 | Mar 2026 | Solar |
| Blythe Mesa Solar II | Blythe Mesa Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 604.1 GWh | Nov 2022 | Mar 2026 | Solar |
| Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 359.2 GWh | Oct 2020 | Mar 2026 | Solar |
| Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 357.0 GWh | Apr 2020 | Mar 2026 | Solar |
| Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 336.8 GWh | Jun 2016 | Mar 2026 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 66.1 GWh | Oct 2017 | Mar 2026 | Solar |
| CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 311.1 GWh | Jan 2019 | Mar 2026 | Solar |
| CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 264.9 GWh | Oct 2017 | Mar 2026 | Solar |
| RE Astoria 2 | RE Astoria 2 LLC | Rosamond, CA | California Independent System Operator (CISO) | 156.9 GWh | Nov 2016 | Mar 2026 | Solar |
| RE Astoria | RE Astoria LLC | Rosamond, CA | California Independent System Operator (CISO) | 187.7 GWh | Nov 2016 | Mar 2026 | Solar |
| Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 105.3 GWh | Nov 2016 | Mar 2026 | Solar |
| Great Valley Solar Portfolio Holdings, L | Consolidated Edison Development Inc. | Cantua Creek, CA | California Independent System Operator (CISO) | 494.8 GWh | Nov 2017 | Mar 2026 | Solar |
| North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 388.1 GWh | May 2019 | Mar 2026 | Solar |
| Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 851.3 GWh | Nov 2024 | Mar 2026 | Solar |
| Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 62.6 GWh | Nov 2020 | Mar 2026 | Solar |
| Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 432.2 GWh | Nov 2024 | Mar 2026 | Solar |
| Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 232.4 GWh | Nov 2024 | Mar 2026 | Solar |
| Edwards Sanborn E1B | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 353.9 GWh | Oct 2022 | Mar 2026 | Solar |
| Edwards Sanborn E4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 327.1 GWh | Nov 2022 | Mar 2026 | Solar |
| Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 155.6 GWh | Nov 2022 | Mar 2026 | Solar |
| Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 91.5 GWh | Oct 2022 | Mar 2026 | Solar |
| Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 111.3 GWh | May 2020 | Mar 2026 | Solar |
| Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 409.9 GWh | Nov 2019 | Mar 2026 | Solar |
| Vikings Energy Farm | Vikings Energy Farm, LLC | Holtville, CA | Imperial Irrigation District (IID) | 311.4 GWh | Apr 2024 | Mar 2026 | Solar |
| Oberon Solar Project | IP Oberon LLC | Desert Center, CA | California Independent System Operator (CISO) | 605.1 GWh | Aug 2023 | Mar 2026 | Solar |
| Oberon II Solar Project | IP Oberon II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 600.8 GWh | Aug 2023 | Mar 2026 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 564.7 GWh | Feb 2024 | Mar 2026 | Solar |
| W Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 23.2 GWh | Jun 2005 | Mar 2026 | Natural Gas |
| Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 789.7 GWh | Feb 2024 | Mar 2026 | Solar |
| SloughHouse Solar, LLC | SloughHouse Solar, LLC | SloughHouse, CA | Balancing Authority of Northern California (BANC) | 72.3 GWh | - | Mar 2026 | Solar |
| Ocotillo Wells | Conductive Power | Borrego Springs, CA | California Independent System Operator (CISO) | 109.6 GWh | Aug 2023 | Mar 2026 | Solar |
| AM Wind Repower LLC | Brookfield Renewable Trading and Marketing LP | Whitewater, CA | California Independent System Operator (CISO) | 88.4 GWh | - | Mar 2026 | Wind |
| Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 470.9 GWh | Mar 2024 | Mar 2026 | Solar |
| Golden Acorn Casino | Foundation HA Energy Generation, LLC | Campo, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2014 | Mar 2026 | Wind |
| Hecate Energy Beacon Solar 4 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 116.8 GWh | Nov 2016 | Mar 2026 | Solar |
| Hecate Energy Beacon Solar 3 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 121.6 GWh | Nov 2016 | Mar 2026 | Solar |
| Hecate Energy Beacon Solar 1 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 128.9 GWh | Mar 2017 | Mar 2026 | Solar |
| Beacon Solar Plant Site 2 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 112.2 GWh | Nov 2017 | Mar 2026 | Solar |
| Beacon Solar Plant Site 5 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 89.9 GWh | Nov 2017 | Mar 2026 | Solar |
| Baldy Mesa Solar & Storage | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 310.5 GWh | Apr 2024 | Mar 2026 | Solar |
| Resurgence Solar II | Resurgence Solar II | Boron, CA | California Independent System Operator (CISO) | 135.4 GWh | Jul 2023 | Mar 2026 | Solar |
| BCE Seal Beach | BCE Seal Beach | Seal Beach, CA | California Independent System Operator (CISO) | 5.7 GWh | - | Mar 2026 | Solar |
| Lockhart Solar PV II | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 207.6 GWh | Jun 2023 | Mar 2026 | Solar |
Browse Power Plants By California Counties
Figures are based on March 2026 generation numbers.| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Sierra County, CA | # 55 | 3 | 11.9 GWh |
| Mendocino County, CA | # 54 | 5 | 12.3 GWh |
| Glenn County, CA | # 53 | 2 | 18.7 GWh |
| Marin County, CA | # 52 | 3 | 19.0 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.3 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 82.1 GWh |
| Siskiyou County, CA | # 47 | 8 | 89.8 GWh |
| San Mateo County, CA | # 46 | 11 | 134.3 GWh |
| Yolo County, CA | # 45 | 15 | 210.6 GWh |
| Nevada County, CA | # 44 | 12 | 219.1 GWh |
| San Benito County, CA | # 43 | 6 | 271.3 GWh |
| Mariposa County, CA | # 42 | 2 | 299.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 316.4 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 450.9 GWh |
| Trinity County, CA | # 38 | 5 | 514.3 GWh |
| Merced County, CA | # 37 | 31 | 549.1 GWh |
| Calaveras County, CA | # 36 | 6 | 555.5 GWh |
| Amador County, CA | # 35 | 8 | 621.1 GWh |
| Ventura County, CA | # 34 | 32 | 743.6 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 908.4 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| Tulare County, CA | # 28 | 69 | 1.6 TWh |
| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 27 | 47 | 1.6 TWh |
| El Dorado County, CA | # 26 | 15 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Plumas County, CA | # 23 | 13 | 2.0 TWh |
| Colusa County, CA | # 22 | 3 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.4 TWh |
| Orange County, CA | # 20 | 59 | 2.6 TWh |
| Stanislaus County, CA | # 19 | 25 | 2.7 TWh |
| Alameda County, CA | # 18 | 47 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 3.0 TWh |
| Solano County, CA | # 16 | 40 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 75 | 3.5 TWh |
| Kings County, CA | # 13 | 57 | 4.2 TWh |
| San Diego County, CA | # 12 | 151 | 4.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.1 TWh |
| Sacramento County, CA | # 10 | 65 | 5.7 TWh |
| Shasta County, CA | # 9 | 46 | 7.3 TWh |
| Fresno County, CA | # 8 | 119 | 7.6 TWh |
| Imperial County, CA | # 7 | 84 | 9.5 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.0 TWh |
| Riverside County, CA | # 4 | 159 | 14.8 TWh |
| Los Angeles County, CA | # 3 | 308 | 17.0 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 19.7 TWh |
| Kern County, CA | # 1 | 313 | 35.2 TWh |