Maverick Solar 7, LLC
29722 Corn Springs Road, Desert Center, CA 92239Plant Summary Information
Maverick Solar 7, LLC is ranked #46 out of 834 solar farms in California in terms of total annual net electricity generation.
Maverick Solar 7, LLC generated 82.6 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Maverick Solar 7, LLC |
|---|---|
| Utility Name | Maverick Solar 7, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | December 2021 |
| Last Update | Mar 2026 |
| Annual Generation | 391.5 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,628 out of 12,332 Power Plants Nationwide | |
| Ranked #180 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #117 out of 1,530 California Power Plants | |
| Ranked #46 out of 834 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Maverick Solar 7, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Maverick Solar 7, LLC.
Monthly Net Generation for Maverick Solar 7, LLC
Monthly Plant Fuel Consumption for Maverick Solar 7, LLC
Maverick Solar 7, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Maverick Solar 7, LLC (64106) |
| Plant Address | 29722 Corn Springs Road, Desert Center, CA 92239 |
| Utility | Maverick Solar 7, LLC (63734) |
| Latitude, Longitude | 33.7, -115.38 |
| Generation Dates on File | Dec 2021 to Mar 2026 |
| Initial Operation Date | December 2021 |
| Annual Generation | 391.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator MAV05 Details Operating December 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 132 MW |
| Summer Capacity | 132 MW |
| Winter Capacity | 132 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 179 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Maverick Solar 7, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #170 | Swift Air Solar I | Goldsmith, TX | 402.4 GWh |
| #171 | Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh |
| #172 | Misae Solar | Childress, TX | 401.3 GWh |
| #173 | Scarlet II Hybrid | Cantua Creek, CA | 378.1 GWh |
| #174 | Mount Signal Solar Farm II | Calexico, CA | 399.3 GWh |
| #175 | Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 385.2 GWh |
| #176 | Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh |
| #177 | Mustang Two | Lemoore, CA | 398.9 GWh |
| #178 | Pixley Solar Energy | Pixley, KS | 397.6 GWh |
| #179 | Madison Fields Solar Project, LLC | Irwin, OH | 394.7 GWh |
| #181 | Shakes Solar | Carrizo Springs, TX | 391.4 GWh |
| #182 | Buena Vista Energy Center | Chaparral, NM | 388.2 GWh |
| #183 | Riverstart Solar Park LLC | Modoc, IN | 389.4 GWh |
| #184 | Crooked Lake Solar, LLC | Blytheville, AR | 388.2 GWh |
| #185 | North Rosamond Solar LLC | Rosamond, CA | 388.1 GWh |
| #186 | Yellow Pine II | Enterprise, NV | 372.9 GWh |
| #187 | Yellow Pine Solar | Enterprise, NV | 376.4 GWh |
| #188 | Samson Solar Energy II LLC | Cunningham, TX | 386.3 GWh |
| #189 | Big Plain Solar, LLC | London, OH | 386.2 GWh |
| #190 | Indiana Crossroads Solar Park | Reynolds, IN | 380.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Maverick Solar 7, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arica Solar | Desert Center, CA | 789.7 GWh | 3.7 mi |
| Athos Solar Project | Desert Center, CA | 712.8 GWh | 3.8 mi |
| Chuckawalla Solar | Blythe, CA | 7.1 GWh | 28.1 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 1.4 GWh | 28.9 mi |
| Desert Harvest II LLC | Desert Center, CA | 192.0 GWh | 6.9 mi |
| Desert Harvest, LLC | Desert Center, CA | 234.7 GWh | 6.9 mi |
| Desert Sunlight 250, LLC | Desert Center, CA | 555.7 GWh | 7.3 mi |
| Desert Sunlight 300, LLC | Desert Center, CA | 666.9 GWh | 8.5 mi |
| Genesis Solar Energy Project | Blythe, CA | 603.8 GWh | 22.1 mi |
| Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 46.2 GWh | 31.7 mi |
| Ironwood Solar LLC | Blythe, CA | 7.5 GWh | 28.2 mi |
| Maverick Solar 4, LLC | Desert Center, CA | 291.4 GWh | 0 mi |
| Maverick Solar 6, LLC | Desert Center, CA | 277.5 GWh | 0 mi |
| Maverick Solar, LLC | Desert Center, CA | 369.3 GWh | 0 mi |
| Oberon II Solar Project | Desert Center, CA | 600.8 GWh | 2 mi |
| Oberon Solar Project | Desert Center, CA | 605.1 GWh | 2 mi |
| SE Athos II, LLC | Desert Center, CA | 566.9 GWh | 3.8 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 996.0 MWh | 28.1 mi |
| Victory Pass | Desert Center, CA | 564.7 GWh | 3.7 mi |
| Wister Solar | Niland, CA | 28.2 GWh | 30.6 mi |