Baldy Mesa 2_Silver Peak Hybrid
19252 Muskrat Ave, Adelanto, CA 92301Plant Summary Information
Baldy Mesa 2_Silver Peak Hybrid is ranked #200 out of 818 solar farms in California in terms of total annual net electricity generation.
Baldy Mesa 2_Silver Peak Hybrid generated 34.5 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Baldy Mesa 2_Silver Peak Hybrid |
---|---|
Utility Name | AES Clean Energy |
Location | San Bernardino County, CA |
Initial Operation Date | December 2024 |
Last Update | May 2025 |
Annual Generation | 34.7 GWh |
Annual Consumption | 141.3 k MMBtu |
Ranked #4,491 out of 12,312 Power Plants Nationwide | |
Ranked #1,018 out of 6,191 Solar Power Plants Nationwide | |
Ranked #578 out of 1,568 California Power Plants | |
Ranked #200 out of 818 California Solar Power Plants | |
Fuel Types | Solar |
Map of Baldy Mesa 2_Silver Peak Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Baldy Mesa 2_Silver Peak Hybrid.
Monthly Net Generation for Baldy Mesa 2_Silver Peak Hybrid
Baldy Mesa 2_Silver Peak Hybrid Details
Summary Information | |
---|---|
Plant Name | Baldy Mesa 2_Silver Peak Hybrid (66885) |
Plant Address | 19252 Muskrat Ave, Adelanto, CA 92301 |
Utility | AES Clean Energy (64904) |
Latitude, Longitude | 34.60914, -117.45366 |
Generation Dates on File | Jan 2025 to May 2025 |
Initial Operation Date | December 2024 |
Annual Generation | 34.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 115.00 kV |
Energy Storage | Yes |
Generator SPKBS Details Operating December 2024
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ROADWAY_1_N001 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ROADWAY_1_N001 |
Nameplate Capacity | 25 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 25 MW |
---|---|
Winter Capacity | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 100 |
---|---|
Maximum Charge Rate | 25 MW |
Maximum Discharge Rate | 25 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 16.4 |
Storage Enclosure Type | CS |
Frequency Regulation | Yes |
Ramping Spinning Reserve | Yes |
System Peak Shaving | P |
Voltage Or Reactive Power Support | Yes |
Excess Wind And Solar Generation | Yes |
DC Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 66885 |
Direct Support Gen Id | SPKPV |
Support T D Asset | Yes |
Generator SPKPV Details Operating December 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ROADWAY_1_N001 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ROADWAY_1_N001 |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 50 MW |
---|---|
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 52 |
DC Net Capacity | 64.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Baldy Mesa 2_Silver Peak Hybrid Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1008 | Adams Nielson Solar | Lind, WA | 42.8 GWh |
#1009 | Paulsell | Crows Landing, CA | 40.2 GWh |
#1010 | Energix Leatherwood, LLC | Axton, VA | 42.3 GWh |
#1011 | Decatur County Solar Project | Bainbridge, GA | 42.2 GWh |
#1012 | Old Midville Solar | Millen, GA | 42.1 GWh |
#1013 | Wildwood Solar I, LLC | Wasco, CA | 41.9 GWh |
#1014 | Solar Blythe LLC | Blythe, CA | 41.8 GWh |
#1015 | Briel Solar Farm | Standston, VA | 41.8 GWh |
#1016 | Midway Solar Farm II | Calipatria, CA | 41.7 GWh |
#1017 | Cameron Solar | Cameron, SC | 41.5 GWh |
#1019 | Bayshore Solar C, LLC | Lancaster, CA | 41.3 GWh |
#1020 | Richland Solar Center | Jeffersonville, GA | 41.3 GWh |
#1021 | Harquahala Sun Solar Project | Tonopah, AZ | 41.2 GWh |
#1022 | Algonquin SKIC20 Solar LLC | Taft, CA | 41.1 GWh |
#1023 | Longboat Solar, LLC | Barstow, CA | 41.1 GWh |
#1024 | Winterberry Solar | Gloucester, VA | 41.1 GWh |
#1025 | Salt Creek Township Solar, LLC | Mason City, IL | 41.1 GWh |
#1026 | Bingham Solar, LLC | St. Johns, MI | 41.0 GWh |
#1027 | Queen Creek Solar Farm | Queen Creek, AZ | 40.7 GWh |
#1028 | Ruff Solar LLC | Ellenboro, NC | 40.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Baldy Mesa 2_Silver Peak Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adelanto Solar II, LLC | Adelanto, CA | 14.4 GWh | 5.6 mi |
Adelanto Solar, LLC | Adelanto, CA | 53.2 GWh | 5.6 mi |
Alamo Solar | Oro Grande, CA | 47.7 GWh | 7.9 mi |
Baldy Mesa Solar & Storage | Adelanto, CA | 138.2 GWh | 0 mi |
Coronus Adelanto West 1 | Adelanto, CA | 3.3 GWh | 4.3 mi |
Coronus Adelanto West 2 | Adelanto, CA | 3.3 GWh | 4.3 mi |
Expressway Solar A | Victorville, CA | 4.5 GWh | 6.6 mi |
Expressway Solar B | Victorville, CA | 4.0 GWh | 6.7 mi |
Expressway Solar C2 | Victorville, CA | 3.3 GWh | 6.6 mi |
High Desert Power Plant | Victorville, CA | 3.7 TWh | 5.1 mi |
Hudson - High Desert Hybrid | Victorville, CA | 280.8 GWh | 5 mi |
Industry Solar Power Generation Station | Adelanto, CA | 4.0 GWh | 3.9 mi |
RE Victor Phelan Solar One LLC | Adelanto, CA | 44.7 GWh | 6.8 mi |
Sheep Creek Community Solar Farm | El Mirage, CA | 5.5 GWh | 7.4 mi |
Victor Dry Farm Ranch A | Victorville, CA | 9.7 GWh | 7.5 mi |
Victor Dry Farm Ranch B | Victorville, CA | 9.5 GWh | 7.8 mi |
Victor Mesa Linda B2 | Victorville, CA | 3.5 GWh | 7.7 mi |
Victor Mesa Linda C2 | Victorville, CA | 3.5 GWh | 7.7 mi |
Victor Mesa Linda D2 | Victorville, CA | 3.5 GWh | 7.9 mi |
Victor Mesa Linda E2 | Victorville, CA | 3.5 GWh | 7.9 mi |