Maverick Solar 4, LLC
29722 Corn Springs Road, Desert Center, CA 92239Plant Summary Information
Maverick Solar 4, LLC is ranked #75 out of 851 solar farms in California in terms of total annual net electricity generation.
Maverick Solar 4, LLC generated 65.3 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Maverick Solar 4, LLC |
|---|---|
| Utility Name | Maverick Solar 4, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | December 2020 |
| Last Update | Nov 2025 |
| Annual Generation | 266.2 GWh |
| Annual Consumption | 967.9 k MMBtu |
| Ranked #2,125 out of 12,574 Power Plants Nationwide | |
| Ranked #308 out of 6,426 Solar Power Plants Nationwide | |
| Ranked #202 out of 1,603 California Power Plants | |
| Ranked #75 out of 851 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Maverick Solar 4, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Maverick Solar 4, LLC.
Monthly Net Generation for Maverick Solar 4, LLC
Maverick Solar 4, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Maverick Solar 4, LLC (64104) |
| Plant Address | 29722 Corn Springs Road, Desert Center, CA 92239 |
| Utility | Maverick Solar 4, LLC (63732) |
| Latitude, Longitude | 33.7, -115.38 |
| Generation Dates on File | Nov 2020 to Nov 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 266.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator MAV02 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 135.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Maverick Solar 4, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #298 | Honeysuckle Solar Farm | New Carlisle, IN | 273.0 GWh |
| #299 | Clearview Solar 1 | Quincy, OH | 272.9 GWh |
| #300 | Wilmot Energy Center LLC | Tucson, AZ | 269.0 GWh |
| #301 | Starr Solar Ranch | Roma, TX | 271.1 GWh |
| #302 | Unbridled Solar | Robards, KY | 270.0 GWh |
| #303 | Dougherty County Solar, LLC | Albany, GA | 270.0 GWh |
| #304 | Central Line Solar, LLC | Coolidge, AZ | 269.6 GWh |
| #305 | Pleasant Creek Unit 2 | Palo, IA | 268.6 GWh |
| #306 | Daybreak Solar | Maupin, OR | 267.3 GWh |
| #307 | Maverick Solar 6, LLC | Desert Center, CA | 258.0 GWh |
| #309 | Resurgence Solar | Boron, CA | 253.1 GWh |
| #310 | Wild Springs | New Underwood, SD | 265.0 GWh |
| #311 | Elara Solar | Pearsall, TX | 264.9 GWh |
| #312 | Antelope Expansion 2 | Lancaster, CA | 264.8 GWh |
| #313 | Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh |
| #314 | Sunshine Valley Solar | Armagosa, NV | 264.1 GWh |
| #315 | Blue Bird Solar, LLC | Warrenton, MO | 263.3 GWh |
| #316 | Hunter Solar LLC (UT) | Clawson, UT | 262.6 GWh |
| #317 | Catalina Solar LLC | Rosamond, CA | 262.2 GWh |
| #318 | CA Flats Solar 130, LLC | Shandon, CA | 261.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Maverick Solar 4, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arica Solar | Desert Center, CA | 774.8 GWh | 3.7 mi |
| Athos Solar Project | Desert Center, CA | 702.2 GWh | 3.8 mi |
| Chuckawalla Solar | Blythe, CA | 7.1 GWh | 28.1 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 1.4 GWh | 28.9 mi |
| Desert Harvest II LLC | Desert Center, CA | 181.8 GWh | 6.9 mi |
| Desert Harvest, LLC | Desert Center, CA | 232.6 GWh | 6.9 mi |
| Desert Sunlight 250, LLC | Desert Center, CA | 555.7 GWh | 7.3 mi |
| Desert Sunlight 300, LLC | Desert Center, CA | 666.9 GWh | 8.5 mi |
| Genesis Solar Energy Project | Blythe, CA | 619.7 GWh | 22.1 mi |
| Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 46.2 GWh | 31.7 mi |
| Ironwood Solar LLC | Blythe, CA | 7.5 GWh | 28.2 mi |
| Maverick Solar 6, LLC | Desert Center, CA | 258.0 GWh | 0 mi |
| Maverick Solar 7, LLC | Desert Center, CA | 349.9 GWh | 0 mi |
| Maverick Solar, LLC | Desert Center, CA | 371.4 GWh | 0 mi |
| Oberon II Solar Project | Desert Center, CA | 594.6 GWh | 2 mi |
| Oberon Solar Project | Desert Center, CA | 586.6 GWh | 2 mi |
| SE Athos II, LLC | Desert Center, CA | 565.0 GWh | 3.8 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 996.0 MWh | 28.1 mi |
| Victory Pass | Desert Center, CA | 575.4 GWh | 3.7 mi |
| Wister Solar | Niland, CA | 28.2 GWh | 30.6 mi |