AES Huntington Beach Energy Project
21730 Newland Street, Huntington Beach, CA 92646Plant Summary Information
AES Huntington Beach Energy Project is ranked #15 out of 1,600 power plants in California in terms of total annual net electricity generation.
AES Huntington Beach Energy Project is comprised of 3 generators and generated 682.0 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | AES Huntington Beach Energy Project |
|---|---|
| Utility Name | AES Huntington Beach Energy, LLC |
| Location | Orange County, CA |
| Initial Operation Date | February 2020 |
| Last Update | Sep 2025 |
| Annual Generation | 2.1 TWh |
| Annual Consumption | 16.5 M MMBtu |
| Ranked #497 out of 12,539 Power Plants Nationwide | |
| Ranked #302 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #15 out of 1,600 California Power Plants | |
| Ranked #11 out of 342 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of AES Huntington Beach Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for AES Huntington Beach Energy Project.
Monthly Net Generation for AES Huntington Beach Energy Project
AES Huntington Beach Energy Project Details
| Summary Information | |
|---|---|
| Plant Name | AES Huntington Beach Energy Project (62116) |
| Plant Address | 21730 Newland Street, Huntington Beach, CA 92646 |
| Utility | AES Huntington Beach Energy, LLC (61670) |
| Latitude, Longitude | 33.64562, -117.97937 |
| Generation Dates on File | Feb 2020 to Sep 2025 |
| Initial Operation Date | February 2020 |
| Annual Generation | 2.1 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | N/A - ACC Air cooled condenser |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
| Natural Gas Storage | No |
Generator 1A Details Operating February 2020
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CCT1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | HUNT_CTG 1A |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | HUNT_CTG 1A |
| Nameplate Capacity | 231 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 205 MW |
| Winter Capacity | 227 MW |
| Minimum Load | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 1B Details Operating February 2020
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CCT1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | HUNT CTG 1B |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | HUNT CTG 1B |
| Nameplate Capacity | 231 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 205 MW |
| Winter Capacity | 227 MW |
| Minimum Load | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 1S Details Operating February 2020
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CCT1 |
| Ownership | Jointly Owned |
| Duct Burners | No |
| RTO ISO LMP Node Designation | HUNT STG 1S |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | HUNT STG 1S |
| Nameplate Capacity | 237.2 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 220 MW |
| Winter Capacity | 236 MW |
| Minimum Load | 60 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
AES Huntington Beach Energy Project Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| AES Huntington Beach Energy, LLC | 21730 Newland Street, Huntington Beach, CA 92646 | Generator 1A | 51.00% |
| Ullico Infrastructure Southland Borrower LLC | 8403 Colesville RD, Silver Spring, MD 20910 | Generator 1A | 49.00% |
| AES Huntington Beach Energy, LLC | 21730 Newland Street, Huntington Beach, CA 92646 | Generator 1B | 51.00% |
| Ullico Infrastructure Southland Borrower LLC | 8403 Colesville RD, Silver Spring, MD 20910 | Generator 1B | 49.00% |
| AES Huntington Beach Energy, LLC | 21730 Newland Street, Huntington Beach, CA 92646 | Generator 1S | 51.00% |
| Ullico Infrastructure Southland Borrower LLC | 8403 Colesville RD, Silver Spring, MD 20910 | Generator 1S | 49.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #292 | Sweeny Cogen Facility | Old Ocean, TX | 3.3 TWh |
| #293 | Cedar Bayou 4 | Eldon, TX | 2.3 TWh |
| #294 | Dogwood Energy Facility | Pleasant Hill, MO | 2.2 TWh |
| #295 | Coyote Springs II | Boardman, OR | 2.2 TWh |
| #296 | Colorado Bend Energy Center | Wharton, TX | 2.2 TWh |
| #297 | Rolling Hills Generating | Wilkesville, OH | 2.2 TWh |
| #298 | Greater Des Moines | Pleasant Hill, IA | 2.2 TWh |
| #299 | Bayou Cogen Plant | Pasadena, TX | 2.4 TWh |
| #300 | State Line Combined Cycle | Joplin, MO | 2.2 TWh |
| #301 | Magic Valley Generating Station | Edinburg, TX | 2.2 TWh |
| #303 | Anclote | Holiday, FL | 2.1 TWh |
| #304 | Goldendale Generating Station | Goldendale, WA | 2.1 TWh |
| #305 | Yates | Newnan, GA | 2.1 TWh |
| #306 | Arthur Kill Generating Station | Staten Island, NY | 2.1 TWh |
| #307 | Louisiana 1 | Baton Rouge, LA | 2.9 TWh |
| #308 | Chesterfield | Chester, VA | 2.1 TWh |
| #309 | Sand Hill | Austin, TX | 2.1 TWh |
| #310 | Coyote Springs | Boardman, OR | 2.0 TWh |
| #311 | South Point Energy Center | Mohave Valley, AZ | 2.0 TWh |
| #312 | PSEG Sewaren Generating Station | Sewaren, NJ | 2.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding AES Huntington Beach Energy Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AES Alamitos Energy Center | Long Beach, CA | 1.9 TWh | 10.9 mi |
| AES Alamitos LLC | Long Beach, CA | 38.3 GWh | 11 mi |
| AES Huntington Beach LLC | Huntington Beach, CA | 7.5 GWh | 0.1 mi |
| Anaheim Solar Energy Plant | Anaheim, CA | 2.7 GWh | 11.4 mi |
| AT&T Anaheim | Anaheim, CA | 9.7 GWh | 13.7 mi |
| ATT Kelvin | Irvine, CA | 8.0 GWh | 8.6 mi |
| B Braun Medical | Irvine, CA | 32.9 GWh | 8.8 mi |
| Barre Peaker | Stanton, CA | 12.7 GWh | 11.2 mi |
| BCE Los Alamitos 1 | Los Alamitos, CA | 19.1 GWh | 11.1 mi |
| BCE Los Alamitos 2 | Los Alamitos, CA | 3.4 GWh | 10.4 mi |
| City of Long Beach Airport Lot A & B | Long Beach, CA | 2.8 GWh | 15 mi |
| CSU Long Beach Lots 7 & 14 | Long Beach, CA | 6.9 GWh | 12.1 mi |
| Haynes | Long Beach, CA | 1.6 TWh | 10.7 mi |
| Hoag Hospital Cogen Plant | Newport Beach, CA | 20.6 GWh | 2.9 mi |
| Orange Coast College PH2 Solar Project | Costa Mesa, CA | 4.0 GWh | 4.3 mi |
| Plant No 1 Orange County | Fountain Valley, CA | 40.3 GWh | 4.1 mi |
| Plant No 2 Orange County | Huntington Beach, CA | 59.3 GWh | 1.4 mi |
| Stanton Energy Reliability Center Hybrid | Stanton, CA | 1.7 GWh | 11.1 mi |
| THUMS | Long Beach, CA | 206.9 GWh | 15.9 mi |
| UCI Facilities Management Central Plant | Irvine, CA | 112.6 GWh | 7.6 mi |