Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 208.6 GWh | Jul 2019 | Jun 2026 | Solar |
| Scarlet II Hybrid | EDPR Scarlet II LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 383.2 GWh | Nov 2024 | Jun 2026 | Solar |
| SF Azalea, LLC | Idemitsu Renewables | Lost Hills, CA | California Independent System Operator (CISO) | 88.6 GWh | Nov 2025 | Jun 2026 | Solar |
| Baldy Mesa 2_Silver Peak Hybrid | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 117.1 GWh | Nov 2024 | Jun 2026 | Solar |
| Voyager Wind III | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 120.0 GWh | Nov 2018 | Jun 2026 | Wind |
| Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 431.4 GWh | Nov 2018 | Jun 2026 | Wind |
| Citizens Imperial Solar | Citizens Enterprises Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 62.2 GWh | Jul 2019 | Jun 2026 | Solar |
| Raceway Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 357.7 GWh | Apr 2024 | Jun 2026 | Solar |
| Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 157.2 GWh | Nov 2023 | Jun 2026 | Solar |
| Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 189.1 GWh | Nov 2023 | Jun 2026 | Wind |
| RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 124.2 GWh | Apr 2023 | Jun 2026 | Solar |
| Lockhart Solar PV II | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 207.2 GWh | Jun 2023 | Jun 2026 | Solar |
| Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 234.5 GWh | Nov 2020 | Jun 2026 | Solar |
| Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 321.0 GWh | Nov 2020 | Jun 2026 | Solar |
| Resurgence Solar II | Resurgence Solar II | Boron, CA | California Independent System Operator (CISO) | 131.5 GWh | Jul 2023 | Jun 2026 | Solar |
| Baldy Mesa Solar & Storage | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 307.9 GWh | Apr 2024 | Jun 2026 | Solar |
| Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 364.5 GWh | Dec 2019 | Jun 2026 | Solar |
| Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 270.4 GWh | Oct 2019 | Jun 2026 | Solar |
| Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 226.4 GWh | Nov 2018 | Jun 2026 | Solar |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 130.8 GWh | Oct 2017 | Jun 2026 | Wind |
| Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 467.5 GWh | Mar 2024 | Jun 2026 | Solar |
| Little Bear 4 | Little Bear Solar 4, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 39.2 GWh | Nov 2020 | Jun 2026 | Solar |
| Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 635.0 GWh | Oct 2018 | Jun 2026 | Solar |
| Eland Solar & Storage Center, Phase 2 Hy | 69SV 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 595.1 GWh | Jun 2025 | Jun 2026 | Solar |
| AM Wind Repower | AM Wind Repower LLC | Whitewater, CA | California Independent System Operator (CISO) | 76.7 GWh | Feb 2025 | Jun 2026 | Wind |
| Eland Solar & Storage Center, Phase 1 Hy | 68SF 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 716.5 GWh | Oct 2024 | Jun 2026 | Solar |
| Little Bear 5 | Little Bear Solar 5, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 106.6 GWh | Nov 2020 | Jun 2026 | Solar |
| Aquamarine | Aqua | Lemoore, CA | California Independent System Operator (CISO) | 648.1 GWh | Aug 2021 | Jun 2026 | Solar |
| Carlsbad Energy Center | NRG California Peaker Operations LLC | Carlsbad, CA | California Independent System Operator (CISO) | 190.6 GWh | Nov 2018 | Jun 2026 | Natural Gas |
| Ocotillo Wells | Conductive Power | Borrego Springs, CA | California Independent System Operator (CISO) | 104.8 GWh | Aug 2023 | Jun 2026 | Solar |
| SloughHouse Solar, LLC | SloughHouse Solar, LLC | SloughHouse, CA | Balancing Authority of Northern California (BANC) | 113.3 GWh | Jun 2025 | Jun 2026 | Solar |
| SC 1 Data Center, Phase 2 | Xeres Ventures LLC | Santa Clara, CA | California Independent System Operator (CISO) | 263.0 MWh | Aug 2011 | Jun 2026 | Distillate Fuel Oil |
| Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 734.2 GWh | Feb 2024 | Jun 2026 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 568.9 GWh | Feb 2024 | Jun 2026 | Solar |
| Oberon II Solar Project | Intersect USA, LLC | Desert Center, CA | California Independent System Operator (CISO) | 575.8 GWh | Aug 2023 | Jun 2026 | Solar |
