Wistaria Ranch Solar
394 Rockwood Road, Calexico, CA 92231Plant Summary Information
Wistaria Ranch Solar is ranked #70 out of 852 solar farms in California in terms of total annual net electricity generation.
Wistaria Ranch Solar generated 56.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Wistaria Ranch Solar |
|---|---|
| Utility Name | Consolidated Edison Development Inc. |
| Location | Imperial County, CA |
| Initial Operation Date | December 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 288.9 GWh |
| Annual Consumption | 1.0 M MMBtu |
| Ranked #2,031 out of 12,613 Power Plants Nationwide | |
| Ranked #280 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #184 out of 1,603 California Power Plants | |
| Ranked #70 out of 852 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Wistaria Ranch Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wistaria Ranch Solar.
Monthly Net Generation for Wistaria Ranch Solar
Monthly Plant Fuel Consumption for Wistaria Ranch Solar
Wistaria Ranch Solar Details
| Summary Information | |
|---|---|
| Plant Name | Wistaria Ranch Solar (61750) |
| Plant Address | 394 Rockwood Road, Calexico, CA 92231 |
| Utility | Consolidated Edison Development Inc. (56769) |
| Latitude, Longitude | 32.676, -115.619 |
| Generation Dates on File | Dec 2018 to Dec 2025 |
| Initial Operation Date | December 2018 |
| Annual Generation | 288.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 18-76 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator WICA Details Operating December 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 106.7 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 141 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Wistaria Ranch Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #270 | Skipjack Solar Center | Wayside, VA | 298.4 GWh |
| #271 | Hudson - High Desert Hybrid | Victorville, CA | 289.0 GWh |
| #272 | Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh |
| #273 | Harry Allen Solar Energy LLC | Apex, NV | 296.9 GWh |
| #274 | Paris Solar | Union Grove, WI | 296.4 GWh |
| #275 | Campo Verde Solar | El Centro, CA | 294.7 GWh |
| #276 | North Fork Solar Project | Snyder, OK | 294.3 GWh |
| #277 | River Fork Solar, LLC | Albion, MI | 293.4 GWh |
| #278 | Hardin Solar Energy LLC | Alger, OH | 291.5 GWh |
| #279 | Nebula Solar | La Feria, TX | 291.3 GWh |
| #281 | Valentine Solar, LLC | Rosamond, CA | 287.7 GWh |
| #282 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 286.8 GWh |
| #283 | Holstein 1 Solar Farm | Wingate, TX | 286.8 GWh |
| #284 | Boomtown Renewable Energy Center | Carmi, IL | 286.3 GWh |
| #285 | Mesquite Solar 2, LLC | Tonopah, AZ | 285.5 GWh |
| #286 | Saint Solar | Coolidge, AZ | 284.1 GWh |
| #287 | Colonial Trail West | Spring Grove, VA | 283.4 GWh |
| #288 | Clearview Solar 1 | Quincy, OH | 282.3 GWh |
| #289 | Elizabeth Solar Plant | Pitkin, LA | 279.8 GWh |
| #290 | Unbridled Solar | Robards, KY | 279.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wistaria Ranch Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Campo Verde Solar | El Centro, CA | 294.7 GWh | 8.2 mi |
| Centinela Solar Energy | Calexico, CA | 352.7 GWh | 1.8 mi |
| Centinela State Prison | Sacramento, CA | 16.7 GWh | 14.1 mi |
| Drew Solar LLC | Calexico, CA | 308.3 GWh | 2.8 mi |
| Drop 5 (CA) | Calexico, CA | 6.4 GWh | 13.2 mi |
| El Centro Hybrid | El Centro, CA | 1.1 TWh | 9.9 mi |
| Heber Geothermal | Heber, CA | 384.9 GWh | 6.5 mi |
| Heber Solar | Heber, CA | 24.6 GWh | 5.2 mi |
| Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh | 2.4 mi |
| Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh | 11.4 mi |
| Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh | 1.9 mi |
| IVC Solar | Imperial, CA | 4.2 GWh | 12.6 mi |
| Mount Signal Solar Farm II | Calexico, CA | 402.5 GWh | 0.8 mi |
| Mount Signal Solar Farm V | Calexico, CA | 674.3 GWh | 3 mi |
| Second Imperial Geothermal | Heber, CA | 302.3 GWh | 5.5 mi |
| SEPV Imperial Dixieland East | Imperial, CA | 4.2 GWh | 12 mi |
| SEPV Imperial Dixieland West | Imperial, CA | 7.8 GWh | 12.4 mi |
| Sol Orchard El Centro PV | El Centro, CA | 47.1 GWh | 9.8 mi |
| USG 1 | El Centro, CA | 3.0 GWh | 16 mi |
| Valencia 3 | Imperial, CA | 6.6 GWh | 15.2 mi |