Springbok 3 Solar Farm Hybrid
31997 Cholla Rd, Cantil, CA 93519Plant Summary Information
Springbok 3 Solar Farm Hybrid is ranked #88 out of 834 solar farms in California in terms of total annual net electricity generation.
Springbok 3 Solar Farm Hybrid generated 43.2 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Springbok 3 Solar Farm Hybrid |
|---|---|
| Utility Name | 64KT 8me LLC |
| Location | Kern County, CA |
| Initial Operation Date | July 2019 |
| Last Update | Mar 2026 |
| Annual Generation | 243.4 GWh |
| Annual Consumption | 904.9 k MMBtu |
| Ranked #2,270 out of 12,332 Power Plants Nationwide | |
| Ranked #360 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #225 out of 1,530 California Power Plants | |
| Ranked #88 out of 834 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Springbok 3 Solar Farm Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Springbok 3 Solar Farm Hybrid.
Monthly Net Generation for Springbok 3 Solar Farm Hybrid
Monthly Plant Fuel Consumption for Springbok 3 Solar Farm Hybrid
Springbok 3 Solar Farm Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Springbok 3 Solar Farm Hybrid (60491) |
| Plant Address | 31997 Cholla Rd, Cantil, CA 93519 |
| Utility | 64KT 8me LLC (60278) |
| Latitude, Longitude | 35.17115, -118.00165 |
| Generation Dates on File | Jul 2019 to Mar 2026 |
| Initial Operation Date | July 2019 |
| Annual Generation | 243.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator SB3BS Details Operating July 2019
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 1.5 |
|---|---|
| Maximum Charge Rate | 1.5 MW |
| Maximum Discharge Rate | 1.5 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 1.5 |
| Storage Enclosure Type | CT |
| Frequency Regulation | Yes |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | P |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 60491 |
| Direct Support Gen Id | SB3SF |
| Support T D Asset | No |
Generator SB3SF Details Operating July 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 90 MW |
| Summer Capacity | 90 MW |
| Winter Capacity | 90 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 119.6 MW |
| Crystalline Silicon | Yes |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Springbok 3 Solar Farm Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #350 | Hickory Solar | Jerseyville, IL | 249.5 GWh |
| #351 | Great Cove Solar II | Saint Thomas, PA | 249.5 GWh |
| #352 | Flat Fork Solar | Wheatley, AR | 248.5 GWh |
| #353 | Calhoun County Solar Project | Sheridan Township, MI | 247.0 GWh |
| #354 | East Line Solar | Coolidge, AZ | 246.4 GWh |
| #355 | Lockhart Solar PV, LLC | Hinkley, CA | 242.5 GWh |
| #356 | Taylor County Solar | Butler, GA | 245.4 GWh |
| #357 | OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh |
| #358 | Orange Grove | Jim Wells, TX | 244.0 GWh |
| #359 | Franklin Solar Hybrid | Twin Falls, ID | 243.9 GWh |
| #361 | Winfield Solar | Winfield, MO | 242.9 GWh |
| #362 | SR Snipesville II | Denton, GA | 242.0 GWh |
| #363 | Ragsdale Solar LLC | Canton, MS | 241.0 GWh |
| #364 | Galloway 2 Solar Farm | Paint Rock, TX | 240.9 GWh |
| #365 | Chesapeake Solar Project | Chesapeake, VA | 240.4 GWh |
| #366 | Willow Spring Solar, LLC | Rosamond, CA | 239.9 GWh |
| #367 | San Pablo Raceway | Lancaster, CA | 239.5 GWh |
| #368 | Wagyu | Damon, TX | 238.7 GWh |
| #369 | Roaring Springs, LLC | Motley, TX | 236.2 GWh |
| #370 | Bartonsville Energy Facility, LLC | Stephens, VA | 235.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Springbok 3 Solar Farm Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beacon Solar Plant Site 2 | Cantil, CA | 112.2 GWh | 6.5 mi |
| Beacon Solar Plant Site 5 | Cantil, CA | 89.9 GWh | 5.7 mi |
| Bellefield Solar and Energy Storage Farm | Mojave, CA | 270.9 GWh | 8.9 mi |
| CalCity Solar 1 | California City, CA | 7.9 GWh | 2.9 mi |
| California City | California City, CA | 4.6 GWh | 1.5 mi |
| Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 12.7 mi |
| Edwards Sanborn S1 | Mojave, CA | 102.4 GWh | 12.4 mi |
| Edwards Sanborn S3 | Mojave, CA | 84.6 GWh | 12.7 mi |
| Edwards Sanborn S4 | Mojave, CA | 91.5 GWh | 12.8 mi |
| Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 669.7 GWh | 3.9 mi |
| Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 385.2 GWh | 3.4 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 128.9 GWh | 6.8 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 121.6 GWh | 5.7 mi |
| Hecate Energy Beacon Solar 4 | Cantil, CA | 116.8 GWh | 5.9 mi |
| Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 11.7 mi |
| Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 11.2 mi |
| RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 4.4 mi |
| Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 12.9 mi |
| Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 6 mi |
| Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 5.6 mi |