Sandrini Solar 100
12902 C Copus Road, Mettler, CA 93313Plant Summary Information
Sandrini Solar 100 is ranked #90 out of 854 solar farms in California in terms of total annual net electricity generation.
Sandrini Solar 100 generated 33.3 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Sandrini Solar 100 |
|---|---|
| Utility Name | EDPR CA Solar Park II LLC |
| Location | Kern County, CA |
| Initial Operation Date | December 2024 |
| Last Update | Feb 2026 |
| Annual Generation | 230.2 GWh |
| Annual Consumption | 843.8 k MMBtu |
| Ranked #2,325 out of 12,637 Power Plants Nationwide | |
| Ranked #368 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #238 out of 1,603 California Power Plants | |
| Ranked #90 out of 854 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Sandrini Solar 100
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sandrini Solar 100.
Monthly Net Generation for Sandrini Solar 100
Monthly Plant Fuel Consumption for Sandrini Solar 100
Sandrini Solar 100 Details
| Summary Information | |
|---|---|
| Plant Name | Sandrini Solar 100 (65664) |
| Plant Address | 12902 C Copus Road, Mettler, CA 93313 |
| Utility | EDPR CA Solar Park II LLC (64947) |
| Latitude, Longitude | 35.11319, -119.11045 |
| Generation Dates on File | Dec 2024 to Feb 2026 |
| Initial Operation Date | December 2024 |
| Annual Generation | 230.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator GEN02 Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Other Solar Technology | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 140.69 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Sandrini Solar 100 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #358 | SR Snipesville II | Denton, GA | 240.2 GWh |
| #359 | Ragsdale Solar LLC | Canton, MS | 238.1 GWh |
| #360 | West of the Pecos Solar | TBD, TX | 237.8 GWh |
| #361 | San Pablo Raceway | Lancaster, CA | 237.0 GWh |
| #362 | Calhoun County Solar Project | Sheridan Township, MI | 235.5 GWh |
| #363 | RE Mustang LLC | Lemoore, CA | 220.6 GWh |
| #364 | Prairie Mist Solar | Montrose, AR | 233.2 GWh |
| #365 | Dressor Plains Solar, LLC | Herrick, IL | 232.2 GWh |
| #366 | Oak Trail Solar, LLC | Moyock, NC | 231.8 GWh |
| #367 | SR Lumpkin | Lumpkin, GA | 230.9 GWh |
| #369 | Desert Harvest, LLC | Desert Center, CA | 230.8 GWh |
| #370 | SR Arlington II | Blakely, GA | 229.7 GWh |
| #371 | Assembly Solar II LLC | Lennon, MI | 229.0 GWh |
| #372 | Carvers Creek Solar | Gloucester, VA | 228.7 GWh |
| #373 | Bartonsville Energy Facility, LLC | Stephens, VA | 228.7 GWh |
| #374 | Diver Solar, LLC | Thornton, TX | 228.4 GWh |
| #375 | BPL Files Solar | Itasca, TX | 226.7 GWh |
| #376 | Bayou Galion Solar Project | Mer Rouge, LA | 224.8 GWh |
| #377 | Prairie State Solar Project | Swanwick Township, IL | 224.6 GWh |
| #378 | Three Peaks Power | Cedar City, UT | 224.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sandrini Solar 100.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ABEC #3 dba Lakeview Dairy | Bakersfield, CA | 6.0 GWh | 8.7 mi |
| ABEC #4 dba CE&S Dairy | Bakersfield, CA | 7.9 GWh | 4.2 mi |
| ABEC Bidart-Old River LLC | Bakersfield, CA | 16.3 GWh | 3.9 mi |
| Adobe Solar | Arvin, CA | 39.6 GWh | 8.8 mi |
| Algonquin SKIC 10 Solar, LLC | Taft, CA | 14.8 GWh | 7.6 mi |
| Algonquin SKIC20 Solar LLC | Taft, CA | 41.1 GWh | 7.6 mi |
| AVI Bakersfield | Bakersfield, CA | 3.2 GWh | 10.5 mi |
| Cawelo Water District Solar | Famoso, CA | 6.7 GWh | 6 mi |
| IKEA Tejon 345 | Lebec, CA | 929.0 MWh | 13.3 mi |
| Kern Sunset 1886-WD | Bakersfield, CA | 270.0 MWh | 13.6 mi |
| Maricopa West Solar PV, LLC | Taft, CA | 47.6 GWh | 11.7 mi |
| Northern Orchard Solar PV, LLC | Taft, CA | 253.3 GWh | 9.5 mi |
| Orion Solar I | Arvin, CA | 28.3 GWh | 13.6 mi |
| Orion Solar II | Arvin, CA | 19.0 GWh | 13.5 mi |
| RE Old River One, LLC | Bakersfield, CA | 35.6 GWh | 7.7 mi |
| Sandrini Solar 200 | Mettler, CA | 411.1 GWh | 3.3 mi |
| Sunny Cow Solar, LLC | Bakersfield, CA | 5.5 GWh | 10.2 mi |
| Tejon Castac Water District Solar | Arvin, CA | 2.5 GWh | 14.3 mi |
| Vulcan San Emidio Solar | Bakersfield, CA | 3.8 GWh | 6 mi |
| Wheeler Ridge | Bakersfield, CA | 11.9 GWh | 11.8 mi |