Mount Signal Solar Farm II
304 Brockman Rd, Calexico, CA 92231Plant Summary Information
Mount Signal Solar Farm II is ranked #36 out of 818 solar farms in California in terms of total annual net electricity generation.
Mount Signal Solar Farm II generated 125.1 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Mount Signal Solar Farm II |
---|---|
Utility Name | MN8 Energy LLC |
Location | Imperial County, CA |
Initial Operation Date | January 2020 |
Last Update | May 2025 |
Annual Generation | 407.0 GWh |
Annual Consumption | 1.6 M MMBtu |
Ranked #1,513 out of 12,312 Power Plants Nationwide | |
Ranked #119 out of 6,191 Solar Power Plants Nationwide | |
Ranked #102 out of 1,568 California Power Plants | |
Ranked #36 out of 818 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Imperial Valley Solar 2, LLC (2016 to 2021) MN8 Energy LLC (2022 to 2024) |
Map of Mount Signal Solar Farm II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mount Signal Solar Farm II.
Monthly Net Generation for Mount Signal Solar Farm II
Mount Signal Solar Farm II Details
Summary Information | |
---|---|
Plant Name | Mount Signal Solar Farm II (61353) |
Plant Address | 304 Brockman Rd, Calexico, CA 92231 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 32.6685, -115.6292 |
Generation Dates on File | Oct 2019 to May 2025 |
Initial Operation Date | January 2020 |
Annual Generation | 407.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator IVS2 Details Operating January 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 153.5 MW |
Summer Capacity | 153.5 MW |
Winter Capacity | 153.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 199.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Mount Signal Solar Farm II Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#109 | Muscle Shoals | Cherokee, AL | 425.4 GWh |
#110 | Twiggs Solar | Dry Branch, GA | 420.3 GWh |
#111 | Desert Quartzite | Blythe, CA | 408.3 GWh |
#112 | Brazoria West | Damon, TX | 417.0 GWh |
#113 | Atrisco Solar LLC | Rio Rancho, NM | 414.3 GWh |
#114 | Crane Solar Project | Crane, TX | 414.0 GWh |
#115 | Big Cypress Solar, LLC | Crawfordsville, AR | 413.4 GWh |
#116 | Brazoria County Solar Project (Danciger) | Damon, TX | 413.1 GWh |
#117 | Rambler | San Angelo, TX | 411.8 GWh |
#118 | Tres Bahias | Port Lavaca, TX | 410.1 GWh |
#120 | Castle Gap Solar Hybrid | McCarney, TX | 405.7 GWh |
#121 | Riverstart Solar Park LLC | Modoc, IN | 405.0 GWh |
#122 | Yellow Pine Solar | Enterprise, NV | 389.3 GWh |
#123 | Sun Streams, LLC | Arlington, AZ | 402.1 GWh |
#124 | Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh |
#125 | Chestnut | Lemoore, CA | 374.8 GWh |
#126 | Big Plain Solar, LLC | London, OH | 399.0 GWh |
#127 | Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh |
#128 | Mustang Two | Lemoore, CA | 398.0 GWh |
#129 | Yellow Pine II | Enterprise, NV | 382.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mount Signal Solar Farm II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Campo Verde Solar | El Centro, CA | 294.7 GWh | 8.1 mi |
Centinela Solar Energy | Calexico, CA | 352.7 GWh | 1.7 mi |
Centinela State Prison | Sacramento, CA | 16.7 GWh | 14.1 mi |
Drew Solar LLC | Calexico, CA | 316.5 GWh | 2.5 mi |
Drop 5 | Calexico, CA | 6.4 GWh | 13.8 mi |
El Centro Hybrid | El Centro, CA | 1.1 TWh | 10.6 mi |
Heber Geothermal | Heber, CA | 384.9 GWh | 7.2 mi |
Heber Solar | Heber, CA | 24.6 GWh | 6 mi |
Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh | 1.7 mi |
Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh | 11.3 mi |
Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh | 2.4 mi |
IVC Solar | Imperial, CA | 4.2 GWh | 13.3 mi |
Mount Signal Solar Farm V | Calexico, CA | 685.5 GWh | 3.7 mi |
Second Imperial Geothermal | Heber, CA | 302.3 GWh | 6.3 mi |
SEPV Imperial Dixieland East | Imperial, CA | 4.2 GWh | 12 mi |
SEPV Imperial Dixieland West | Imperial, CA | 7.8 GWh | 12.3 mi |
Sol Orchard El Centro PV | El Centro, CA | 47.1 GWh | 10.5 mi |
USG 1 | El Centro, CA | 3.0 GWh | 15.8 mi |
Valencia 3 | Imperial, CA | 6.6 GWh | 15.9 mi |
Wistaria Ranch Solar | Calexico, CA | 294.8 GWh | 0.8 mi |