Wistaria Ranch Solar
394 Rockwood Road, Calexico, CA 92231Plant Summary Information
Wistaria Ranch Solar is ranked #70 out of 849 solar farms in California in terms of total annual net electricity generation.
Wistaria Ranch Solar generated 75.3 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Wistaria Ranch Solar |
|---|---|
| Utility Name | Consolidated Edison Development Inc. |
| Location | Imperial County, CA |
| Initial Operation Date | December 2018 |
| Last Update | Oct 2025 |
| Annual Generation | 291.1 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #1,995 out of 12,553 Power Plants Nationwide | |
| Ranked #267 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #178 out of 1,601 California Power Plants | |
| Ranked #70 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Wistaria Ranch Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wistaria Ranch Solar.
Monthly Net Generation for Wistaria Ranch Solar
Wistaria Ranch Solar Details
| Summary Information | |
|---|---|
| Plant Name | Wistaria Ranch Solar (61750) |
| Plant Address | 394 Rockwood Road, Calexico, CA 92231 |
| Utility | Consolidated Edison Development Inc. (56769) |
| Latitude, Longitude | 32.676, -115.619 |
| Generation Dates on File | Dec 2018 to Oct 2025 |
| Initial Operation Date | December 2018 |
| Annual Generation | 291.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 18-76 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator WICA Details Operating December 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 106.7 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 141 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Wistaria Ranch Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #257 | Upton County Solar | McCamey, TX | 299.6 GWh |
| #258 | CA Flats Solar 150, LLC | Shandon, CA | 299.6 GWh |
| #259 | Harry Allen Solar Energy LLC | Apex, NV | 298.8 GWh |
| #260 | Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh |
| #261 | Hudson - High Desert Hybrid | Victorville, CA | 286.7 GWh |
| #262 | Serrano | Marana, AZ | 281.2 GWh |
| #263 | Campo Verde Solar | El Centro, CA | 294.7 GWh |
| #264 | Ray Ranch Solar | Pettus, TX | 294.0 GWh |
| #265 | Darien Solar | Darien, WI | 291.7 GWh |
| #266 | Baldy Mesa Solar & Storage | Adelanto, CA | 286.6 GWh |
| #268 | Valentine Solar, LLC | Rosamond, CA | 290.4 GWh |
| #269 | River Fork Solar, LLC | Albion, MI | 289.5 GWh |
| #270 | Bright Arrow Solar, LLC | Sulphur Springs, TX | 285.0 GWh |
| #271 | Hardin Solar Energy LLC | Alger, OH | 288.6 GWh |
| #272 | Nebula Solar | La Feria, TX | 288.5 GWh |
| #273 | Mesquite Solar 2, LLC | Tonopah, AZ | 287.9 GWh |
| #274 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 287.1 GWh |
| #275 | Saint Solar | Coolidge, AZ | 286.4 GWh |
| #276 | Rancho Seco Solar II, LLC | Twin Cities, CA | 285.6 GWh |
| #277 | North Fork Solar Project | Snyder, OK | 283.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wistaria Ranch Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Campo Verde Solar | El Centro, CA | 294.7 GWh | 8.2 mi |
| Centinela Solar Energy | Calexico, CA | 352.7 GWh | 1.8 mi |
| Centinela State Prison | Sacramento, CA | 16.7 GWh | 14.1 mi |
| Drew Solar LLC | Calexico, CA | 309.4 GWh | 2.8 mi |
| Drop 5 (CA) | Calexico, CA | 6.4 GWh | 13.2 mi |
| El Centro Hybrid | El Centro, CA | 1.1 TWh | 9.9 mi |
| Heber Geothermal | Heber, CA | 384.9 GWh | 6.5 mi |
| Heber Solar | Heber, CA | 24.6 GWh | 5.2 mi |
| Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh | 2.4 mi |
| Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh | 11.4 mi |
| Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh | 1.9 mi |
| IVC Solar | Imperial, CA | 4.2 GWh | 12.6 mi |
| Mount Signal Solar Farm II | Calexico, CA | 403.8 GWh | 0.8 mi |
| Mount Signal Solar Farm V | Calexico, CA | 675.3 GWh | 3 mi |
| Second Imperial Geothermal | Heber, CA | 302.3 GWh | 5.5 mi |
| SEPV Imperial Dixieland East | Imperial, CA | 4.2 GWh | 12 mi |
| SEPV Imperial Dixieland West | Imperial, CA | 7.8 GWh | 12.4 mi |
| Sol Orchard El Centro PV | El Centro, CA | 47.1 GWh | 9.8 mi |
| USG 1 | El Centro, CA | 3.0 GWh | 16 mi |
| Valencia 3 | Imperial, CA | 6.6 GWh | 15.2 mi |