Edwards Sanborn S3
450 Purdy Ave, Mojave, CA 93501Plant Summary Information
Edwards Sanborn S3 is ranked #134 out of 885 solar farms in California in terms of total annual net electricity generation.
Edwards Sanborn S3 generated 21.1 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Edwards Sanborn S3 |
|---|---|
| Utility Name | Terra-Gen Operating Co-Hybrid |
| Location | Kern County, CA |
| Initial Operation Date | March 2022 |
| Last Update | May 2026 |
| Annual Generation | 81.1 GWh |
| Annual Consumption | 326.1 k MMBtu |
| Ranked #3,730 out of 13,081 Power Plants Nationwide | |
| Ranked #968 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #374 out of 1,606 California Power Plants | |
| Ranked #134 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Edwards Sanborn S3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Edwards Sanborn S3.
Monthly Net Generation for Edwards Sanborn S3
Monthly Plant Fuel Consumption for Edwards Sanborn S3
Edwards Sanborn S3 Details
| Summary Information | |
|---|---|
| Plant Name | Edwards Sanborn S3 (64928) |
| Plant Address | 450 Purdy Ave, Mojave, CA 93501 |
| Utility | Terra-Gen Operating Co-Hybrid (64366) |
| Latitude, Longitude | 35.01644, -118.1225 |
| Generation Dates on File | Mar 2022 to May 2026 |
| Initial Operation Date | March 2022 |
| Annual Generation | 81.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator PV Details Operating March 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | PHSP15 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | PHSP15 |
| Nameplate Capacity | 37.7 MW |
| Summer Capacity | 37.7 MW |
| Winter Capacity | 37.7 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 41.2 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BESS Details Operating July 2022
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | PHSP15 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | PHSP15 |
| Nameplate Capacity | 33 MW |
| Summer Capacity | 33 MW |
| Winter Capacity | 33 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 70 |
|---|---|
| Maximum Charge Rate | 33 MW |
| Maximum Discharge Rate | 33 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 35.1 |
| Storage Enclosure Type | CS |
| Arbitrage | Yes |
| Frequency Regulation | Yes |
| Ramping Spinning Reserve | Yes |
| Excess Wind And Solar Generation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 64928 |
| Direct Support Gen Id | PV |
| Support T D Asset | No |
Edwards Sanborn S3 Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| ES 1A Group 2 Opco, LLC | 437 Madison Ave, New York, NY 10022 | Generator BESS | 100.00% |
| ES 1A Group 2 Opco, LLC | 437 Madison Ave, New York, NY 10022 | Generator PV | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #958 | Pearl Solar | Fort Stockton, TX | 88.5 GWh |
| #959 | Hattiesburg Solar Farm | Hattiesburg, MS | 88.2 GWh |
| #960 | Partin Solar | Elkin, NC | 88.0 GWh |
| #961 | Sanford Solar | Sanford, ME | 87.3 GWh |
| #962 | Lafitte Solar, LLC | Monroe, LA | 86.9 GWh |
| #963 | Lake Placid Solar Power Plant | Lake Placid, FL | 86.6 GWh |
| #964 | Foothills Solar Plant Hybrid | Yuma, AZ | 80.2 GWh |
| #965 | Boardwalk | TBD, FL | 86.3 GWh |
| #966 | Sycamore Solar | Gretna, VA | 86.2 GWh |
| #967 | Pavant Solar II LLC | Fillmore, UT | 85.9 GWh |
| #969 | Fox Creek Solar | Louisburg, NC | 85.3 GWh |
| #970 | Beacon Solar Plant Site 5 | Cantil, CA | 84.8 GWh |
| #971 | East Atmore Solar | Flomaton, AL | 83.3 GWh |
| #972 | Moody Air Force Base Solar | Valdosta, GA | 82.2 GWh |
| #973 | Wolfskin Solar | Arnoldsville, GA | 82.6 GWh |
| #974 | Red Bud Solar Plant | Castalia, NC | 82.5 GWh |
| #975 | Goldenrod | Immokalee, FL | 82.5 GWh |
| #976 | Apple River Solar, LLC | Amery, WI | 82.3 GWh |
| #977 | BT Jungmann | Buckholts, TX | 82.0 GWh |
| #978 | Spectrum Solar PV Power Project | Las Vegas, NV | 81.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Edwards Sanborn S3.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Wind VIII | Mojave, CA | 219.2 GWh | 6.4 mi |
| Alta Wind X | Mojave, CA | 361.1 GWh | 5.3 mi |
| Bellefield Solar and Energy Storage Farm | Mojave, CA | 381.8 GWh | 3.8 mi |
| Brookfield Tehachapi 1 | Mojave, CA | 164.5 GWh | 6.8 mi |
| Difwind Farms Ltd VI | Mojave, CA | 12.6 GWh | 3.6 mi |
| Edwards Sanborn 1C | Mojave, CA | 205.9 GWh | 1.8 mi |
| Edwards Sanborn E1A | Mojave, CA | 317.5 GWh | 3.8 mi |
| Edwards Sanborn E1B | Mojave, CA | 354.4 GWh | 4 mi |
| Edwards Sanborn E2 | Mojave, CA | 291.6 GWh | 5.2 mi |
| Edwards Sanborn E3 | Mojave, CA | 58.4 GWh | 4.8 mi |
| Edwards Sanborn E4 | Mojave, CA | 329.8 GWh | 5.4 mi |
| Edwards Sanborn E5 | Mojave, CA | 153.0 GWh | 4.4 mi |
| Edwards Sanborn S1 | Mojave, CA | 97.6 GWh | 1 mi |
| Edwards Sanborn S4 | Mojave, CA | 93.0 GWh | 0.3 mi |
| Pinyon Pine I | Mojave, CA | 283.1 GWh | 5.4 mi |
| Pinyon Pine II | Mojave, CA | 204.3 GWh | 5.8 mi |
| RE Camelot LLC | Mojave, CA | 121.0 GWh | 3.6 mi |
| RE Columbia 3 LLC | Mojave, CA | 23.1 GWh | 2.4 mi |
| RE Columbia Two, LLC | Mojave, CA | 41.5 GWh | 3.6 mi |
| RE Rio Grande Solar LLC | Mojave, CA | 10.3 GWh | 2.5 mi |