Arica Solar
37947 DC 379, Desert Center, CA 92239Plant Summary Information
Arica Solar is ranked #41 out of 7,209 solar farms nationwide in terms of total annual net electricity generation.
Arica Solar generated 236.2 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Arica Solar |
|---|---|
| Utility Name | Arica Solar, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | March 2024 |
| Last Update | Aug 2026 |
| Annual Generation | 722.5 GWh |
| Annual Consumption | 2.8 M MMBtu |
| Ranked #1,000 out of 13,301 Power Plants Nationwide | |
| Ranked #41 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #43 out of 1,641 California Power Plants | |
| Ranked #7 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Arica Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Arica Solar.
Monthly Net Generation for Arica Solar
Monthly Plant Fuel Consumption for Arica Solar
Arica Solar Details
| Summary Information | |
|---|---|
| Plant Name | Arica Solar (65744) |
| Plant Address | 37947 DC 379, Desert Center, CA 92239 |
| Utility | Arica Solar, LLC (64996) |
| Latitude, Longitude | 33.701, -115.31629 |
| Generation Dates on File | Mar 2024 to Aug 2026 |
| Initial Operation Date | March 2024 |
| Annual Generation | 722.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | Yes |
Generator ARCBA Details Operating March 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 136 MW |
| Summer Capacity | 136 MW |
| Winter Capacity | 136 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 544 |
|---|---|
| Maximum Charge Rate | 136 MW |
| Maximum Discharge Rate | 136 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 45 |
| Storage Enclosure Type | CT |
| Arbitrage | P |
| Frequency Regulation | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | No |
| Direct Support Plant Id | 64996 |
| Direct Support Gen Id | ARCPV |
| Support T D Asset | No |
Generator ARCPV Details Operating March 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 263 MW |
| Summer Capacity | 263 MW |
| Winter Capacity | 263 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 350 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Arica Solar Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #31 | Red Tailed Hawk Solar LLC | El Campo, TX | 808.2 GWh |
| #32 | Eleven Mile Solar Center | Coolidge, AZ | 767.3 GWh |
| #33 | Sun Streams 4 | Tonopah, AZ | 732.3 GWh |
| #34 | Solar Star 2 | Rosamond, CA | 769.1 GWh |
| #35 | Parliament Solar | Waller, TX | 766.0 GWh |
| #36 | Cottonwood Bayou Solar | Liverpool, TX | 765.3 GWh |
| #37 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 735.5 GWh |
| #38 | Atrisco Solar LLC | Rio Rancho, NM | 753.9 GWh |
| #39 | Juno Solar Project | Lamesa, TX | 751.8 GWh |
| #40 | Mammoth North Solar | Knox, IN | 751.5 GWh |
| #42 | Rexford Solar Farm | Ducor, CA | 711.8 GWh |
| #43 | BT Hickerson Solar, LLC | Clifton, TX | 737.3 GWh |
| #44 | Hecate Energy Longhorn Solar LLC | Jacksboro, TX | 737.1 GWh |
| #45 | Lumina II Solar Project | Snyder, TX | 719.6 GWh |
| #46 | Copper Mountain Solar 2 | Boulder City, NV | 726.0 GWh |
| #47 | Texas Solar Nova 1 | Spur, TX | 725.2 GWh |
| #48 | Hill Solar 1 | Itasca, TX | 723.0 GWh |
| #49 | Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 697.9 GWh |
| #50 | Peregrine Solar | Gollad, TX | 719.9 GWh |
| #51 | Five Wells Solar Center - Hybrid | Rogers, TX | 695.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Arica Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Energy Center II | Blythe, CA | 624.2 GWh | 31.1 mi |
| Arlington Energy Center III | Blythe, CA | 329.2 GWh | 31.1 mi |
| Athos Solar Project | Desert Center, CA | 670.5 GWh | 4.1 mi |
| Chuckawalla Solar | Blythe, CA | 7.3 GWh | 24.7 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 502.0 MWh | 25.5 mi |
| Desert Harvest II LLC | Desert Center, CA | 192.7 GWh | 7.8 mi |
| Desert Harvest, LLC | Desert Center, CA | 228.7 GWh | 7.8 mi |
| Desert Sunlight 250, LLC | Desert Center, CA | 516.8 GWh | 8.5 mi |
| Desert Sunlight 300, LLC | Desert Center, CA | 620.2 GWh | 9.5 mi |
| Genesis Solar Energy Project | Blythe, CA | 581.1 GWh | 18.5 mi |
| Ironwood Solar LLC | Blythe, CA | 7.3 GWh | 24.8 mi |
| Maverick Solar 4, LLC | Desert Center, CA | 292.4 GWh | 3.7 mi |
| Maverick Solar 6, LLC | Desert Center, CA | 227.9 GWh | 3.7 mi |
| Maverick Solar 7, LLC | Desert Center, CA | 396.7 GWh | 3.7 mi |
| Maverick Solar, LLC | Desert Center, CA | 309.2 GWh | 3.7 mi |
| Oberon II Solar Project | Desert Center, CA | 560.0 GWh | 4.3 mi |
| Oberon Solar Project | Desert Center, CA | 557.0 GWh | 4.3 mi |
| SE Athos II, LLC | Desert Center, CA | 509.8 GWh | 4.1 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 1.4 GWh | 24.7 mi |
| Victory Pass | Desert Center, CA | 561.4 GWh | 0 mi |