Voyager Wind II
7021 Oak Creek Rd, Mojave, CA 93501Plant Summary Information
Voyager Wind II is ranked #3 out of 108 wind farms in California in terms of total annual net electricity generation.
Voyager Wind II generated 71.1 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Voyager Wind II |
|---|---|
| Utility Name | Terra-Gen Operating Co-Wind |
| Location | Kern County, CA |
| Initial Operation Date | December 2018 |
| Last Update | Mar 2026 |
| Annual Generation | 451.8 GWh |
| Annual Consumption | 1.7 M MMBtu |
| Ranked #1,470 out of 12,332 Power Plants Nationwide | |
| Ranked #412 out of 1,358 Wind Power Plants Nationwide | |
| Ranked #96 out of 1,530 California Power Plants | |
| Ranked #3 out of 108 California Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Terra-Gen Operating Co LLC (2017 to 2017) Terra-Gen Operating Co-Wind (2018 to 2024) |
Map of Voyager Wind II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Voyager Wind II.
Monthly Net Generation for Voyager Wind II
Monthly Plant Fuel Consumption for Voyager Wind II
Voyager Wind II Details
| Summary Information | |
|---|---|
| Plant Name | Voyager Wind II (61582) |
| Plant Address | 7021 Oak Creek Rd, Mojave, CA 93501 |
| Utility | Terra-Gen Operating Co-Wind (2770) |
| Latitude, Longitude | 35.07338, -118.26862 |
| Generation Dates on File | Dec 2018 to Mar 2026 |
| Initial Operation Date | December 2018 |
| Annual Generation | 451.8 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator VYGR2 Details Operating December 2018
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 128.7 MW |
| Summer Capacity | 128.7 MW |
| Winter Capacity | 128.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 36 |
| Turbine Details | |
| Number Of Turbines | 36 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V117-3.45 |
| Design Wind Speed | 22 MPH |
| Wind Quality Class | 1 - High Wind |
| Turbine Hub Height Feet | 275 |
Voyager Wind II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #402 | Wildcat Creek Wind Farm LLC | Gainesville, TX | 462.0 GWh |
| #403 | Walleye Wind | Beaver Creek, MN | 461.3 GWh |
| #404 | Gunsight Mountain Wind Energy LLC | Big Spring, TX | 460.7 GWh |
| #405 | Buffalo Ridge II LLC | Elkton, SD | 459.4 GWh |
| #406 | Marble River Wind Farm | Churubusco, NY | 459.4 GWh |
| #407 | Pioneer Trail Wind Farm, LLC | Paxton, IL | 458.8 GWh |
| #408 | Ford County Wind Farm LLC | Ford County, IL | 456.7 GWh |
| #409 | Los Vientos Windpower III | Rio Grande City, TX | 455.9 GWh |
| #410 | Heartland Farms | Middleton, MI | 454.5 GWh |
| #411 | Prairie Rose Wind Farm | Hardwick, MN | 454.0 GWh |
| #413 | Ponderosa Wind II | Balko, OK | 451.7 GWh |
| #414 | Briscoe Wind Farm | Silverton, TX | 451.1 GWh |
| #415 | La Chalupa, LLC | Rio Hondo, TX | 450.5 GWh |
| #416 | Scioto Ridge Wind Farm | Belle Center, OH | 449.7 GWh |
| #417 | Prairie Queen Wind Farm | Moran, KS | 448.3 GWh |
| #418 | Polaris Wind Park | North Star Township, MI | 448.2 GWh |
| #419 | Otter Creek Wind Farm LLC | Ransom, IL | 447.1 GWh |
| #420 | Ranchland Wind Project I | Cisco, TX | 446.6 GWh |
| #421 | Shannon Wind | Windhorst, TX | 444.2 GWh |
| #422 | Meadow Lake Wind Farm LLC | Lafayette, IN | 442.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Voyager Wind II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 85 A | Tehachapi, CA | 71.2 GWh | 3.5 mi |
| Cameron Ridge LLC | Mojave, CA | 144.0 GWh | 2.7 mi |
| Coram Energy LLC (4.5MW) | Tehachapi, CA | 9.5 GWh | 2.5 mi |
| Mojave 16/17/18 | Mojave, CA | 73.9 GWh | 2 mi |
| Mojave 3/4/5 | Mojave, CA | 132.8 GWh | 1.7 mi |
| Mustang Hills LLC | Mojave, CA | 301.5 GWh | 3.3 mi |
| Oak Creek Energy Systems I | Mojave, CA | 54.5 GWh | 2.1 mi |
| Oasis Alta | Mojave, CA | 57.0 GWh | 1.6 mi |
| Oasis Wind | Mojave, CA | 238.4 GWh | 1.6 mi |
| Ridgetop | Mojave, CA | 145.9 GWh | 2.6 mi |
| Ridgetop Energy LLC | Mojave, CA | 27.0 GWh | 2.7 mi |
| Rising Tree Wind Farm | Mojave, CA | 249.0 GWh | 2.9 mi |
| Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 3.7 mi |
| Rising Tree Wind Farm III | Mojave, CA | 261.4 GWh | 1.7 mi |
| SEPV Mojave West | Mojave, CA | 53.5 GWh | 3.6 mi |
| Tehachapi Wind Resource II | Tehachapi, CA | 46.1 GWh | 3.3 mi |
| TPC Windfarms LLC | Mojave, CA | 46.5 GWh | 1.7 mi |
| Voyager Wind I | Mojave, CA | 359.9 GWh | 2 mi |
| Voyager Wind III | Mojave, CA | 123.1 GWh | 0.9 mi |
| Voyager Wind IV | Mojave, CA | 80.9 GWh | 1.1 mi |