Voyager Wind II
7021 Oak Creek Rd, Mojave, CA 93501Plant Summary Information
Voyager Wind II is ranked #3 out of 108 wind farms in California in terms of total annual net electricity generation.
Voyager Wind II generated 155.2 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Voyager Wind II |
|---|---|
| Utility Name | Terra-Gen Operating Co-Wind |
| Location | Kern County, CA |
| Initial Operation Date | December 2018 |
| Last Update | Jun 2026 |
| Annual Generation | 431.4 GWh |
| Annual Consumption | 1.7 M MMBtu |
| Ranked #1,539 out of 13,094 Power Plants Nationwide | |
| Ranked #442 out of 1,369 Wind Power Plants Nationwide | |
| Ranked #102 out of 1,607 California Power Plants | |
| Ranked #3 out of 108 California Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Terra-Gen Operating Co LLC (2017 to 2017) Terra-Gen Operating Co-Wind (2018 to 2025) |
Map of Voyager Wind II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Voyager Wind II.
Monthly Net Generation for Voyager Wind II
Monthly Plant Fuel Consumption for Voyager Wind II
Voyager Wind II Details
| Summary Information | |
|---|---|
| Plant Name | Voyager Wind II (61582) |
| Plant Address | 7021 Oak Creek Rd, Mojave, CA 93501 |
| Utility | Terra-Gen Operating Co-Wind (2770) |
| Latitude, Longitude | 35.07338, -118.26862 |
| Generation Dates on File | Dec 2018 to Jun 2026 |
| Initial Operation Date | December 2018 |
| Annual Generation | 431.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator VYGR2 Details Operating December 2018
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 128.7 MW |
| Summer Capacity | 128.7 MW |
| Winter Capacity | 128.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 36 |
| Turbine Details | |
| Number Of Turbines | 36 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V117-3.45 |
| Design Wind Speed | 22 MPH |
| Wind Quality Class | 1 - High Wind |
| Turbine Hub Height Feet | 275 |
Voyager Wind II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #432 | Slate Creek Wind Project LLC | Geuda Springs, KS | 444.7 GWh |
| #433 | Fowler Ridge IV Wind Farm LLC | Fowler, IN | 444.3 GWh |
| #434 | Lane City Wind | Lane City, TX | 443.9 GWh |
| #435 | Wildhorse Mountain Wind Facility | Clayton, OK | 442.1 GWh |
| #436 | Mesquite Creek Wind | Lamesa, TX | 440.3 GWh |
| #437 | Lake Benton II | Ruthton, MN | 440.0 GWh |
| #438 | Cimarron Windpower II | Cimarron, KS | 437.0 GWh |
| #439 | Glen Ullin Energy Center | Glen Ullin, ND | 434.2 GWh |
| #440 | Day County Wind LLC | Conde, SD | 432.1 GWh |
| #441 | Meadow Lake Wind Farm LLC | Lafayette, IN | 431.7 GWh |
| #443 | Bishop Hill III | Cambridge, IL | 431.2 GWh |
| #444 | Buffalo Ridge Wind | Lake Benton, MN | 430.8 GWh |
| #445 | Sunflower Wind Project | Mandan, ND | 430.8 GWh |
| #446 | Gunsight Mountain Wind Energy LLC | Big Spring, TX | 430.6 GWh |
| #447 | Heartland Divide Wind Project, LLC | Melville, IA | 429.8 GWh |
| #448 | Anticline Wind | Casper, WY | 425.5 GWh |
| #449 | Buckeye Wind Energy Center | Hays, KS | 422.9 GWh |
| #450 | Tatanka Wind Power LLC | Ashley, ND | 422.5 GWh |
| #451 | Cactus Flats Wind Energy Project | Eden, TX | 422.5 GWh |
| #452 | Post Rock Wind Power Project, LLC | Ellsworth, KS | 422.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Voyager Wind II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 85 A | Tehachapi, CA | 70.6 GWh | 3.5 mi |
| Cameron Ridge LLC | Mojave, CA | 148.0 GWh | 2.7 mi |
| Coram Energy LLC (4.5MW) | Tehachapi, CA | 9.0 GWh | 2.5 mi |
| Mojave 16/17/18 | Mojave, CA | 66.3 GWh | 2 mi |
| Mojave 3/4/5 | Mojave, CA | 125.0 GWh | 1.7 mi |
| Mustang Hills LLC | Mojave, CA | 267.1 GWh | 3.3 mi |
| Oak Creek Energy Systems I | Mojave, CA | 57.3 GWh | 2.1 mi |
| Oasis Alta | Mojave, CA | 49.3 GWh | 1.6 mi |
| Oasis Wind | Mojave, CA | 221.1 GWh | 1.6 mi |
| Ridgetop | Mojave, CA | 117.6 GWh | 2.6 mi |
| Ridgetop Energy LLC | Mojave, CA | 24.5 GWh | 2.7 mi |
| Rising Tree Wind Farm | Mojave, CA | 250.4 GWh | 2.9 mi |
| Rising Tree Wind Farm II | Mojave, CA | 53.7 GWh | 3.7 mi |
| Rising Tree Wind Farm III | Mojave, CA | 260.1 GWh | 1.7 mi |
| SEPV Mojave West | Mojave, CA | 52.7 GWh | 3.6 mi |
| Tehachapi Wind Resource II | Tehachapi, CA | 47.6 GWh | 3.3 mi |
| TPC Windfarms LLC | Mojave, CA | 42.1 GWh | 1.7 mi |
| Voyager Wind I | Mojave, CA | 345.6 GWh | 2 mi |
| Voyager Wind III | Mojave, CA | 120.0 GWh | 0.9 mi |
| Voyager Wind IV | Mojave, CA | 78.7 GWh | 1.1 mi |