Drew Solar LLC
1590 Drew Road, Calexico, CA 92231Plant Summary Information
Drew Solar LLC is ranked #51 out of 799 solar farms in California in terms of total annual net electricity generation.
Drew Solar LLC generated 98.3 GWh during the 3-month period between April 2024 to July 2024.
Plant Name | Drew Solar LLC |
---|---|
Utility Name | Drew Solar LLC |
Location | Imperial County, CA |
Initial Operation Date | November 2022 |
Last Update | Jul 2024 |
Annual Generation | 300.8 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,815 out of 11,825 Power Plants Nationwide | |
Ranked #145 out of 5,634 Solar Power Plants Nationwide | |
Ranked #167 out of 1,569 California Power Plants | |
Ranked #51 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Drew Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Drew Solar LLC.
Monthly Net Generation for Drew Solar LLC
Drew Solar LLC Details
Summary Information | |
---|---|
Plant Name | Drew Solar LLC (63127) |
Plant Address | 1590 Drew Road, Calexico, CA 92231 |
Utility | Drew Solar LLC (62911) |
Latitude, Longitude | 32.6872, -115.66559 |
Generation Dates on File | Nov 2022 to Jul 2024 |
Initial Operation Date | November 2022 |
Annual Generation | 300.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator DS Details Operating November 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 137.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Drew Solar LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#135 | Samson Solar Energy III LLC | Cunningham, TX | 318.5 GWh |
#136 | Cove Mountain Solar 2 | Beryl, UT | 318.4 GWh |
#137 | Fort Powhatan Solar | Disputanta, VA | 317.7 GWh |
#138 | Maverick Solar 7, LLC | Desert Center, CA | 315.1 GWh |
#139 | SR DeSoto I, LLC | DeSoto, GA | 309.3 GWh |
#140 | Sun Streams 2 | Hassayampa, AZ | 306.6 GWh |
#141 | Elora Solar | Elora, TN | 305.7 GWh |
#142 | Edwards Sanborn E2 | Mojave, CA | 288.4 GWh |
#143 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 283.2 GWh |
#144 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 303.1 GWh |
#146 | Concho Valley Solar, LLC | San Angelo, TX | 297.2 GWh |
#147 | Panoche Valley Solar Farm | Paicines, CA | 297.0 GWh |
#148 | Newport Solar Project | Newport, AR | 295.9 GWh |
#149 | Midway Solar - TX | Fort Stockton, TX | 295.9 GWh |
#150 | Wistaria Ranch Solar | Calexico, CA | 294.9 GWh |
#151 | Hardin Solar Energy LLC | Alger, OH | 294.6 GWh |
#152 | Hudson - High Desert Hybrid | Victorville, CA | 285.5 GWh |
#153 | Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh |
#154 | Elm Branch Solar 1 | Bardwell, TX | 290.6 GWh |
#155 | East Blackland Solar Project 1 | Manor, TX | 290.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Drew Solar LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Campo Verde Solar | El Centro, CA | 328.6 GWh | 5.8 mi |
Centinela Solar Energy | Calexico, CA | 491.6 GWh | 1 mi |
Centinela State Prison | Sacramento, CA | 18.1 GWh | 11.8 mi |
El Centro Hybrid | El Centro, CA | 1.1 TWh | 10.8 mi |
Heber Geothermal | Heber, CA | 250.1 GWh | 8.8 mi |
Heber Solar | Heber, CA | 25.5 GWh | 7.5 mi |
Imperial Solar Energy Center South | Calexico, CA | 277.2 GWh | 1.7 mi |
Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh | 8.8 mi |
Imperial Valley Solar, LLC | Calexico, CA | 346.4 GWh | 4.7 mi |
IVC Solar | Imperial, CA | 3.7 GWh | 13.6 mi |
Mount Signal Solar Farm II | Calexico, CA | 398.7 GWh | 2.5 mi |
Mount Signal Solar Farm V | Calexico, CA | 608.3 GWh | 5.8 mi |
Second Imperial Geothermal | Heber, CA | 326.6 GWh | 7.8 mi |
SEPV Imperial Dixieland East | Imperial, CA | 5.3 GWh | 9.6 mi |
SEPV Imperial Dixieland West | Imperial, CA | 7.0 GWh | 9.9 mi |
Sol Orchard El Centro PV | El Centro, CA | 46.2 GWh | 10.6 mi |
USG 1 | El Centro, CA | 2.7 GWh | 13.3 mi |
USG 2 | El Centro, CA | 1.6 GWh | 13.5 mi |
Valencia 3 | Imperial, CA | 8.3 GWh | 15.6 mi |
Wistaria Ranch Solar | Calexico, CA | 294.9 GWh | 2.8 mi |