Eland Solar & Storage Center, Phase 2 Hy
TBD, Mojave, CA 93301Plant Summary Information
Eland Solar & Storage Center, Phase 2 Hy is ranked #18 out of 886 solar farms in California in terms of total annual net electricity generation.
Eland Solar & Storage Center, Phase 2 Hy generated 209.9 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Eland Solar & Storage Center, Phase 2 Hy |
|---|---|
| Utility Name | 69SV 8me LLC |
| Location | Kern County, CA |
| Initial Operation Date | July 2025 |
| Last Update | Jun 2026 |
| Annual Generation | 595.1 GWh |
| Annual Consumption | 2.1 M MMBtu |
| Ranked #1,163 out of 13,094 Power Plants Nationwide | |
| Ranked #66 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #62 out of 1,607 California Power Plants | |
| Ranked #18 out of 886 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Eland Solar & Storage Center, Phase 2 Hy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eland Solar & Storage Center, Phase 2 Hy.
Monthly Net Generation for Eland Solar & Storage Center, Phase 2 Hy
Monthly Plant Fuel Consumption for Eland Solar & Storage Center, Phase 2 Hy
Eland Solar & Storage Center, Phase 2 Hy Details
| Summary Information | |
|---|---|
| Plant Name | Eland Solar & Storage Center, Phase 2 Hy (61169) |
| Plant Address | TBD, Mojave, CA 93301 |
| Utility | 69SV 8me LLC (60798) |
| Latitude, Longitude | 35.2167, -117.977 |
| Generation Dates on File | Jul 2025 to Jun 2026 |
| Initial Operation Date | July 2025 |
| Annual Generation | 595.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator 61169 Details Operating July 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 150 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 600 |
|---|---|
| Maximum Charge Rate | 150 MW |
| Maximum Discharge Rate | 150 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 100 |
| Storage Enclosure Type | CS |
| Load Management | Yes |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 61169 |
| Direct Support Gen Id | 60798 |
| Support T D Asset | Yes |
Generator 69SV8 Details Operating July 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 308 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Dual Axis Tracking | No |
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 373.86 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Eland Solar & Storage Center, Phase 2 Hy Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | Generator 61169 | 100.00% |
| Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | Generator 69SV8 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #56 | Prospero Solar II | Andrews, TX | 653.3 GWh |
| #57 | Lumina Solar Project | Snyder, TX | 630.3 GWh |
| #58 | Aquamarine | Lemoore, CA | 648.1 GWh |
| #59 | Stateline Solar | Nipton, CA | 640.1 GWh |
| #60 | Hecate Energy Highland LLC | Buford, OH | 636.3 GWh |
| #61 | Mount Signal Solar Farm V | Calexico, CA | 635.0 GWh |
| #62 | Silver State Solar Power South | Primm Valley, NV | 629.0 GWh |
| #63 | Desert Sunlight 300, LLC | Desert Center, CA | 620.2 GWh |
| #64 | Wadley Solar | Wadley, GA | 619.6 GWh |
| #65 | Arrow Canyon Solar Hybrid | Moapa, NV | 604.1 GWh |
| #67 | Moapa Southern Paiute | Moapa, NV | 612.9 GWh |
| #68 | Copper Mountain Solar 3 | Boulder City, NV | 602.9 GWh |
| #69 | Genesis Solar Energy Project | Blythe, CA | 600.0 GWh |
| #70 | Mojave Solar Project | Hinkley, CA | 595.9 GWh |
| #71 | Oberon II Solar Project | Desert Center, CA | 575.8 GWh |
| #72 | Blythe Mesa Solar II | Blythe, CA | 574.9 GWh |
| #73 | Oberon Solar Project | Desert Center, CA | 569.1 GWh |
| #74 | Victory Pass | Desert Center, CA | 568.9 GWh |
| #75 | Parliament Solar | Waller, TX | 573.3 GWh |
| #76 | Ray Ranch Solar | Pettus, TX | 572.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eland Solar & Storage Center, Phase 2 Hy.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beacon Solar Plant Site 2 | Cantil, CA | 105.2 GWh | 3.6 mi |
| Beacon Solar Plant Site 5 | Cantil, CA | 82.9 GWh | 3.9 mi |
| Bellefield Solar and Energy Storage Farm | Mojave, CA | 508.7 GWh | 12.3 mi |
| CalCity Solar 1 | California City, CA | 8.0 GWh | 5.2 mi |
| California City | California City, CA | 5.1 GWh | 4.1 mi |
| Difwind Farms Ltd VI | Mojave, CA | 12.6 GWh | 15.9 mi |
| Edwards Sanborn S1 | Mojave, CA | 98.6 GWh | 15.8 mi |
| Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 716.5 GWh | 0.5 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 124.6 GWh | 4.2 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 118.3 GWh | 3.3 mi |
| Hecate Energy Beacon Solar 4 | Cantil, CA | 114.7 GWh | 3.8 mi |
| North Sky River Energy LLC | Weldon, CA | 364.8 GWh | 14.9 mi |
| Pine Tree Solar Project | Owenyo, CA | 7.4 GWh | 12.4 mi |
| Pine Tree Wind Power Project | Cantil, CA | 123.0 GWh | 11.4 mi |
| RE Barren Ridge 1 | Mojave, CA | 164.4 GWh | 5.2 mi |
| Rising Tree Wind Farm II | Mojave, CA | 53.7 GWh | 15.7 mi |
| Sky River Wind Energy Center | Tehachapi, CA | 211.5 GWh | 15.5 mi |
| Springbok 3 Solar Farm Hybrid | Cantil, CA | 233.3 GWh | 3.4 mi |
| Springbok Solar Farm 1 | Cantil, CA | 280.4 GWh | 2.6 mi |
| Springbok Solar Farm 2 | Cantil, CA | 397.1 GWh | 2.3 mi |