SE Athos II, LLC
25250 Rice Rd, Desert Center, CA 92239Plant Summary Information
SE Athos II, LLC is ranked #23 out of 818 solar farms in California in terms of total annual net electricity generation.
SE Athos II, LLC generated 180.6 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | SE Athos II, LLC |
---|---|
Utility Name | SE Athos II, LLC |
Location | Riverside County, CA |
Initial Operation Date | December 2021 |
Last Update | Jun 2025 |
Annual Generation | 569.4 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #1,189 out of 12,327 Power Plants Nationwide | |
Ranked #58 out of 6,200 Solar Power Plants Nationwide | |
Ranked #70 out of 1,567 California Power Plants | |
Ranked #23 out of 818 California Solar Power Plants | |
Fuel Types | Solar |
Map of SE Athos II, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SE Athos II, LLC.
Monthly Net Generation for SE Athos II, LLC
SE Athos II, LLC Details
Summary Information | |
---|---|
Plant Name | SE Athos II, LLC (64290) |
Plant Address | 25250 Rice Rd, Desert Center, CA 92239 |
Utility | SE Athos II, LLC (63869) |
Latitude, Longitude | 33.75128, -115.35499 |
Generation Dates on File | Dec 2021 to Jun 2025 |
Initial Operation Date | December 2021 |
Annual Generation | 569.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator IPAT2 Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 60 |
DC Net Capacity | 289 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
SE Athos II, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#48 | Oberon Solar Project | Desert Center, CA | 583.3 GWh |
#49 | California Valley Solar Ranch | California Valley, CA | 597.7 GWh |
#50 | Mojave Solar Project | Hinkley, CA | 592.9 GWh |
#51 | Titan Solar Project | Van Horn, TX | 592.9 GWh |
#52 | Bighorn Solar 1 | Pueblo, CO | 592.5 GWh |
#53 | Blythe Solar 110, LLC | Blythe, CA | 571.4 GWh |
#54 | Oxbow Solar 1 | New Roads, LA | 584.4 GWh |
#55 | Red Tailed Hawk Solar LLC | Pierce, TX | 582.3 GWh |
#56 | Double Back Diamond | Virden, IL | 581.1 GWh |
#57 | Hecate Energy Highland LLC | Buford, OH | 571.6 GWh |
#59 | Hopkins Energy LLC | Dike, TX | 567.1 GWh |
#60 | AV Solar Ranch One | Lancaster, CA | 566.4 GWh |
#61 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 544.7 GWh |
#62 | Eiffel Solar Project | Paris, TX | 562.0 GWh |
#63 | Texas Solar Nova 2 | Spur, TX | 561.8 GWh |
#64 | Sun Valley Solar Project | Abbott, TX | 560.2 GWh |
#65 | Dodge Flat | Reno, NV | 552.7 GWh |
#66 | Greasewood II LLC | Girvin, TX | 556.9 GWh |
#67 | Desert Sunlight 250, LLC | Desert Center, CA | 555.7 GWh |
#68 | Daggett 2 | Daggett, CA | 536.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SE Athos II, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 728.1 GWh | 4.1 mi |
Arlington Energy Center II | Blythe, CA | 639.8 GWh | 33.6 mi |
Arlington Energy Center III | Blythe, CA | 319.5 GWh | 33.6 mi |
Athos Solar Project | Desert Center, CA | 709.9 GWh | 0 mi |
Chuckawalla Solar | Blythe, CA | 7.1 GWh | 28.1 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.4 GWh | 29 mi |
Desert Harvest II LLC | Desert Center, CA | 179.8 GWh | 3.7 mi |
Desert Harvest, LLC | Desert Center, CA | 229.6 GWh | 3.7 mi |
Desert Sunlight 250, LLC | Desert Center, CA | 555.7 GWh | 4.4 mi |
Desert Sunlight 300, LLC | Desert Center, CA | 666.9 GWh | 5.4 mi |
Genesis Solar Energy Project | Blythe, CA | 631.8 GWh | 21.4 mi |
Ironwood Solar LLC | Blythe, CA | 7.5 GWh | 28.2 mi |
Maverick Solar 4, LLC | Desert Center, CA | 265.2 GWh | 3.8 mi |
Maverick Solar 6, LLC | Desert Center, CA | 238.0 GWh | 3.8 mi |
Maverick Solar 7, LLC | Desert Center, CA | 326.5 GWh | 3.8 mi |
Maverick Solar, LLC | Desert Center, CA | 372.0 GWh | 3.8 mi |
Oberon II Solar Project | Desert Center, CA | 600.1 GWh | 2.2 mi |
Oberon Solar Project | Desert Center, CA | 583.3 GWh | 2.2 mi |
SunEdison Ironwood State Prison | Blythe, CA | 996.0 MWh | 28.2 mi |
Victory Pass | Desert Center, CA | 600.3 GWh | 4.1 mi |