Chevron - Lost Hills Hybrid
Lost Hills Rd, Lost Hills, CA 93249Plant Summary Information
Chevron - Lost Hills Hybrid is ranked #139 out of 851 solar farms in California in terms of total annual net electricity generation.
Chevron - Lost Hills Hybrid generated 12.9 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Chevron - Lost Hills Hybrid |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Kern County, CA |
| Initial Operation Date | April 2020 |
| Last Update | Nov 2025 |
| Annual Generation | 67.2 GWh |
| Annual Consumption | 240.2 k MMBtu |
| Ranked #3,806 out of 12,574 Power Plants Nationwide | |
| Ranked #924 out of 6,426 Solar Power Plants Nationwide | |
| Ranked #413 out of 1,603 California Power Plants | |
| Ranked #139 out of 851 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
GSRP (2019 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2024) |
Map of Chevron - Lost Hills Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chevron - Lost Hills Hybrid.
Monthly Net Generation for Chevron - Lost Hills Hybrid
Chevron - Lost Hills Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Chevron - Lost Hills Hybrid (63545) |
| Plant Address | Lost Hills Rd, Lost Hills, CA 93249 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 35.62, -119.69 |
| Generation Dates on File | Apr 2020 to Nov 2025 |
| Initial Operation Date | April 2020 |
| Annual Generation | 67.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 20-599 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 70.00 kV |
| Energy Storage | No |
Generator GEN1 Details Operating April 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 30 MW |
| Summer Capacity | 30 MW |
| Winter Capacity | 30 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 61.5 |
| DC Net Capacity | 34 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Chevron - Lost Hills Hybrid Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #914 | FL Solar 4, LLC | Tallahassee, FL | 70.2 GWh |
| #915 | Central 40 | Newman, CA | 69.9 GWh |
| #916 | San Isabel Solar, LLC | Trinidad, CO | 69.9 GWh |
| #917 | SR Bell Buckle | Shelbyville, TN | 69.1 GWh |
| #918 | Lake Placid Solar Power Plant | Lake Placid, FL | 68.3 GWh |
| #919 | Robin Hollow Solar | West Greenwich, RI | 68.0 GWh |
| #920 | Bakeoven Solar | Maupin, OR | 67.8 GWh |
| #921 | Dry Bridge Solar (Brown University) | North Kingstown, RI | 67.7 GWh |
| #922 | Sherco Solar II | Becker, MN | 67.5 GWh |
| #923 | Bluebell Solar | Sterling City, TX | 67.3 GWh |
| #925 | Waiawa Solar Power Hybrid | Waipahu, HI | 60.7 GWh |
| #926 | Garnet Mesa Solar | Delta, CO | 66.5 GWh |
| #927 | Bonnie Mine Solar | Bartow, FL | 66.3 GWh |
| #928 | Jones Farm Solar | Millington, MD | 66.0 GWh |
| #929 | San Luis Valley Solar Ranch | Mosca, CO | 65.9 GWh |
| #930 | Altona Solar, LLC | Centralia, MO | 64.9 GWh |
| #931 | Little Bear Solar 1, LLC | Mendota, CA | 64.8 GWh |
| #932 | Hazlehurst II | Hazlehurst, GA | 64.7 GWh |
| #933 | Avalon Solar | Pima, AZ | 64.6 GWh |
| #934 | Hayhurst Texas Solar | Orla, TX | 64.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chevron - Lost Hills Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Berrenda Mesa Water District | Lost Hills, CA | 16.5 GWh | 9.9 mi |
| Blackwell Solar Park | Lost Hills, CA | 31.3 GWh | 8.7 mi |
| Coronal Lost Hills | Lost Hills, CA | 37.4 GWh | 14.2 mi |
| Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 31.5 GWh | 6.4 mi |
| Elk Hills Cogen | Tupman, CA | 14.5 GWh | 10.1 mi |
| Lost Hills Cogeneration Plant | Lost Hills, CA | 9.2 GWh | 5.4 mi |
| Lost Hills Oilfield | Lost Hills, CA | 4.5 GWh | 9.2 mi |
| Lost Hills/Blackwell | Lost Hills, CA | 80.6 GWh | 9 mi |
| Morelos del Sol | Lost Hills, CA | 29.9 GWh | 10.6 mi |
| Nickel 1 Solar Facility | Lost Hills, CA | 2.3 GWh | 2.4 mi |
| Rio Bravo Solar 1 LLC | McKittrick, CA | 52.3 GWh | 14.1 mi |
| Rio Bravo Solar II LLC | McKittrick, CA | 50.8 GWh | 14.1 mi |
| Roll Lost Hills | Lost Hills, CA | 5.5 GWh | 11.4 mi |
| South Belridge Cogeneration Facility | McKittrick, CA | 468.9 GWh | 12.6 mi |
| Wildwood Solar I, LLC | Wasco, CA | 41.9 GWh | 6.3 mi |
| Wildwood Solar II | Wasco, CA | 38.5 GWh | 6.6 mi |
| Wonderful Huller & Shelling | Lost Hills, CA | 3.5 GWh | 6.3 mi |
| Wonderful Lost Hills | Lost Hills, CA | 48.2 GWh | 11 mi |
| Wonderful Orchards - Belridge | Lost Hills, CA | 11.9 GWh | 8.9 mi |
| Wonderful Orchards - Westside | Lost Hills, CA | 12.7 GWh | 8.4 mi |