Eland Solar & Storage Center, Phase 2 Hy
TBD, Mojave, CA 93301Plant Summary Information
Eland Solar & Storage Center, Phase 2 Hy is ranked #59 out of 854 solar farms in California in terms of total annual net electricity generation.
Eland Solar & Storage Center, Phase 2 Hy generated 104.9 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Eland Solar & Storage Center, Phase 2 Hy |
|---|---|
| Utility Name | 69SV 8me LLC |
| Location | Kern County, CA |
| Initial Operation Date | Not Available |
| Last Update | Feb 2026 |
| Annual Generation | 329.0 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,871 out of 12,637 Power Plants Nationwide | |
| Ranked #231 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #156 out of 1,603 California Power Plants | |
| Ranked #59 out of 854 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Eland Solar & Storage Center, Phase 2 Hy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eland Solar & Storage Center, Phase 2 Hy.
Monthly Net Generation for Eland Solar & Storage Center, Phase 2 Hy
Monthly Plant Fuel Consumption for Eland Solar & Storage Center, Phase 2 Hy
Eland Solar & Storage Center, Phase 2 Hy Details
| Summary Information | |
|---|---|
| Plant Name | Eland Solar & Storage Center, Phase 2 Hy (61169) |
| Plant Address | TBD, Mojave, CA 93301 |
| Utility | 69SV 8me LLC (60798) |
| Latitude, Longitude | 35.2167, -117.977 |
| Generation Dates on File | Jul 2025 to Feb 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 329.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Eland Solar & Storage Center, Phase 2 Hy Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | 100.00% |
| Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #221 | Calhoun Solar | Battle Creek, MI | 354.9 GWh |
| #222 | Ganado Solar | Gail, TX | 347.1 GWh |
| #223 | Centinela Solar Energy | Calexico, CA | 352.7 GWh |
| #224 | Blythe Solar II, LLC | Blythe, CA | 336.8 GWh |
| #225 | Aragorn Solar Project | Van Horn, TX | 345.5 GWh |
| #226 | Edwards Sanborn E1A | Mojave, CA | 328.9 GWh |
| #227 | Arlington Energy Center III | Blythe, CA | 323.9 GWh |
| #228 | Buckthorn Westex | Ft. Stockton, TX | 341.4 GWh |
| #229 | West Memphis Solar Station | Crawfordsville, AR | 341.4 GWh |
| #230 | Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh |
| #232 | Daybreak Solar | Maupin, OR | 337.2 GWh |
| #233 | Sun Streams 2 | Hassayampa, AZ | 336.2 GWh |
| #234 | Cass County Renewable Energy Center | Beardstown, IL | 335.0 GWh |
| #235 | Hardin Solar Energy II LLC | Belle Center, OH | 333.5 GWh |
| #236 | Vikings Energy Farm | Holtville, CA | 309.7 GWh |
| #237 | Twin Lakes Solar LLC | Monticello, IN | 328.6 GWh |
| #238 | Golden Triangle II | St.Artesia, MS | 319.6 GWh |
| #239 | Edwards Sanborn E4 | Mojave, CA | 321.4 GWh |
| #240 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 297.8 GWh |
| #241 | Umbriel Solar | Livington, TX | 324.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eland Solar & Storage Center, Phase 2 Hy.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beacon Solar Plant Site 2 | Cantil, CA | 111.7 GWh | 3.6 mi |
| Beacon Solar Plant Site 5 | Cantil, CA | 88.5 GWh | 3.9 mi |
| Bellefield Solar and Energy Storage Farm | Mojave, CA | 143.9 GWh | 12.3 mi |
| CalCity Solar 1 | California City, CA | 7.9 GWh | 5.2 mi |
| California City | California City, CA | 4.6 GWh | 4.1 mi |
| Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 15.9 mi |
| Edwards Sanborn S1 | Mojave, CA | 100.4 GWh | 15.8 mi |
| Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 665.8 GWh | 0.5 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 127.6 GWh | 4.2 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 120.7 GWh | 3.3 mi |
| Hecate Energy Beacon Solar 4 | Cantil, CA | 115.3 GWh | 3.8 mi |
| North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 14.9 mi |
| Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 12.4 mi |
| Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 11.4 mi |
| RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 5.2 mi |
| Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 15.7 mi |
| Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 15.5 mi |
| Springbok 3 Solar Farm Hybrid | Cantil, CA | 243.2 GWh | 3.4 mi |
| Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 2.6 mi |
| Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 2.3 mi |