Antelope Expansion 2
9611 West Avenue G, Lancaster, CA 93536Plant Summary Information
Antelope Expansion 2 is ranked #74 out of 849 solar farms in California in terms of total annual net electricity generation.
Antelope Expansion 2 generated 82.5 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Antelope Expansion 2 |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Los Angeles County, CA |
| Initial Operation Date | December 2018 |
| Last Update | Sep 2025 |
| Annual Generation | 270.9 GWh |
| Annual Consumption | 999.3 k MMBtu |
| Ranked #2,091 out of 12,539 Power Plants Nationwide | |
| Ranked #285 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #200 out of 1,600 California Power Plants | |
| Ranked #74 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Antelope Expansion 2, LLC (2016 to 2017) Sustainable Power Group, LLC (2018 to 2020) AES Distributed Energy (2021 to 2024) |
Map of Antelope Expansion 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Antelope Expansion 2.
Monthly Net Generation for Antelope Expansion 2
Antelope Expansion 2 Details
| Summary Information | |
|---|---|
| Plant Name | Antelope Expansion 2 (61264) |
| Plant Address | 9611 West Avenue G, Lancaster, CA 93536 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 34.74498, -118.30915 |
| Generation Dates on File | Dec 2018 to Sep 2025 |
| Initial Operation Date | December 2018 |
| Annual Generation | 270.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | No |
Generator ANTX2 Details Operating December 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 105 MW |
| Summer Capacity | 105 MW |
| Winter Capacity | 105 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 130 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Antelope Expansion 2 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #275 | Wood County | Nekoosa, WI | 277.2 GWh |
| #276 | Fairbanks Solar Project | Fairbanks, IN | 277.0 GWh |
| #277 | Boulder Solar Power, LLC | Boulder City, NV | 276.5 GWh |
| #278 | Jackpot Solar, LLC | Twin Falls, ID | 275.5 GWh |
| #279 | Holstein 1 Solar Farm | Wingate, TX | 275.3 GWh |
| #280 | Wilmot Energy Center LLC | Tucson, AZ | 272.4 GWh |
| #281 | Elizabeth Solar Plant | Pitkin, LA | 274.7 GWh |
| #282 | River Fork Solar, LLC | Albion, MI | 274.2 GWh |
| #283 | Honeysuckle Solar Farm | New Carlisle, IN | 273.7 GWh |
| #284 | Central Line Solar, LLC | Coolidge, AZ | 271.0 GWh |
| #286 | Dougherty County Solar, LLC | Albany, GA | 269.7 GWh |
| #287 | East Blackland Solar Project 1 | Manor, TX | 269.3 GWh |
| #288 | Sunshine Valley Solar | Armagosa, NV | 266.9 GWh |
| #289 | Resurgence Solar | Boron, CA | 253.0 GWh |
| #290 | Hunter Solar LLC (UT) | Clawson, UT | 265.5 GWh |
| #291 | Wild Springs | New Underwood, SD | 264.9 GWh |
| #292 | Maverick Solar 4, LLC | Desert Center, CA | 264.8 GWh |
| #293 | Darien Solar | Darien, WI | 264.7 GWh |
| #294 | Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh |
| #295 | CA Flats Solar 130, LLC | Shandon, CA | 262.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Antelope Expansion 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope DSR 3 | Lancaster, CA | 57.7 GWh | 0.6 mi |
| Antelope Expansion 3A | Lancaster, CA | 31.7 GWh | 1.3 mi |
| Antelope Expansion 3B | Lancaster, CA | 11.0 GWh | 1.9 mi |
| Central Antelope Dry Ranch B LLC | Lancaster, CA | 6.7 GWh | 2.8 mi |
| Central Antelope Dry Ranch C | Lancaster, CA | 33.3 GWh | 1.8 mi |
| Elevation Solar C | Lancaster, CA | 103.2 GWh | 1.1 mi |
| Lancaster Dry Farm Ranch B | Lancaster, CA | 7.8 GWh | 2.2 mi |
| North Lancaster Ranch | Lancaster, CA | 37.2 GWh | 1.8 mi |
| Portal Ridge Solar B, LLC | Lancaster, CA | 46.9 GWh | 2.5 mi |
| Rodeo Solar C2 | Lancaster, CA | 2.9 GWh | 2.5 mi |
| Rodeo Solar D2 | Lancaster, CA | 2.6 GWh | 2.5 mi |
| San Pablo Raceway | Lancaster, CA | 231.0 GWh | 2.2 mi |
| Summer North Solar | Lancaster, CA | 10.0 GWh | 1.9 mi |
| Summer Solar A2 | Lancaster, CA | 3.2 GWh | 1.9 mi |
| Summer Solar B2 | Lancaster, CA | 3.0 GWh | 1.9 mi |
| Summer Solar C2 | Lancaster, CA | 2.5 GWh | 1.9 mi |
| Summer Solar D2 | Lancaster, CA | 1.8 GWh | 1.9 mi |
| Summer Solar LLC | Lancaster, CA | 49.1 GWh | 2.1 mi |
| TA-High Desert LLC | Lancaster, CA | 56.8 GWh | 2.5 mi |
| Western Antelope Blue Sky B | Lancaster, CA | 50.2 GWh | 0.9 mi |