Eland Solar & Storage Center, Phase 1 Hy
TBD, Mojave, CA 93280Plant Summary Information
Eland Solar & Storage Center, Phase 1 Hy is ranked #81 out of 817 solar farms in California in terms of total annual net electricity generation.
Eland Solar & Storage Center, Phase 1 Hy generated 112.7 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Eland Solar & Storage Center, Phase 1 Hy |
---|---|
Utility Name | 68SF 8me LLC |
Location | Kern County, CA |
Initial Operation Date | November 2024 |
Last Update | Apr 2025 |
Annual Generation | 224.6 GWh |
Annual Consumption | 799.3 k MMBtu |
Ranked #2,258 out of 12,299 Power Plants Nationwide | |
Ranked #271 out of 6,182 Solar Power Plants Nationwide | |
Ranked #243 out of 1,566 California Power Plants | |
Ranked #81 out of 817 California Solar Power Plants | |
Fuel Types | Solar |
Map of Eland Solar & Storage Center, Phase 1 Hy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eland Solar & Storage Center, Phase 1 Hy.
Monthly Net Generation for Eland Solar & Storage Center, Phase 1 Hy
Eland Solar & Storage Center, Phase 1 Hy Details
Summary Information | |
---|---|
Plant Name | Eland Solar & Storage Center, Phase 1 Hy (61168) |
Plant Address | TBD, Mojave, CA 93280 |
Utility | 68SF 8me LLC (60797) |
Latitude, Longitude | 35.2237, -117.977 |
Generation Dates on File | Nov 2024 to Apr 2025 |
Initial Operation Date | November 2024 |
Annual Generation | 224.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator 61168 Details Operating November 2024
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 150 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 600 |
---|---|
Maximum Charge Rate | 150 MW |
Maximum Discharge Rate | 150 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 100 |
Storage Enclosure Type | CS |
Frequency Regulation | Yes |
Load Following | Yes |
Voltage Or Reactive Power Support | Yes |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 60797 |
Direct Support Gen Id | 61168 |
Support T D Asset | Yes |
Generator 68SF8 Details Operating November 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 309.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 384 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Eland Solar & Storage Center, Phase 1 Hy Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | Generator 61168 | 100.00% |
Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | Generator 68SF8 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#261 | Willow Spring Solar, LLC | Rosamond, CA | 243.5 GWh |
#262 | SR Snipesville II | Denton, GA | 242.2 GWh |
#263 | SR Snipesville III | Denton, GA | 241.4 GWh |
#264 | Oak Trail Solar, LLC | Moyock, NC | 241.1 GWh |
#265 | Alamo 6 | Fort Stockton, TX | 240.8 GWh |
#266 | Robins Air Force Base Solar | Macon, GA | 240.3 GWh |
#267 | Elara Solar | Pearsall, TX | 238.3 GWh |
#268 | Wild Springs | New Underwood, SD | 237.0 GWh |
#269 | East Pecos Solar | McCamey, TX | 236.9 GWh |
#270 | White Wing Solar | Yuma, AZ | 234.6 GWh |
#272 | RE Mustang LLC | Lemoore, CA | 220.6 GWh |
#273 | Assembly Solar II LLC | Lennon, MI | 233.5 GWh |
#274 | CA Flats Solar 130, LLC | Shandon, CA | 233.3 GWh |
#275 | Galloway 2 Solar Farm | Paint Rock, TX | 232.8 GWh |
#276 | Comanche Solar | Pueblo, CO | 232.4 GWh |
#277 | Three Peaks Power | Cedar City, UT | 230.5 GWh |
#278 | Prairie State Solar Project | Swanwick Township, IL | 230.3 GWh |
#279 | Oak Solar | Gaston, NC | 229.9 GWh |
#280 | SR Lumpkin | Lumpkin, GA | 229.6 GWh |
#281 | Enterprise Solar, LLC | Newcastle, UT | 228.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eland Solar & Storage Center, Phase 1 Hy.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beacon Solar Plant Site 2 | Cantil, CA | 115.1 GWh | 3.2 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 95.7 GWh | 3.7 mi |
CalCity Solar 1 | California City, CA | 7.9 GWh | 5.7 mi |
California City | California City, CA | 4.6 GWh | 4.6 mi |
Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 16.2 mi |
Edwards Sanborn S1 | Mojave, CA | 94.8 GWh | 16.2 mi |
Edwards Sanborn S3 | Mojave, CA | 82.3 GWh | 16.5 mi |
Edwards Sanborn S4 | Mojave, CA | 81.2 GWh | 16.7 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 131.0 GWh | 3.8 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 130.1 GWh | 2.9 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 116.6 GWh | 3.5 mi |
North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 14.6 mi |
Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 12.4 mi |
Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 11.3 mi |
RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 5.3 mi |
Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 16 mi |
Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 15.4 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 250.8 GWh | 3.9 mi |
Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 2.1 mi |
Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 1.8 mi |