Fifth Standard Solar PV, LLC (Hybrid)
39905 Lassen Ave, Huron, CA 93234Plant Summary Information
Fifth Standard Solar PV, LLC (Hybrid) is ranked #57 out of 849 solar farms in California in terms of total annual net electricity generation.
Fifth Standard Solar PV, LLC (Hybrid) generated 119.9 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Fifth Standard Solar PV, LLC (Hybrid) |
|---|---|
| Utility Name | Big Sky Wind, LLC |
| Location | Fresno County, CA |
| Initial Operation Date | September 2023 |
| Last Update | Sep 2025 |
| Annual Generation | 317.9 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,896 out of 12,539 Power Plants Nationwide | |
| Ranked #211 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #160 out of 1,600 California Power Plants | |
| Ranked #57 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
RWE Renewables Americas LLC (2020 to 2021) RWE Renewables Americas, LLC (2022 to 2023) Big Sky Wind, LLC (2024 to 2024) |
Map of Fifth Standard Solar PV, LLC (Hybrid)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fifth Standard Solar PV, LLC (Hybrid).
Monthly Net Generation for Fifth Standard Solar PV, LLC (Hybrid)
Fifth Standard Solar PV, LLC (Hybrid) Details
| Summary Information | |
|---|---|
| Plant Name | Fifth Standard Solar PV, LLC (Hybrid) (64197) |
| Plant Address | 39905 Lassen Ave, Huron, CA 93234 |
| Utility | Big Sky Wind, LLC (56215) |
| Latitude, Longitude | 36.15319, -120.10448 |
| Generation Dates on File | Sep 2023 to Sep 2025 |
| Initial Operation Date | September 2023 |
| Annual Generation | 317.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator FTHSB Details Operating September 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 137 MW |
| Summer Capacity | 117 MW |
| Winter Capacity | 117 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 137 |
|---|---|
| Maximum Charge Rate | 137 MW |
| Maximum Discharge Rate | 137 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 45.1 |
| Storage Enclosure Type | CS |
| Frequency Regulation | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 64197 |
| Direct Support Gen Id | FTHSS |
| Support T D Asset | No |
Generator FTHSS Details Operating September 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 196.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Fifth Standard Solar PV, LLC (Hybrid) Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #201 | Centinela Solar Energy | Calexico, CA | 352.7 GWh |
| #202 | Newport Solar Project | Newport, AR | 352.7 GWh |
| #203 | Blythe Solar II, LLC | Blythe, CA | 337.2 GWh |
| #204 | Ganado Solar | Gail, TX | 343.8 GWh |
| #205 | Edwards Sanborn E1A | Mojave, CA | 333.4 GWh |
| #206 | Impact Solar 1 | Deport, TX | 348.0 GWh |
| #207 | Blythe Solar IV, LLC | Blythe, CA | 339.0 GWh |
| #208 | Estonian Solar Project, LLC | Cooper, TX | 339.2 GWh |
| #209 | Box Canyon (AZ) | Florence, AZ | 344.8 GWh |
| #210 | Midway Solar - TX | Fort Stockton, TX | 343.6 GWh |
| #212 | Arlington Energy Center III | Blythe, CA | 321.0 GWh |
| #213 | Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh |
| #214 | Calhoun Solar | Battle Creek, MI | 337.3 GWh |
| #215 | Maverick Solar 7, LLC | Desert Center, CA | 336.8 GWh |
| #216 | American Kings Solar, LLC | Lemoore, CA | 334.0 GWh |
| #217 | Agave | Arlington, AZ | 333.8 GWh |
| #218 | SR Russellville | Olmstead, KY | 332.9 GWh |
| #219 | Golden Triangle | Lowndes, MS | 327.5 GWh |
| #220 | Markum Solar Farm | Valley Mills, TX | 332.8 GWh |
| #221 | Vikings Energy Farm | Holtville, CA | 310.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fifth Standard Solar PV, LLC (Hybrid).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Almond | Lemoore, CA | 39.2 GWh | 11.6 mi |
| Aquamarine | Lemoore, CA | 679.2 GWh | 11.5 mi |
| Avenal Park | Avenal, CA | 9.5 GWh | 11.3 mi |
| CA-DGS RFP-Pleasant Valley State Prison | Coalinga, CA | 4.0 GWh | 8.4 mi |
| CDCR (CA) - Pleasant Valley State Prison | Coalinga, CA | 2.8 GWh | 6.8 mi |
| CED Avenal | Avenal, CA | 9.7 GWh | 11.2 mi |
| Chestnut | Lemoore, CA | 390.8 GWh | 11.1 mi |
| DSH (CA) - Coalinga State Hospital | Coalinga, CA | 4.6 GWh | 6.5 mi |
| Gates Solar Station | Huron, CA | 31.7 GWh | 1.7 mi |
| Harris Farms Solar Facility | Coalinga, CA | 3.0 GWh | 9.8 mi |
| Huron Solar Station | Huron, CA | 28.8 GWh | 4.6 mi |
| Kettleman Solar -Centaurus | Kettleman City, CA | 40.7 GWh | 11.3 mi |
| RE Mustang LLC | Lemoore, CA | 220.6 GWh | 12.2 mi |
| Sand Drag LLC | Avenal, CA | 28.2 GWh | 11.8 mi |
| Solar Blue | Lemoore, CA | 658.1 GWh | 11.3 mi |
| Sun City Project LLC | Avenal, CA | 33.9 GWh | 11.8 mi |
| Van der Kooi Dairy Solar Array | Riverdale, CA | 3.7 GWh | 10.6 mi |
| West Gates Solar Station | Huron, CA | 19.2 GWh | 1.7 mi |
| Westlands Solar PV Farm | Huron, CA | 33.9 GWh | 1.9 mi |
| Westside Solar Power PV1 | Lemoore, CA | 4.9 GWh | 11.9 mi |