Mount Signal Solar Farm V
392 Weed Road, Calexico, CA 92231Plant Summary Information
Mount Signal Solar Farm V is ranked #47 out of 6,487 solar farms nationwide in terms of total annual net electricity generation.
Mount Signal Solar Farm V generated 117.8 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Mount Signal Solar Farm V |
|---|---|
| Utility Name | Imperial Valley Solar 3, LLC |
| Location | Imperial County, CA |
| Initial Operation Date | November 2018 |
| Last Update | Feb 2026 |
| Annual Generation | 674.4 GWh |
| Annual Consumption | 2.5 M MMBtu |
| Ranked #1,036 out of 12,637 Power Plants Nationwide | |
| Ranked #47 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #50 out of 1,603 California Power Plants | |
| Ranked #12 out of 854 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
93LF 8me LLC (2016 to 2016) CD Arevon USA, Inc. (2017 to 2018) Imperial Valley Solar 3, LLC (2019 to 2024) |
Map of Mount Signal Solar Farm V
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mount Signal Solar Farm V.
Monthly Net Generation for Mount Signal Solar Farm V
Monthly Plant Fuel Consumption for Mount Signal Solar Farm V
Mount Signal Solar Farm V Details
| Summary Information | |
|---|---|
| Plant Name | Mount Signal Solar Farm V (61202) |
| Plant Address | 392 Weed Road, Calexico, CA 92231 |
| Utility | Imperial Valley Solar 3, LLC (63447) |
| Latitude, Longitude | 32.67881, -115.56721 |
| Generation Dates on File | Nov 2018 to Feb 2026 |
| Initial Operation Date | November 2018 |
| Annual Generation | 674.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG17-145-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator MTSG3 Details Operating November 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 252.3 MW |
| Summer Capacity | 252.3 MW |
| Winter Capacity | 252.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 328.1 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Mount Signal Solar Farm V Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #37 | Lumina II Solar Project | Snyder, TX | 692.9 GWh |
| #38 | Athos Solar Project | Desert Center, CA | 699.6 GWh |
| #39 | Neptune Energy Center Hybrid | Boone, CO | 677.5 GWh |
| #40 | McFarland B Solar and Storage | Dateland, AZ | 677.4 GWh |
| #41 | Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 665.8 GWh |
| #42 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 668.1 GWh |
| #43 | Copper Mountain Solar 5, LLC | Boulder City, NV | 684.5 GWh |
| #44 | Lumina Solar Project | Snyder, TX | 670.1 GWh |
| #45 | Solar Blue | Lemoore, CA | 641.8 GWh |
| #46 | Silver State Solar Power South | Primm Valley, NV | 675.6 GWh |
| #48 | Hecate Energy Outpost Solar LLC | Laredo, TX | 672.3 GWh |
| #49 | McCoy Solar Energy Project Hybrid | Blythe, CA | 646.7 GWh |
| #50 | Desert Sunlight 300, LLC | Desert Center, CA | 666.9 GWh |
| #51 | AEUG Union Solar, LLC | West Mansfield, OH | 665.1 GWh |
| #52 | Arlington Energy Center II | Blythe, CA | 636.7 GWh |
| #53 | IP Radian, LLC | Brookesmith, TX | 662.6 GWh |
| #54 | Prospero Solar II | Andrews, TX | 659.8 GWh |
| #55 | Aquamarine | Lemoore, CA | 647.4 GWh |
| #56 | Wadley Solar | Wadley, GA | 623.4 GWh |
| #57 | Stateline Solar | Nipton, CA | 619.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mount Signal Solar Farm V.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Campo Verde Solar | El Centro, CA | 294.7 GWh | 10.6 mi |
| Centinela Solar Energy | Calexico, CA | 352.7 GWh | 4.7 mi |
| Centinela State Prison | Sacramento, CA | 16.7 GWh | 16.1 mi |
| Drew Solar LLC | Calexico, CA | 308.6 GWh | 5.8 mi |
| Drop 5 (CA) | Calexico, CA | 6.4 GWh | 10.2 mi |
| El Centro Hybrid | El Centro, CA | 1.0 TWh | 8.7 mi |
| Heber Geothermal | Heber, CA | 384.9 GWh | 3.8 mi |
| Heber Solar | Heber, CA | 24.6 GWh | 2.8 mi |
| Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh | 5.4 mi |
| Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh | 13.9 mi |
| Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh | 1.3 mi |
| IVC Solar | Imperial, CA | 4.2 GWh | 11.1 mi |
| Mount Signal Solar Farm II | Calexico, CA | 401.9 GWh | 3.7 mi |
| Second Imperial Geothermal | Heber, CA | 302.3 GWh | 3.1 mi |
| SEPV Imperial Dixieland East | Imperial, CA | 4.2 GWh | 14.3 mi |
| SEPV Imperial Dixieland West | Imperial, CA | 7.8 GWh | 14.7 mi |
| Sol Orchard El Centro PV | El Centro, CA | 47.1 GWh | 8.7 mi |
| Spreckels Sugar Company | Brawley, CA | 19.9 GWh | 16.1 mi |
| Valencia 3 | Imperial, CA | 6.6 GWh | 14.4 mi |
| Wistaria Ranch Solar | Calexico, CA | 288.5 GWh | 3 mi |