Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Angela Solar Project | Angiola East LLC | Alpaugh, CA | California Independent System Operator (CISO) | 24.2 GWh | - | Jun 2026 | Solar |
| Edwards Sanborn 1C | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 253.8 GWh | Oct 2025 | Jun 2026 | Solar |
| P66 Rodeo Solar | P66 Rodeo Solar | Rodeo, CA | California Independent System Operator (CISO) | 57.5 GWh | Mar 2023 | Jun 2026 | Solar |
| BCE Seal Beach | BCE Seal Beach | Seal Beach, CA | California Independent System Operator (CISO) | 9.8 GWh | Oct 2025 | Jun 2026 | Solar |
| Desert Breeze Solar, LLC | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 69.4 GWh | - | Jun 2026 | Solar |
| Arrowleaf Solar and Storage | ORNI 30 LLC | Brawley, CA | Imperial Irrigation District (IID) | 50.2 GWh | Nov 2025 | Jun 2026 | Solar |
| Luna Valley | Luna Valley Solar I, LLC | Mendota, CA | California Independent System Operator (CISO) | 314.9 GWh | Jul 2025 | Jun 2026 | Solar |
| Rosamond South 1 | Golden Fields Solar IV, LLC | Rosamond, CA | California Independent System Operator (CISO) | 370.3 GWh | Jul 2025 | Jun 2026 | Solar |
| Painted Hills Wind Park | Terra-Gen Operating Co-Wind | Whitewater, CA | California Independent System Operator (CISO) | 162.9 GWh | Oct 1985 | Jun 2026 | Wind |
| Nimbus | U S Bureau of Reclamation | Folsom, CA | Balancing Authority of Northern California (BANC) | 50.6 GWh | Apr 1955 | Jun 2026 | Water |
| Shasta | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 2.0 TWh | May 1944 | Jun 2026 | Water |
| Parker Dam | U S Bureau of Reclamation | Parker, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 362.3 GWh | Nov 1942 | Jun 2026 | Water |
| Spring Creek | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 462.6 GWh | Dec 1963 | Jun 2026 | Water |
| Trinity | U S Bureau of Reclamation | Weaverville, CA | Balancing Authority of Northern California (BANC) | 486.5 GWh | Jan 1964 | Jun 2026 | Water |
| Brea Expansion Plant | Brea Power II | Brea, CA | California Independent System Operator (CISO) | 244.4 GWh | Oct 2012 | Jun 2026 | Landfill Gas |
| Lodi Energy Center | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 413.3 GWh | Oct 2012 | Jun 2026 | Natural Gas |
| Tule Wind LLC | Avangrid Power LLC | Boulevard, CA | California Independent System Operator (CISO) | 348.5 GWh | Nov 2017 | Jun 2026 | Wind |
| Kerckhoff 2 | Pacific Gas & Electric Co. | Auberry, CA | California Independent System Operator (CISO) | 443.6 GWh | Apr 1983 | Jun 2026 | Water |
| El Segundo Energy Center LLC | NRG Energy Services LLC | El Segundo, CA | California Independent System Operator (CISO) | 47.1 GWh | Jun 2013 | Jun 2026 | Natural Gas |
| Diablo Canyon | Pacific Gas & Electric Co. | Avila Beach, CA | California Independent System Operator (CISO) | 18.4 TWh | Apr 1985 | Jun 2026 | Nuclear |
| New Melones | U S Bureau of Reclamation | Jamestown, CA | Balancing Authority of Northern California (BANC) | 410.5 GWh | May 1979 | Jun 2026 | Water |
| Pebbly Beach Generating Station Hybrid | Southern California Edison Co | Avalon, CA | California Independent System Operator (CISO) | 27.7 GWh | Jun 1958 | Jun 2026 | Distillate Fuel Oil : 95.0% Gaseous Propane : 5.0% |
| Stampede | U S Bureau of Reclamation | Truckee, CA | Nevada Power Company (NEVP) | 12.3 GWh | Dec 1987 | Jun 2026 | Water |
| Woodland | Modesto Irrigation District | Modesto, CA | Balancing Authority of Northern California (BANC) | 279.2 GWh | Oct 1993 | Jun 2026 | Natural Gas |
| Redding Power | City of Redding - (CA) | Redding, CA | Balancing Authority of Northern California (BANC) | 160.1 GWh | Dec 1988 | Jun 2026 | Natural Gas |
| Almond Power Plant | Turlock Irrigation District | Modesto, CA | Turlock Irrigation District (TIDC) | 135.3 GWh | Mar 1996 | Jun 2026 | Natural Gas |
| Geothermal 1 | Northern California Power Agny | Middletown, CA | California Independent System Operator (CISO) | 306.0 GWh | Dec 1982 | Jun 2026 | Geothermal |
| Geothermal 2 | Northern California Power Agny | Middletown, CA | California Independent System Operator (CISO) | 324.7 GWh | Nov 1985 | Jun 2026 | Geothermal |
