San Pablo Raceway
TBD, Lancaster, CA 93535Plant Summary Information
San Pablo Raceway is ranked #100 out of 917 solar farms in California in terms of total annual net electricity generation.
San Pablo Raceway generated 65.7 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | San Pablo Raceway |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Los Angeles County, CA |
| Initial Operation Date | August 2019 |
| Last Update | Aug 2026 |
| Annual Generation | 192.5 GWh |
| Annual Consumption | 747.3 k MMBtu |
| Ranked #2,644 out of 13,301 Power Plants Nationwide | |
| Ranked #529 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #265 out of 1,641 California Power Plants | |
| Ranked #100 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
San Pablo Raceway, LLC (2018 to 2018) Sustainable Power Group, LLC (2019 to 2020) AES Distributed Energy (2021 to 2025) |
Map of San Pablo Raceway
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for San Pablo Raceway.
Monthly Net Generation for San Pablo Raceway
Monthly Plant Fuel Consumption for San Pablo Raceway
San Pablo Raceway Details
| Summary Information | |
|---|---|
| Plant Name | San Pablo Raceway (62004) |
| Plant Address | TBD, Lancaster, CA 93535 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 34.72375, -118.28035 |
| Generation Dates on File | Aug 2019 to Aug 2026 |
| Initial Operation Date | August 2019 |
| Annual Generation | 192.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | No |
Generator SPRWY Details Operating August 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| DC Net Capacity | 132 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
San Pablo Raceway Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #519 | Cereal City Solar, LLC | Battle Creek, MI | 197.8 GWh |
| #520 | Spring Grove I | Spring Grove, VA | 197.8 GWh |
| #521 | Kelso 2 Solar | Benton, MO | 197.3 GWh |
| #522 | Point Beach Solar | Two Creeks, WI | 197.3 GWh |
| #523 | Desert Harvest II LLC | Desert Center, CA | 192.7 GWh |
| #524 | Crossett Solar | Crossett, AR | 196.4 GWh |
| #525 | Clover Creek Solar Community Solar | Mona, UT | 195.2 GWh |
| #526 | Solverde 1 | Lancaster, CA | 195.0 GWh |
| #527 | Barrett Solar Project | Point, TX | 193.3 GWh |
| #528 | Second Division Solar | West Columbia, TX | 193.2 GWh |
| #530 | Horseshoe Solar, LLC | Tooele, UT | 192.1 GWh |
| #531 | Blackwater Solar | Bickley, GA | 191.5 GWh |
| #532 | Gilchrist County Solar | Newberry, FL | 191.3 GWh |
| #533 | Wautoma Solar | Wautoma, WI | 191.0 GWh |
| #534 | Arche Energy Project, LLC | Fayette, OH | 190.3 GWh |
| #535 | Mule Creek Renewable Energy Center | Panama City, FL | 190.3 GWh |
| #536 | Wildwood Solar Plant | Tutwiler, MS | 190.1 GWh |
| #537 | Three Creeks | Parrish, FL | 190.1 GWh |
| #538 | RE Astoria 2 | Rosamond, CA | 189.7 GWh |
| #539 | OETN1 | Obion, TN | 189.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding San Pablo Raceway.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope DSR 3 | Lancaster, CA | 55.1 GWh | 1.6 mi |
| Antelope Expansion 1B | Lancaster, CA | 46.6 GWh | 1.3 mi |
| Central Antelope Dry Ranch B LLC | Lancaster, CA | 6.0 GWh | 1.7 mi |
| Central Antelope Dry Ranch C | Lancaster, CA | 38.9 GWh | 1.2 mi |
| Elevation Solar C | Lancaster, CA | 105.0 GWh | 1.4 mi |
| Horn | Lancaster, CA | 3.7 GWh | 1.1 mi |
| Lancaster Dry Farm Ranch B | Lancaster, CA | 10.0 GWh | 0.7 mi |
| North Lancaster Ranch | Lancaster, CA | 38.6 GWh | 1.9 mi |
| Portal Ridge Solar B, LLC | Lancaster, CA | 52.7 GWh | 0.5 mi |
| Portal Ridge Solar C, LLC | Lancaster, CA | 28.6 GWh | 0.8 mi |
| Rodeo Solar C2 | Lancaster, CA | 3.6 GWh | 0.9 mi |
| Rodeo Solar D2 | Lancaster, CA | 3.5 GWh | 0.9 mi |
| Summer North Solar | Lancaster, CA | 13.1 GWh | 0.5 mi |
| Summer Solar A2 | Lancaster, CA | 2.7 GWh | 0.5 mi |
| Summer Solar B2 | Lancaster, CA | 3.1 GWh | 0.5 mi |
| Summer Solar C2 | Lancaster, CA | 3.3 GWh | 0.5 mi |
| Summer Solar D2 | Lancaster, CA | 2.0 GWh | 0.5 mi |
| Summer Solar LLC | Lancaster, CA | 55.9 GWh | 1.9 mi |
| TA-High Desert LLC | Lancaster, CA | 57.9 GWh | 1.7 mi |
| Western Antelope Blue Sky B | Lancaster, CA | 52.2 GWh | 2 mi |