Baldy Mesa Solar & Storage
TBD, Adelanto, CA 92301Plant Summary Information
Baldy Mesa Solar & Storage is ranked #73 out of 849 solar farms in California in terms of total annual net electricity generation.
Baldy Mesa Solar & Storage generated 101.1 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Baldy Mesa Solar & Storage |
|---|---|
| Utility Name | AES Clean Energy |
| Location | San Bernardino County, CA |
| Initial Operation Date | May 2024 |
| Last Update | Sep 2025 |
| Annual Generation | 275.2 GWh |
| Annual Consumption | 953.1 k MMBtu |
| Ranked #2,067 out of 12,539 Power Plants Nationwide | |
| Ranked #273 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #198 out of 1,600 California Power Plants | |
| Ranked #73 out of 849 California Solar Power Plants | |
| Fuel Types | Solar : 99.9% |
Map of Baldy Mesa Solar & Storage
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Baldy Mesa Solar & Storage.
Monthly Net Generation for Baldy Mesa Solar & Storage
Baldy Mesa Solar & Storage Details
| Summary Information | |
|---|---|
| Plant Name | Baldy Mesa Solar & Storage (66598) |
| Plant Address | TBD, Adelanto, CA 92301 |
| Utility | AES Clean Energy (64904) |
| Latitude, Longitude | 34.60918, -117.45426 |
| Generation Dates on File | Oct 2024 to Sep 2025 |
| Initial Operation Date | May 2024 |
| Annual Generation | 275.2 GWh |
| Fuel Types | Solar : 99.9% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 115.00 kV |
| Energy Storage | Yes |
Generator BDMSS Details Operating May 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 75 MW |
| Summer Capacity | 75 MW |
| Winter Capacity | 75 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 300 |
|---|---|
| Maximum Charge Rate | 75 MW |
| Maximum Discharge Rate | 75 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 49.3 |
| Storage Enclosure Type | CS |
| Frequency Regulation | Yes |
| Ramping Spinning Reserve | Yes |
| System Peak Shaving | P |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | Yes |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 66598 |
| Direct Support Gen Id | BLDMS |
| Support T D Asset | Yes |
Generator BLDMS Details Operating May 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Tilt Angle | 52 |
| DC Net Capacity | 195.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Baldy Mesa Solar & Storage Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #263 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 287.3 GWh |
| #264 | Saint Solar | Coolidge, AZ | 286.9 GWh |
| #265 | Panoche Valley Solar Farm | Paicines, CA | 285.9 GWh |
| #266 | Long Lake Solar, LLC | West Helena, AR | 285.5 GWh |
| #267 | Willowbrook Solar I, LLC | Morystown, OH | 284.8 GWh |
| #268 | North Fork Solar Project | Snyder, OK | 284.7 GWh |
| #269 | Ash Creek Solar | Abbott, TX | 282.7 GWh |
| #270 | Spanish Peaks Solar | Trinidad, CO | 281.5 GWh |
| #271 | Cass County Renewable Energy Center | Beardstown, IL | 281.2 GWh |
| #272 | Nebula Solar | La Feria, TX | 280.7 GWh |
| #274 | Colonial Trail West | Spring Grove, VA | 277.7 GWh |
| #275 | Wood County | Nekoosa, WI | 277.2 GWh |
| #276 | Fairbanks Solar Project | Fairbanks, IN | 277.0 GWh |
| #277 | Boulder Solar Power, LLC | Boulder City, NV | 276.5 GWh |
| #278 | Jackpot Solar, LLC | Twin Falls, ID | 275.5 GWh |
| #279 | Holstein 1 Solar Farm | Wingate, TX | 275.3 GWh |
| #280 | Wilmot Energy Center LLC | Tucson, AZ | 272.4 GWh |
| #281 | Elizabeth Solar Plant | Pitkin, LA | 274.7 GWh |
| #282 | River Fork Solar, LLC | Albion, MI | 274.2 GWh |
| #283 | Honeysuckle Solar Farm | New Carlisle, IN | 273.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Baldy Mesa Solar & Storage.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adelanto Solar II, LLC | Adelanto, CA | 14.4 GWh | 5.7 mi |
| Adelanto Solar, LLC | Adelanto, CA | 53.2 GWh | 5.7 mi |
| Alamo Solar | Oro Grande, CA | 47.7 GWh | 7.9 mi |
| Baldy Mesa 2_Silver Peak Hybrid | Adelanto, CA | 98.2 GWh | 0 mi |
| Coronus Adelanto West 1 | Adelanto, CA | 3.3 GWh | 4.3 mi |
| Coronus Adelanto West 2 | Adelanto, CA | 3.3 GWh | 4.3 mi |
| Expressway Solar A | Victorville, CA | 4.5 GWh | 6.7 mi |
| Expressway Solar B | Victorville, CA | 4.0 GWh | 6.7 mi |
| Expressway Solar C2 | Victorville, CA | 3.3 GWh | 6.6 mi |
| High Desert Power Plant | Victorville, CA | 3.5 TWh | 5.2 mi |
| Hudson - High Desert Hybrid | Victorville, CA | 284.7 GWh | 5 mi |
| Industry Solar Power Generation Station | Adelanto, CA | 4.0 GWh | 3.9 mi |
| RE Victor Phelan Solar One LLC | Adelanto, CA | 44.7 GWh | 6.8 mi |
| Sheep Creek Community Solar Farm | El Mirage, CA | 5.5 GWh | 7.4 mi |
| Victor Dry Farm Ranch A | Victorville, CA | 9.7 GWh | 7.5 mi |
| Victor Dry Farm Ranch B | Victorville, CA | 9.5 GWh | 7.8 mi |
| Victor Mesa Linda B2 | Victorville, CA | 3.5 GWh | 7.7 mi |
| Victor Mesa Linda C2 | Victorville, CA | 3.5 GWh | 7.8 mi |
| Victor Mesa Linda D2 | Victorville, CA | 3.5 GWh | 7.9 mi |
| Victor Mesa Linda E2 | Victorville, CA | 3.5 GWh | 8 mi |