| Solano Wind | Sacramento Municipal Util Dist | Rio Vista, CA | California Independent System Operator (CISO) | 722.0 GWh | May 1994 | Jun 2026 | Wind |
| Carson Power Plant | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 83.0 GWh | Sep 1995 | Jun 2026 | Natural Gas : 97.4% Other Biomass Gas : 2.6% |
| Procter & Gamble Power Plant | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 523.2 GWh | Feb 1997 | Jun 2026 | Natural Gas |
| Campbell Power Plant | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 525.0 GWh | Nov 1997 | Jun 2026 | Natural Gas |
| Pine Flat | Kings River Conservation Dist | Piedra, CA | California Independent System Operator (CISO) | 348.4 GWh | Dec 1983 | Jun 2026 | Water |
| Encina Water Pollution Control | Encina Joint Powers Authority | Carlsbad, CA | California Independent System Operator (CISO) | 14.3 GWh | Oct 2008 | Jun 2026 | Other Biomass Gas : 94.1% Natural Gas : 5.9% |
| Kaweah Delta District Hospital | Kaweah Delta Hospital | Visalia, CA | California Independent System Operator (CISO) | 21.7 GWh | Sep 2008 | Jun 2026 | Natural Gas |
| Childrens Hospital | DTE San Diego COGEN Inc. | San Diego, CA | California Independent System Operator (CISO) | 26.3 GWh | Mar 2000 | Jun 2026 | Natural Gas |
| Loma Linda University Cogen | Loma Linda University | Loma Linda, CA | California Independent System Operator (CISO) | 60.2 GWh | Jan 1980 | Jun 2026 | Natural Gas |
| El Segundo Cogen | Chevron USA Inc-El Segundo | El Segundo, CA | California Independent System Operator (CISO) | 1.2 TWh | Nov 1987 | Jun 2026 | Natural Gas : 99.8% |
| Marathon Bay Area Cogen | Tesoro Marketing & Refining Co. LLC (Martinez) | Martinez, CA | California Independent System Operator (CISO) | 595.9 GWh | Jan 1987 | Jun 2026 | Natural Gas |
| Greenleaf 2 Power Plant | Greenleaf Energy LLC | Yuba City, CA | California Independent System Operator (CISO) | 63.8 GWh | Sep 1989 | Jun 2026 | Natural Gas |
| Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2001 | Jun 2026 | Natural Gas |
| Signal Hill West Unit | Signal Hill Petroleum, Inc | Signal Hill, CA | California Independent System Operator (CISO) | 39.2 GWh | Jun 2004 | Jun 2026 | Other Gas |
| New-Indy Ontario Mill | New-Indy Ontario LLC | Ontario, CA | California Independent System Operator (CISO) | 244.3 GWh | May 1985 | Jun 2026 | Natural Gas |
| Lockhart Solar PV, LLC | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 239.8 GWh | Nov 1989 | Jun 2026 | Solar |
| Puente Hills Energy Recovery | Los Angeles County Sanitation | Whittier, CA | California Independent System Operator (CISO) | 146.1 GWh | Sep 1986 | Jun 2026 | Landfill Gas |
| Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 969.2 GWh | Mar 2013 | Jun 2026 | Solar |
| Kern River Cogeneration | Kern River Cogeneration Co | Bakersfield, CA | California Independent System Operator (CISO) | 101.4 GWh | Jun 1985 | Jun 2026 | Natural Gas |
| San Jose Cogeneration | San Jose State University Fclts Dev &Ops | San Jose, CA | California Independent System Operator (CISO) | 34.9 GWh | Nov 1984 | Jun 2026 | Natural Gas |
| Bear Mountain Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 36.2 GWh | Mar 1995 | Jun 2026 | Natural Gas |
| Argus Cogen Plant | Searles Valley Minerals Operations Inc. | Trona, CA | California Independent System Operator (CISO) | 170.3 GWh | Nov 1947 | Jun 2026 | Bituminous Coal : 77.2% Natural Gas : 22.8% |
| Oxnard Paper Mill | New-Indy, Oxnard LLC | Oxnard, CA | California Independent System Operator (CISO) | 165.5 GWh | Feb 1986 | Jun 2026 | Natural Gas |
| University of California San Diego Hybri | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 232.0 GWh | Jun 2001 | Jun 2026 | Natural Gas |
| CCCSD Wastewater Treatment Plnt | Central Contra Costa Sanitary District | Martinez, CA | California Independent System Operator (CISO) | 20.1 GWh | Nov 1995 | Jun 2026 | Natural Gas |
| E F Oxnard Energy Facility | EF Oxnard, LLC | Oxnard, CA | California Independent System Operator (CISO) | 7.0 GWh | May 1990 | Jun 2026 | Natural Gas |
| Coso Finance Partners | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 360.2 GWh | Jun 1987 | Jun 2026 | Geothermal |
