Eland Solar & Storage Center, Phase 1 Hy
TBD, Mojave, CA 93280Plant Summary Information
Eland Solar & Storage Center, Phase 1 Hy is ranked #47 out of 6,400 solar farms nationwide in terms of total annual net electricity generation.
Eland Solar & Storage Center, Phase 1 Hy generated 234.6 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Eland Solar & Storage Center, Phase 1 Hy |
|---|---|
| Utility Name | 68SF 8me LLC |
| Location | Kern County, CA |
| Initial Operation Date | November 2024 |
| Last Update | Sep 2025 |
| Annual Generation | 609.1 GWh |
| Annual Consumption | 2.1 M MMBtu |
| Ranked #1,117 out of 12,539 Power Plants Nationwide | |
| Ranked #47 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #62 out of 1,600 California Power Plants | |
| Ranked #15 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Eland Solar & Storage Center, Phase 1 Hy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eland Solar & Storage Center, Phase 1 Hy.
Monthly Net Generation for Eland Solar & Storage Center, Phase 1 Hy
Eland Solar & Storage Center, Phase 1 Hy Details
| Summary Information | |
|---|---|
| Plant Name | Eland Solar & Storage Center, Phase 1 Hy (61168) |
| Plant Address | TBD, Mojave, CA 93280 |
| Utility | 68SF 8me LLC (60797) |
| Latitude, Longitude | 35.2237, -117.977 |
| Generation Dates on File | Nov 2024 to Sep 2025 |
| Initial Operation Date | November 2024 |
| Annual Generation | 609.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator 61168 Details Operating November 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 150 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 600 |
|---|---|
| Maximum Charge Rate | 150 MW |
| Maximum Discharge Rate | 150 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 100 |
| Storage Enclosure Type | CS |
| Frequency Regulation | Yes |
| Load Following | Yes |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 60797 |
| Direct Support Gen Id | 61168 |
| Support T D Asset | Yes |
Generator 68SF8 Details Operating November 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 309.6 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 384 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Eland Solar & Storage Center, Phase 1 Hy Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | Generator 61168 | 100.00% |
| Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | Generator 68SF8 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #37 | Lumina Solar Project | Snyder, TX | 687.8 GWh |
| #38 | Copper Mountain Solar 5, LLC | Boulder City, NV | 688.1 GWh |
| #39 | Dunns Bridge II Solar | San Pierre, IN | 670.9 GWh |
| #40 | Aquamarine | Lemoore, CA | 679.2 GWh |
| #41 | Mount Signal Solar Farm V | Calexico, CA | 673.8 GWh |
| #42 | Silver State Solar Power South | Primm Valley, NV | 672.7 GWh |
| #43 | Prospero Solar II | Andrews, TX | 671.4 GWh |
| #44 | McCoy Solar Energy Project Hybrid | Blythe, CA | 646.7 GWh |
| #45 | Desert Sunlight 300, LLC | Desert Center, CA | 666.9 GWh |
| #46 | Arlington Energy Center II | Blythe, CA | 633.4 GWh |
| #48 | IP Radian, LLC | Brookesmith, TX | 627.7 GWh |
| #49 | Genesis Solar Energy Project | Blythe, CA | 623.0 GWh |
| #50 | Stateline Solar | Nipton, CA | 619.9 GWh |
| #51 | Victory Pass | Desert Center, CA | 609.7 GWh |
| #52 | Oberon II Solar Project | Desert Center, CA | 598.4 GWh |
| #53 | Arrow Canyon Solar Hybrid | Moapa, NV | 600.6 GWh |
| #54 | Moapa Southern Paiute | Moapa, NV | 613.1 GWh |
| #55 | Copper Mountain Solar 3 | Boulder City, NV | 607.4 GWh |
| #56 | Wadley Solar | Wadley, GA | 602.3 GWh |
| #57 | Hecate Energy Highland LLC | Buford, OH | 602.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eland Solar & Storage Center, Phase 1 Hy.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beacon Solar Plant Site 2 | Cantil, CA | 113.9 GWh | 3.2 mi |
| Beacon Solar Plant Site 5 | Cantil, CA | 90.4 GWh | 3.7 mi |
| CalCity Solar 1 | California City, CA | 7.9 GWh | 5.7 mi |
| California City | California City, CA | 4.6 GWh | 4.6 mi |
| Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 16.2 mi |
| Edwards Sanborn S1 | Mojave, CA | 99.6 GWh | 16.2 mi |
| Edwards Sanborn S3 | Mojave, CA | 83.4 GWh | 16.5 mi |
| Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 121.2 GWh | 0.5 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 130.7 GWh | 3.8 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 124.8 GWh | 2.9 mi |
| Hecate Energy Beacon Solar 4 | Cantil, CA | 117.2 GWh | 3.5 mi |
| North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 14.6 mi |
| Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 12.4 mi |
| Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 11.3 mi |
| RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 5.3 mi |
| Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 16 mi |
| Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 15.4 mi |
| Springbok 3 Solar Farm Hybrid | Cantil, CA | 252.6 GWh | 3.9 mi |
| Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 2.1 mi |
| Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 1.8 mi |