Sandrini Solar 100
12902 C Copus Road, Mettler, CA 93313Plant Summary Information
Sandrini Solar 100 is ranked #86 out of 849 solar farms in California in terms of total annual net electricity generation.
Sandrini Solar 100 generated 77.0 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Sandrini Solar 100 |
|---|---|
| Utility Name | EDPR CA Solar Park II LLC |
| Location | Kern County, CA |
| Initial Operation Date | December 2024 |
| Last Update | Oct 2025 |
| Annual Generation | 241.0 GWh |
| Annual Consumption | 822.3 k MMBtu |
| Ranked #2,265 out of 12,553 Power Plants Nationwide | |
| Ranked #345 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #231 out of 1,601 California Power Plants | |
| Ranked #86 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Sandrini Solar 100
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sandrini Solar 100.
Monthly Net Generation for Sandrini Solar 100
Sandrini Solar 100 Details
| Summary Information | |
|---|---|
| Plant Name | Sandrini Solar 100 (65664) |
| Plant Address | 12902 C Copus Road, Mettler, CA 93313 |
| Utility | EDPR CA Solar Park II LLC (64947) |
| Latitude, Longitude | 35.11319, -119.11045 |
| Generation Dates on File | Dec 2024 to Oct 2025 |
| Initial Operation Date | December 2024 |
| Annual Generation | 241.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator GEN02 Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Other Solar Technology | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 140.69 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Sandrini Solar 100 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #335 | Hickory Solar | Jerseyville, IL | 249.4 GWh |
| #336 | West of the Pecos Solar | TBD, TX | 248.2 GWh |
| #337 | Blue Bird Solar, LLC | Warrenton, MO | 246.9 GWh |
| #338 | SR Snipesville II | Denton, GA | 246.4 GWh |
| #339 | Taylor County Solar | Butler, GA | 245.4 GWh |
| #340 | OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh |
| #341 | Liberty County Solar Project | Dayton, TX | 244.7 GWh |
| #342 | Galloway 2 Solar Farm | Paint Rock, TX | 243.7 GWh |
| #343 | Lockhart Solar PV, LLC | Hinkley, CA | 243.6 GWh |
| #344 | Chesapeake Solar Project | Chesapeake, VA | 243.2 GWh |
| #346 | Ivanpah 2 | Nipton, CA | 250.9 GWh |
| #347 | Posey Solar | Mount Vernon, IN | 238.1 GWh |
| #348 | Oak Trail Solar, LLC | Moyock, NC | 235.5 GWh |
| #349 | Green River Solar | Guston, KY | 234.9 GWh |
| #350 | Great Cove Solar II | Saint Thomas, PA | 234.6 GWh |
| #351 | RE Mustang LLC | Lemoore, CA | 220.6 GWh |
| #352 | Desert Harvest, LLC | Desert Center, CA | 233.7 GWh |
| #353 | Wagyu | Damon, TX | 233.6 GWh |
| #354 | Ragsdale Solar LLC | Canton, MS | 233.4 GWh |
| #355 | Quartz Solar, LLC | Wynne, AR | 232.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sandrini Solar 100.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ABEC #3 dba Lakeview Dairy | Bakersfield, CA | 6.0 GWh | 8.7 mi |
| ABEC #4 dba CE&S Dairy | Bakersfield, CA | 7.9 GWh | 4.2 mi |
| ABEC Bidart-Old River LLC | Bakersfield, CA | 16.3 GWh | 3.9 mi |
| Adobe Solar | Arvin, CA | 39.6 GWh | 8.8 mi |
| Algonquin SKIC 10 Solar, LLC | Taft, CA | 14.8 GWh | 7.6 mi |
| Algonquin SKIC20 Solar LLC | Taft, CA | 41.1 GWh | 7.6 mi |
| AVI Bakersfield | Bakersfield, CA | 3.2 GWh | 10.5 mi |
| Cawelo Water District Solar | Famoso, CA | 6.7 GWh | 6 mi |
| IKEA Tejon 345 | Lebec, CA | 929.0 MWh | 13.3 mi |
| Kern Sunset 1886-WD | Bakersfield, CA | 270.0 MWh | 13.6 mi |
| Maricopa West Solar PV, LLC | Taft, CA | 47.6 GWh | 11.7 mi |
| Northern Orchard Solar PV, LLC | Taft, CA | 181.4 GWh | 9.5 mi |
| Orion Solar I | Arvin, CA | 28.3 GWh | 13.6 mi |
| Orion Solar II | Arvin, CA | 19.0 GWh | 13.5 mi |
| RE Old River One, LLC | Bakersfield, CA | 35.6 GWh | 7.7 mi |
| Sandrini Solar 200 | Mettler, CA | 423.7 GWh | 3.3 mi |
| Sunny Cow Solar, LLC | Bakersfield, CA | 5.5 GWh | 10.2 mi |
| Tejon Castac Water District Solar | Arvin, CA | 2.5 GWh | 14.3 mi |
| Vulcan San Emidio Solar | Bakersfield, CA | 3.8 GWh | 6 mi |
| Wheeler Ridge | Bakersfield, CA | 11.9 GWh | 11.8 mi |