| Coso Power Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 315.6 GWh | Oct 1989 | Jun 2026 | Geothermal |
| Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 36.4 GWh | Mar 2013 | Jun 2026 | Natural Gas |
| Ocotillo Express LLC | Pattern Operators LP | Ocotillo, CA | California Independent System Operator (CISO) | 402.1 GWh | Nov 2012 | Jun 2026 | Wind |
| Chalk Cliff Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 2.6 GWh | Feb 1990 | Jun 2026 | Natural Gas |
| Humboldt Sawmill Company | Mendocino Forest Products | Scotia, CA | California Independent System Operator (CISO) | 117.2 GWh | Dec 1937 | Jun 2026 | Wood/Wood Waste Solids : 99.9% |
| San Diego State University | San Diego State University | San Diego, CA | California Independent System Operator (CISO) | 57.6 GWh | Aug 2002 | Jun 2026 | Natural Gas : 97.4% Solar : 2.6% |
| Calistoga Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 453.3 GWh | Feb 1984 | Jun 2026 | Geothermal |
| US Borax | U S Borax Inc | Boron, CA | California Independent System Operator (CISO) | 256.5 GWh | Jun 1984 | Jun 2026 | Natural Gas |
| Mariposa Energy Project | Diamond Generating Corporation | Byron, CA | California Independent System Operator (CISO) | 22.8 GWh | Sep 2012 | Jun 2026 | Natural Gas |
| Sycamore Cogeneration | Sycamore Cogeneration Co | Bakersfield, CA | California Independent System Operator (CISO) | 143.7 GWh | Nov 1987 | Jun 2026 | Natural Gas |
| Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 123.0 GWh | Apr 2013 | Jun 2026 | Natural Gas |
| John L. Featherstone Plant | Hudson Ranch Power I LLC | Calipatria, CA | Imperial Irrigation District (IID) | 429.9 GWh | Feb 2012 | Jun 2026 | Geothermal |
| Watson Cogeneration | ARCO Products Co-Watson | Carson, CA | California Independent System Operator (CISO) | 2.4 TWh | Nov 1987 | Jun 2026 | Natural Gas : 76.8% Other Gas : 22.9% |
| Oxnard Wastewater Treatment Plant | City of Oxnard - (CA) | Oxnard, CA | California Independent System Operator (CISO) | 2.7 GWh | Jul 1981 | Jun 2026 | Other Biomass Gas : 99.4% Natural Gas : 0.6% |
| Genesis Solar Energy Project | Genesis Solar LLC | Blythe, CA | California Independent System Operator (CISO) | 600.0 GWh | Oct 2013 | Jun 2026 | Solar |
| AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 560.8 GWh | Jul 2014 | Jun 2026 | Solar |
| AltaGas Ripon Energy Inc. | AltaGas Ripon Energy Inc. | Ripon, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 1988 | Jun 2026 | Natural Gas |
| Panoche Valley Solar Farm | RWE Clean Energy | Paicines, CA | California Independent System Operator (CISO) | 235.3 GWh | Dec 2017 | Jun 2026 | Solar |
| Mojave Solar Project | Mojave Solar LLC | Hinkley, CA | California Independent System Operator (CISO) | 595.9 GWh | Nov 2014 | Jun 2026 | Solar |
| Oxnard | Procter&Gamble Paper Products Co-Oxnard | Oxnard, CA | California Independent System Operator (CISO) | 426.0 GWh | Jun 1982 | Jun 2026 | Natural Gas |
| Gas Utilization Facility | City of San Diego - (CA) | San Diego, CA | California Independent System Operator (CISO) | 28.1 GWh | May 1985 | Jun 2026 | Other Biomass Gas |
| Walnut Energy Center | Turlock Irrigation District | Turlock, CA | Turlock Irrigation District (TIDC) | 1.4 TWh | Jan 2006 | Jun 2026 | Natural Gas |
| Roseville Energy Park | City of Roseville - (CA) | Roseville, CA | Balancing Authority of Northern California (BANC) | 329.9 GWh | Oct 2007 | Jun 2026 | Natural Gas |
| Live Oak Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 20.1 GWh | Feb 1992 | Jun 2026 | Natural Gas |
| Saint Agnes Medical Center | Saint Agnes Medical Center | Fresno, CA | California Independent System Operator (CISO) | 32.1 GWh | Apr 2001 | Jun 2026 | Natural Gas |
| Martinez Refining | Martinez Refining Co | Martinez, CA | California Independent System Operator (CISO) | 665.5 GWh | Oct 1995 | Jun 2026 | Natural Gas : 96.5% Other Gas : 3.5% |
| Malaga Power LLC | CalPeak Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 6.3 GWh | Aug 2005 | Jun 2026 | Natural Gas |
| Miramar Energy Facility | San Diego Gas & Electric Co | San Diego, CA | California Independent System Operator (CISO) | 11.8 GWh | May 2005 | Jun 2026 | Natural Gas |