| Oberon Solar Project | Intersect USA, LLC | Desert Center, CA | California Independent System Operator (CISO) | 569.1 GWh | Aug 2023 | Jun 2026 | Solar |
| Vikings Energy Farm | Vikings Energy Farm, LLC | Holtville, CA | Imperial Irrigation District (IID) | 294.3 GWh | Apr 2024 | Jun 2026 | Solar |
| Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 94.3 GWh | Oct 2022 | Jun 2026 | Solar |
| Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 153.6 GWh | Nov 2022 | Jun 2026 | Solar |
| Edwards Sanborn E4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 334.6 GWh | Nov 2022 | Jun 2026 | Solar |
| Edwards Sanborn E1B | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 356.0 GWh | Oct 2022 | Jun 2026 | Solar |
| Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 250.1 GWh | Nov 2024 | Jun 2026 | Solar |
| Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 457.7 GWh | Nov 2024 | Jun 2026 | Solar |
| Hyperion Treatment Plant CHP Plant | Constellation New Energy Inc. | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 156.1 GWh | Mar 2017 | Jun 2026 | Other Biomass Gas : 64.0% Natural Gas : 36.0% |
| Colgreen North Shore Solar Farm | Sunpin Holdings, LLC | Mecca, CA | Imperial Irrigation District (IID) | 150.1 GWh | Nov 2018 | Jun 2026 | Solar |
| American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 278.6 GWh | Nov 2020 | Jun 2026 | Solar |
| Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 2.3 GWh | Jun 2020 | Jun 2026 | Natural Gas |
| Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 345.6 GWh | Nov 2019 | Jun 2026 | Wind |
| Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 138.1 GWh | Nov 2016 | Jun 2026 | Solar |
| Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 139.3 GWh | Nov 2016 | Jun 2026 | Solar |
| Beacon Solar Plant Site 5 | Sune Beacon Site 5, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 82.9 GWh | Nov 2017 | Jun 2026 | Solar |
| Beacon Solar Plant Site 2 | Sune Beacon Site 2, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 105.2 GWh | Nov 2017 | Jun 2026 | Solar |
| Hecate Energy Beacon Solar 1 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 124.6 GWh | Mar 2017 | Jun 2026 | Solar |
| Hecate Energy Beacon Solar 3 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 118.3 GWh | Nov 2016 | Jun 2026 | Solar |
| Hecate Energy Beacon Solar 4 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 114.7 GWh | Nov 2016 | Jun 2026 | Solar |
| Golden Acorn Casino | Foundation HA Energy Generation, LLC | Campo, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2014 | Jun 2026 | Wind |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 308.2 GWh | Oct 2022 | Jun 2026 | Solar |
| Springbok 3 Solar Farm Hybrid | 64KT 8me LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 233.3 GWh | Jun 2019 | Jun 2026 | Solar |
| Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.4 GWh | Oct 2014 | Jun 2026 | Wind |
| Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 692.0 GWh | May 2022 | Jun 2026 | Solar |
| Rancho Seco Solar II, LLC | Rancho Seco Solar II, LLC | Twin Cities, CA | Balancing Authority of Northern California (BANC) | 268.6 GWh | Jan 2021 | Jun 2026 | Solar |
| Point Wind | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 218.9 GWh | Feb 2021 | Jun 2026 | Wind |
| Midway Solar Farm 1 | 83WI 8ME, LLC | Calipatria, CA | Imperial Irrigation District (IID) | 95.9 GWh | Dec 2017 | Jun 2026 | Solar |
| Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 219.8 GWh | Dec 2018 | Jun 2026 | Solar |
| Camino Solar Hybrid | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 134.4 GWh | Mar 2025 | Jun 2026 | Solar |
| Blythe Mesa Solar II | Intersect USA, LLC | Blythe, CA | California Independent System Operator (CISO) | 574.9 GWh | Nov 2022 | Jun 2026 | Solar |
| BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 330.3 GWh | Jan 2022 | Jun 2026 | Solar |
| Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 98.6 GWh | Feb 2022 | Jun 2026 | Solar |
| W Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 16.2 GWh | Jun 2005 | Jun 2026 | Natural Gas |
| Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 81.6 GWh | Feb 2022 | Jun 2026 | Solar |
| Luciana | Tulare Solar Center, LLC | Richgrove, CA | California Independent System Operator (CISO) | 140.2 GWh | Mar 2022 | Jun 2026 | Solar |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 483.8 GWh | May 2024 | Jun 2026 | Solar |
| Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 293.4 GWh | Nov 2021 | Jun 2026 | Solar |
| Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 318.7 GWh | Jul 2022 | Jun 2026 | Solar |
| Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 396.9 GWh | Nov 2019 | Jun 2026 | Solar |
| Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 58.8 GWh | Nov 2021 | Jun 2026 | Solar |
| Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 89.9 GWh | May 2020 | Jun 2026 | Solar |
| Chaparral Springs | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 406.7 GWh | Mar 2025 | Jun 2026 | Solar |
| Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 63.9 GWh | Mar 2020 | Jun 2026 | Solar |
| Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 834.1 GWh | Jun 2023 | Jun 2026 | Solar |
| Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 493.8 GWh | Nov 2023 | Jun 2026 | Solar |
| Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 44.5 GWh | Apr 2017 | Jun 2026 | Solar |
| Rexford Solar Farm | AES Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 712.6 GWh | Jan 2025 | Jun 2026 | Solar |
| Rabbitbrush Solar, LLC | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 255.7 GWh | Sep 2022 | Jun 2026 | Solar |
| Hudson - High Desert Hybrid | MN8 Energy LLC | Victorville, CA | California Independent System Operator (CISO) | 291.6 GWh | Nov 2021 | Jun 2026 | Solar |
| Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 333.9 GWh | Jul 2022 | Jun 2026 | Solar |
| Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 118.5 GWh | Nov 2016 | Jun 2026 | Solar |
| Resurgence Solar | Resurgence Solar | Boron, CA | California Independent System Operator (CISO) | 243.4 GWh | Jul 2023 | Jun 2026 | Solar |
| Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 640.6 GWh | Feb 2022 | Jun 2026 | Solar |
| Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 201.8 GWh | Nov 2016 | Jun 2026 | Solar |
| Slate Hybrid | MN8 Energy LLC | Stratford, CA | California Independent System Operator (CISO) | 698.2 GWh | Oct 2021 | Jun 2026 | Solar |
| Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 339.1 GWh | Oct 2020 | Jun 2026 | Solar |
| Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 346.3 GWh | Apr 2020 | Jun 2026 | Solar |
| Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 328.7 GWh | Jun 2016 | Jun 2026 | Solar |
| Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 67.7 GWh | Nov 2020 | Jun 2026 | Solar |
| Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 852.5 GWh | Nov 2024 | Jun 2026 | Solar |
| Solar Blue | Westlands Solar Blue | Lemoore, CA | California Independent System Operator (CISO) | 646.5 GWh | Nov 2023 | Jun 2026 | Solar |
| Chestnut | Chestnut Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 363.2 GWh | Nov 2023 | Jun 2026 | Solar |
| Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 178.8 GWh | Jun 2021 | Jun 2026 | Wind |
| North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 358.7 GWh | May 2019 | Jun 2026 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.4 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 80.0 GWh |
| San Mateo County, CA | # 46 | 11 | 131.1 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 253.0 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 296.3 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 440.4 GWh |
| Merced County, CA | # 38 | 33 | 490.0 GWh |
| Trinity County, CA | # 37 | 5 | 499.2 GWh |
| Calaveras County, CA | # 36 | 6 | 503.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 605.0 GWh |
| Ventura County, CA | # 33 | 33 | 687.9 GWh |
| Lake County, CA | # 32 | 10 | 896.4 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.5 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.6 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.0 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 52 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.1 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 6.9 TWh |
| Fresno County, CA | # 8 | 128 | 7.4 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.6 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.4 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Los Angeles County, CA | # 3 | 325 | 16.7 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 333 | 34.3 TWh |