Drew Solar LLC
1590 Drew Road, Calexico, CA 92231Plant Summary Information
Drew Solar LLC is ranked #66 out of 885 solar farms in California in terms of total annual net electricity generation.
Drew Solar LLC generated 92.6 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Drew Solar LLC |
|---|---|
| Utility Name | Drew Solar LLC |
| Location | Imperial County, CA |
| Initial Operation Date | November 2022 |
| Last Update | May 2026 |
| Annual Generation | 308.6 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,994 out of 13,081 Power Plants Nationwide | |
| Ranked #290 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #168 out of 1,606 California Power Plants | |
| Ranked #66 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Drew Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Drew Solar LLC.
Monthly Net Generation for Drew Solar LLC
Monthly Plant Fuel Consumption for Drew Solar LLC
Drew Solar LLC Details
| Summary Information | |
|---|---|
| Plant Name | Drew Solar LLC (63127) |
| Plant Address | 1590 Drew Road, Calexico, CA 92231 |
| Utility | Drew Solar LLC (62911) |
| Latitude, Longitude | 32.6872, -115.66559 |
| Generation Dates on File | Nov 2022 to May 2026 |
| Initial Operation Date | November 2022 |
| Annual Generation | 308.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator DS Details Operating November 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 137.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Drew Solar LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #280 | Lily Solar Hybrid | Scurry, TX | 312.2 GWh |
| #281 | Storey Solar and Storage | Coolidge, AZ | 299.5 GWh |
| #282 | Big River Solar | Norris City, IL | 313.2 GWh |
| #283 | Washington County Solar | Sandersville, GA | 312.4 GWh |
| #284 | South Cheyenne Solar | South Greeley, WY | 312.4 GWh |
| #285 | Milagro Solar I | Santa Teresa, NM | 311.9 GWh |
| #286 | Nebula Solar | La Feria, TX | 311.2 GWh |
| #287 | Midway Solar - TX | Fort Stockton, TX | 310.8 GWh |
| #288 | Ridgely Energy Farm | Ridgely, TN | 309.3 GWh |
| #289 | River Ferry Solar 1 | West Union, IL | 309.1 GWh |
| #291 | Agave | Arlington, AZ | 307.4 GWh |
| #292 | Rocky Mountain Solar | Avondale, CO | 302.5 GWh |
| #293 | Edwards Sanborn E2 | Mojave, CA | 291.6 GWh |
| #294 | Fort Powhatan Solar | Disputanta, VA | 306.9 GWh |
| #295 | Cass County Renewable Energy Center | Beardstown, IL | 305.9 GWh |
| #296 | Morris Ridge Solar | Mount Morris, NY | 305.5 GWh |
| #297 | Appleseed Solar | Logansport, IN | 305.5 GWh |
| #298 | Wolf Run Solar | Chapin, IL | 305.3 GWh |
| #299 | Samson Solar Energy III LLC | Cunningham, TX | 304.9 GWh |
| #300 | Powell Creek Solar | Miller City, OH | 304.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Drew Solar LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Campo Verde Solar | El Centro, CA | 292.7 GWh | 5.8 mi |
| Centinela Solar Energy | Calexico, CA | 448.6 GWh | 1 mi |
| Centinela State Prison | Sacramento, CA | 18.0 GWh | 11.8 mi |
| El Centro Hybrid | El Centro, CA | 927.3 GWh | 10.8 mi |
| Heber Geothermal | Heber, CA | 376.3 GWh | 8.8 mi |
| Heber Solar | Heber, CA | 24.1 GWh | 7.5 mi |
| Imperial Solar Energy Center South | Calexico, CA | 251.1 GWh | 1.7 mi |
| Imperial Solar Energy Center West | Seeley, CA | 357.0 GWh | 8.8 mi |
| Imperial Valley Solar, LLC | Calexico, CA | 441.7 GWh | 4.7 mi |
| IVC Solar | Imperial, CA | 4.2 GWh | 13.6 mi |
| Mount Signal Solar Farm II | Calexico, CA | 373.2 GWh | 2.5 mi |
| Mount Signal Solar Farm V | Calexico, CA | 638.8 GWh | 5.8 mi |
| Second Imperial Geothermal | Heber, CA | 275.2 GWh | 7.8 mi |
| SEPV Imperial Dixieland East | Imperial, CA | 5.3 GWh | 9.6 mi |
| SEPV Imperial Dixieland West | Imperial, CA | 8.5 GWh | 9.9 mi |
| Sol Orchard El Centro PV | El Centro, CA | 45.1 GWh | 10.6 mi |
| USG 1 | El Centro, CA | 3.0 GWh | 13.3 mi |
| USG 2 | El Centro, CA | 2.0 GWh | 13.5 mi |
| Valencia 3 | Imperial, CA | 4.2 GWh | 15.6 mi |
| Wistaria Ranch Solar | Calexico, CA | 271.3 GWh | 2.8 mi |