| Sutter Energy Center | Calpine Corp-Sutter | Yuba City, CA | Balancing Authority of Northern California (BANC) | 1.5 TWh | Jun 2001 | Jun 2026 | Natural Gas |
| La Paloma Generating Plant | CXA La Paloma LLC | McKittrick, CA | California Independent System Operator (CISO) | 1.1 TWh | Dec 2002 | Jun 2026 | Natural Gas |
| Sunrise Power LLC | Sunrise Power Co LLC | Fellows, CA | California Independent System Operator (CISO) | 2.1 TWh | May 2001 | Jun 2026 | Natural Gas |
| Los Medanos Energy Center | Los Medanos Energy Center LLC | Pittsburg, CA | California Independent System Operator (CISO) | 2.7 TWh | Jul 2001 | Jun 2026 | Natural Gas |
| Blythe Energy Inc | AltaGas Blythe Operations Inc | Blythe, CA | California Independent System Operator (CISO) | 317.7 GWh | Nov 2003 | Jun 2026 | Natural Gas |
| Delta Energy Center | Delta Energy Center LLC | Pittsburg, CA | California Independent System Operator (CISO) | 3.3 TWh | Apr 2002 | Jun 2026 | Natural Gas |
| Otay Mesa Generating Project | Otay Mesa Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 1.3 TWh | Sep 2009 | Jun 2026 | Natural Gas |
| Metcalf Energy Center | Calpine Corp - Metcalf Energy Center | San Jose, CA | California Independent System Operator (CISO) | 1.9 TWh | May 2005 | Jun 2026 | Natural Gas |
| Elk Hills Power LLC | Elk Hills Power LLC | Tupman, CA | California Independent System Operator (CISO) | 2.7 TWh | Jun 2003 | Jun 2026 | Natural Gas |
| SJ/SC WPCP | San Jose/Santa Clara Water P C | San Jose, CA | California Independent System Operator (CISO) | 67.0 GWh | Jan 1953 | Jun 2026 | Natural Gas : 54.1% Other Biomass Gas : 45.7% |
| Pastoria Energy Facility, LLC | Calpine Corp - Pastoria Energy Center | Lebec, CA | California Independent System Operator (CISO) | 3.1 TWh | Apr 2005 | Jun 2026 | Natural Gas |
| Tracy Combined Cycle Power Plant | MRP San Joaquin Energy LLC. | Tracy, CA | California Independent System Operator (CISO) | 655.2 GWh | Mar 2003 | Jun 2026 | Natural Gas |
| Elk Hills Cogen | California Resources Elk Hills LLC | Tupman, CA | California Independent System Operator (CISO) | 101.8 GWh | Oct 1994 | Jun 2026 | Natural Gas |
| Henrietta Peaker | MRP San Joaquin Energy LLC. | Lemoore, CA | California Independent System Operator (CISO) | 4.3 GWh | May 2002 | Jun 2026 | Natural Gas |
| Cosumnes Power Plant | Sacramento Municipal Util Dist | Herald, CA | Balancing Authority of Northern California (BANC) | 3.1 TWh | Jan 2006 | Jun 2026 | Natural Gas : 99.0% Other Biomass Gas : 1.0% |
| Palomar Energy | San Diego Gas & Electric Co | Escondido, CA | California Independent System Operator (CISO) | 1.2 TWh | Sep 2005 | Jun 2026 | Natural Gas |
| Los Esteros Critical Energy Center | Los Esteros Critical Energy Facility LLC | San Jose, CA | California Independent System Operator (CISO) | 169.1 GWh | Jan 2003 | Jun 2026 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.4 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 80.0 GWh |
| San Mateo County, CA | # 46 | 11 | 131.1 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 253.0 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 296.3 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 440.4 GWh |
| Merced County, CA | # 38 | 33 | 490.0 GWh |
| Trinity County, CA | # 37 | 5 | 499.2 GWh |
| Calaveras County, CA | # 36 | 6 | 503.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 605.0 GWh |
| Ventura County, CA | # 33 | 33 | 687.9 GWh |
| Lake County, CA | # 32 | 10 | 896.4 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.5 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.6 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.0 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 52 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.1 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 6.9 TWh |
| Fresno County, CA | # 8 | 128 | 7.4 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.6 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.4 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Los Angeles County, CA | # 3 | 325 | 16.7 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 333 | 34.3 TWh |