Daggett 2
41534 Silver Valley Road, Daggett, CA 92365Plant Summary Information
Daggett 2 is ranked #32 out of 886 solar farms in California in terms of total annual net electricity generation.
Daggett 2 generated 137.5 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Daggett 2 |
|---|---|
| Utility Name | Daggett Solar Power 2 LLC |
| Location | San Bernardino County, CA |
| Initial Operation Date | December 2023 |
| Last Update | Jun 2026 |
| Annual Generation | 493.8 GWh |
| Annual Consumption | 1.9 M MMBtu |
| Ranked #1,376 out of 13,094 Power Plants Nationwide | |
| Ranked #120 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #81 out of 1,607 California Power Plants | |
| Ranked #32 out of 886 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Daggett 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Daggett 2.
Monthly Net Generation for Daggett 2
Monthly Plant Fuel Consumption for Daggett 2
Daggett 2 Details
| Summary Information | |
|---|---|
| Plant Name | Daggett 2 (64851) |
| Plant Address | 41534 Silver Valley Road, Daggett, CA 92365 |
| Utility | Daggett Solar Power 2 LLC (64364) |
| Latitude, Longitude | 34.86092, -116.85528 |
| Generation Dates on File | Dec 2023 to Jun 2026 |
| Initial Operation Date | December 2023 |
| Annual Generation | 493.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator DAGGB Details Operating December 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 131 MW |
| Summer Capacity | 131 MW |
| Winter Capacity | 131 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 4.6 |
|---|---|
| Maximum Charge Rate | 2.3 MW |
| Maximum Discharge Rate | 2.3 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 2.3 |
| Storage Enclosure Type | CS |
| Excess Wind And Solar Generation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 64851 / 64851 |
| Direct Support Gen Id | DAGGP |
| Support T D Asset | Yes |
Generator DAGGP Details Operating December 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 182 MW |
| Summer Capacity | 182 MW |
| Winter Capacity | 182 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 240 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Daggett 2 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #110 | Escalante (NM) | Grants, NM | 515.6 GWh |
| #111 | Agua Caliente Solar Project | Dateland, AZ | 514.5 GWh |
| #112 | Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 509.9 GWh |
| #113 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 498.6 GWh |
| #114 | Maple Flats | Louisville, IL | 513.6 GWh |
| #115 | Taygete Energy Project LLC | Coyanosa, TX | 512.8 GWh |
| #116 | Yellowbud Solar, LLC | Williamsport, OH | 511.6 GWh |
| #117 | 7V Solar Ranch | Muldoon, TX | 509.5 GWh |
| #118 | Sparta Solar | Pawnee, TX | 508.5 GWh |
| #119 | Phoebe Solar | Kermit, TX | 507.5 GWh |
| #121 | Matrix Pleasant Valley | Boise, ID | 498.4 GWh |
| #122 | Fighting Jays Solar Project | Needville, TX | 498.3 GWh |
| #123 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 495.3 GWh |
| #124 | RE Tranquillity | Cantua Creek, CA | 484.8 GWh |
| #125 | Long Lake Solar, LLC | West Helena, AR | 493.9 GWh |
| #126 | Porter Solar, LLC (TX) | Krum, TX | 493.8 GWh |
| #127 | ANSON Solar Center, LLC | Anson, TX | 493.6 GWh |
| #128 | Delilah Solar Energy LLC | Bogota, TX | 493.6 GWh |
| #129 | Bernard Creek Solar | Hungerford, TX | 492.5 GWh |
| #130 | Azure Sky Solar | Haskell, TX | 484.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Daggett 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo Solar | Oro Grande, CA | 49.3 GWh | 30.5 mi |
| Daggett 3 | Daggett, CA | 834.1 GWh | 0 mi |
| Desert Breeze Solar, LLC | Hinkley, CA | 69.4 GWh | 30.4 mi |
| Foundation Cemex BMQ | Apple Valley, CA | 3.9 GWh | 22 mi |
| Lockhart Solar PV II | Hinkley, CA | 207.2 GWh | 30.7 mi |
| Lockhart Solar PV IV, LLC | Hinkley, CA | 18.7 GWh | 29.8 mi |
| Lockhart Solar PV, LLC | Hinkley, CA | 239.8 GWh | 30.7 mi |
| Lone Valley Solar Park II LLC | Lucerne Valley, CA | 53.1 GWh | 31.3 mi |
| Longboat Solar, LLC | Barstow, CA | 54.3 GWh | 25 mi |
| Madelyn Solar, LLC | Silver Lake, CA | 2.3 GWh | 27.3 mi |
| Mitchell Solar, LLC | Silver Lake, CA | 4.4 GWh | 27.4 mi |
| Mojave Solar Project | Hinkley, CA | 595.9 GWh | 29.5 mi |
| Navajo Solar Power Generation Station 1 | Apple Valley, CA | 4.3 GWh | 28.7 mi |
| Nunn | Apple Valley, CA | 1.4 GWh | 29.7 mi |
| Otoe Solar Power Generation Station 1 LL | Apple Valley, CA | 3.5 GWh | 29 mi |
| Powhatan Solar Power Generation Station | Apple Valley, CA | 3.6 GWh | 30.1 mi |
| Rudy Solar, LLC | Silver Lake, CA | 3.1 GWh | 27.4 mi |
| SunEdison Walmart Apple Valley DC | Apple Valley, CA | 715.0 MWh | 26.7 mi |
| Sunray 2 | Daggett, CA | 54.6 GWh | 1.6 mi |
| Sunray 3 | Daggett, CA | 37.2 GWh | 1.6 mi |