Blythe Mesa Solar II
16489 Mesa Drive, Blythe, CA 92225Plant Summary Information
Blythe Mesa Solar II is ranked #20 out of 849 solar farms in California in terms of total annual net electricity generation.
Blythe Mesa Solar II generated 181.6 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Blythe Mesa Solar II |
|---|---|
| Utility Name | Blythe Mesa Solar II, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | December 2022 |
| Last Update | Sep 2025 |
| Annual Generation | 584.4 GWh |
| Annual Consumption | 2.3 M MMBtu |
| Ranked #1,173 out of 12,539 Power Plants Nationwide | |
| Ranked #58 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #70 out of 1,600 California Power Plants | |
| Ranked #20 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Blythe Mesa Solar II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blythe Mesa Solar II.
Monthly Net Generation for Blythe Mesa Solar II
Blythe Mesa Solar II Details
| Summary Information | |
|---|---|
| Plant Name | Blythe Mesa Solar II (65053) |
| Plant Address | 16489 Mesa Drive, Blythe, CA 92225 |
| Utility | Blythe Mesa Solar II, LLC (64459) |
| Latitude, Longitude | 33.64081, -114.68026 |
| Generation Dates on File | Dec 2022 to Sep 2025 |
| Initial Operation Date | December 2022 |
| Annual Generation | 584.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 21-164-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | Yes |
Generator BMSES Details Operating December 2022
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CENTPD_2_BMSX2-APND |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CENTPD_2_BMSX2 |
| Nameplate Capacity | 112 MW |
| Summer Capacity | 112 MW |
| Winter Capacity | 112 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 448 |
|---|---|
| Maximum Charge Rate | 112 MW |
| Maximum Discharge Rate | 112 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 36.8 |
| Storage Enclosure Type | CS |
| Arbitrage | Yes |
| Co Located Renewable Firming | Yes |
| Excess Wind And Solar Generation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 65053 |
| Direct Support Gen Id | IPBMS |
| Support T D Asset | No |
Generator IPBMS Details Operating December 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CENTPD_2_BMSSX2-APND |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CENTPD_2_BMSSX2 |
| Nameplate Capacity | 223.6 MW |
| Summer Capacity | 223.6 MW |
| Winter Capacity | 223.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 310.9 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Blythe Mesa Solar II Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #48 | IP Radian, LLC | Brookesmith, TX | 627.7 GWh |
| #49 | Genesis Solar Energy Project | Blythe, CA | 623.0 GWh |
| #50 | Stateline Solar | Nipton, CA | 619.9 GWh |
| #51 | Victory Pass | Desert Center, CA | 609.7 GWh |
| #52 | Oberon II Solar Project | Desert Center, CA | 598.4 GWh |
| #53 | Arrow Canyon Solar Hybrid | Moapa, NV | 600.6 GWh |
| #54 | Moapa Southern Paiute | Moapa, NV | 613.1 GWh |
| #55 | Copper Mountain Solar 3 | Boulder City, NV | 607.4 GWh |
| #56 | Wadley Solar | Wadley, GA | 602.3 GWh |
| #57 | Hecate Energy Highland LLC | Buford, OH | 602.1 GWh |
| #59 | Oberon Solar Project | Desert Center, CA | 581.0 GWh |
| #60 | AEUG Union Solar, LLC | West Mansfield, OH | 599.5 GWh |
| #61 | California Valley Solar Ranch | California Valley, CA | 597.7 GWh |
| #62 | Blythe Solar 110, LLC | Blythe, CA | 580.5 GWh |
| #63 | Mojave Solar Project | Hinkley, CA | 587.8 GWh |
| #64 | Bighorn Solar 1 | Pueblo, CO | 587.6 GWh |
| #65 | Rexford Solar Farm | Ducor, CA | 558.8 GWh |
| #66 | Titan Solar Project | Van Horn, TX | 573.2 GWh |
| #67 | Oxbow Solar 1 | New Roads, LA | 571.8 GWh |
| #68 | AV Solar Ranch One | Lancaster, CA | 569.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blythe Mesa Solar II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Energy Center II | Blythe, CA | 633.4 GWh | 6.5 mi |
| Arlington Energy Center III | Blythe, CA | 321.0 GWh | 6.5 mi |
| Blythe Energy Inc | Blythe, CA | 371.8 GWh | 1.8 mi |
| Blythe Solar 110, LLC | Blythe, CA | 580.5 GWh | 4.5 mi |
| Blythe Solar II, LLC | Blythe, CA | 337.2 GWh | 3.9 mi |
| Blythe Solar III, LLC Hybrid | Blythe, CA | 353.7 GWh | 3.7 mi |
| Blythe Solar IV, LLC | Blythe, CA | 339.0 GWh | 5.8 mi |
| Chuckawalla Solar | Blythe, CA | 7.1 GWh | 14.6 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 1.4 GWh | 13.9 mi |
| Desert Quartzite | Blythe, CA | 755.5 GWh | 6.7 mi |
| Genesis Solar Energy Project | Blythe, CA | 623.0 GWh | 18.4 mi |
| Ironwood Solar LLC | Blythe, CA | 7.5 GWh | 14.7 mi |
| McCoy Solar Energy Project Hybrid | Blythe, CA | 646.7 GWh | 5.1 mi |
| Palo Verde College | Blythe, CA | 2.0 GWh | 2.2 mi |
| Solar Blythe 2 | Blythe, CA | 38.1 GWh | 1.8 mi |
| Solar Blythe LLC | Blythe, CA | 41.8 GWh | 5 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 996.0 MWh | 14.6 mi |
| Venable Solar 1 | Blythe, CA | 3.4 GWh | 6.9 mi |
| Venable Solar 2 | Blythe, CA | 3.4 GWh | 6.9 mi |
| Victory Pass | Desert Center, CA | 609.7 GWh | 36.8 mi |