Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| RE Kammerer 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.5 GWh | Dec 2011 | Dec 2025 | Solar |
| RE Dillard 2 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 5.9 GWh | Dec 2011 | Dec 2025 | Solar |
| RE Kammerer 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.5 GWh | Jan 2012 | Dec 2025 | Solar |
| RE Dillard 3 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 5.9 GWh | Dec 2011 | Dec 2025 | Solar |
| RE Kammerer 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.5 GWh | Jan 2012 | Dec 2025 | Solar |
| RE Bruceville 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.8 GWh | Dec 2011 | Dec 2025 | Solar |
| RE Bruceville 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 9.5 GWh | Jan 2012 | Dec 2025 | Solar |
| RE Bruceville 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Jan 2012 | Dec 2025 | Solar |
| Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.1 GWh | Oct 2011 | Dec 2025 | Wind |
| Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 404.0 MWh | Nov 2011 | Dec 2025 | Wind |
| Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2012 | Dec 2025 | Solar |
| Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2012 | Dec 2025 | Solar |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 8.9 GWh | Oct 2011 | Dec 2025 | Natural Gas |
| RE McKenzie 1 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2025 | Solar |
| RE McKenzie 2 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2025 | Solar |
| RE McKenzie 3 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2025 | Solar |
| RE McKenzie 4 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2025 | Solar |
| RE McKenzie 5 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2025 | Solar |
| RE McKenzie 6 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2025 | Solar |
| Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2011 | Dec 2025 | Solar |
| Heliocentric | Heliocentric LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2012 | Dec 2025 | Solar |
| Mustang Hills LLC | Mustang Hills, LLC (Longroad) | Mojave, CA | California Independent System Operator (CISO) | 267.1 GWh | Apr 2012 | Dec 2025 | Wind |
| Pinyon Pine I | Pinyon Pines Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 283.1 GWh | Oct 2012 | Dec 2025 | Wind |
| Alta Wind VIII | Nextera Energy Resources | Mojave, CA | California Independent System Operator (CISO) | 219.2 GWh | Dec 2011 | Dec 2025 | Wind |
| L-8 Solar Project | L-8 Solar Project LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.3 GWh | Apr 2012 | Dec 2025 | Solar |
| Pinyon Pine II | Pinyon Pines Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 204.3 GWh | Oct 2012 | Dec 2025 | Wind |
| ISH Solar Hospital SDMC | Kaiser Permanente | San Diego, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2011 | Dec 2025 | Solar |
| ISH Solar Hospital Downey | Kaiser Permanente | Downey, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2011 | Dec 2025 | Solar |
| Green Acres Solar Facility 1 | SIT Renewables, Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 3.1 GWh | Aug 2012 | Dec 2025 | Solar |
| Green Acres Solar Facility 2 | SIT Renewables, Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 1.2 GWh | Aug 2012 | Dec 2025 | Solar |
| Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2008 | Dec 2025 | Solar |
| Industry MetroLink PV 1 | City of Industry - (CA) | Industry, CA | California Independent System Operator (CISO) | 1.4 GWh | Mar 2012 | Dec 2025 | Solar |
| Santa Cruz Energy | Santa Cruz Energy LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 9.2 GWh | Oct 2009 | Dec 2025 | Landfill Gas |
| Guernsey Solar Station | Pacific Gas & Electric Co. | Hanford, CA | California Independent System Operator (CISO) | 21.5 GWh | Jul 2013 | Dec 2025 | Solar |
| Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 30.5 GWh | May 2013 | Dec 2025 | Solar |
| San Antonio West Solar Rooftop | SS San Antonio West LLC | Chino, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2012 | Dec 2025 | Solar |
| Solar Star California II LLC | Solar Star California II LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.8 GWh | Jul 2012 | Dec 2025 | Solar |
| Brookfield Tehachapi 1 | Coram California Development, L.P. | Mojave, CA | California Independent System Operator (CISO) | 164.5 GWh | Feb 2012 | Dec 2025 | Wind |
| Butte College Main Campus Solar | Butte-Glenn Community College District | Oroville, CA | California Independent System Operator (CISO) | 6.6 GWh | Jun 2011 | Dec 2025 | Solar |
| SF Southeast Cogen Plant | City & County of San Francisco - (CA) | San Francisco, CA | California Independent System Operator (CISO) | 341.0 MWh | May 2002 | Dec 2025 | Other Biomass Gas |
| High Sierra Cogeneration Plant | Plumas Sierra Rural Electric Coop | Susanville, CA | California Independent System Operator (CISO) | 33.2 GWh | Jan 2010 | Dec 2025 | Natural Gas |
| Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 29.4 GWh | Oct 2004 | Dec 2025 | Landfill Gas |
| Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 620.2 GWh | Oct 2013 | Dec 2025 | Solar |
| Alpaugh North | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 21.1 GWh | Nov 2012 | Dec 2025 | Solar |
| Alpaugh 50 | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 57.3 GWh | Nov 2012 | Dec 2025 | Solar |
| Nickel 1 Solar Facility | Altus Power America Management, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2012 | Dec 2025 | Solar |
| Axium Modesto Solar | Axium US Solar Holdings LLC | Modesto, CA | California Independent System Operator (CISO) | 53.2 GWh | Nov 2012 | Dec 2025 | Solar |
| Imperial Valley Solar Company 1 LLC | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 33.1 GWh | May 2012 | Dec 2025 | Solar |
| SEPV 1 | CVI CleanCapital Solar 1 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.5 GWh | Apr 2012 | Dec 2025 | Solar |
| SEPV 2 | CVI CleanCapital Solar 1 LLC | Twentynine Palms, CA | California Independent System Operator (CISO) | 3.1 GWh | May 2012 | Dec 2025 | Solar |
| Intel Folsom | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.3 GWh | Jun 2010 | Dec 2025 | Solar |
| Foundation Cemex River Plant | Foundation CA Fund VI Manager LLC | Victorville, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2012 | Dec 2025 | Wind |
| Foundation Cemex BMQ | Foundation CA Fund VI Manager LLC | Apple Valley, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2012 | Dec 2025 | Wind |
| Foundation Cemex Madison | Foundation CA Fund V Manager, LLC | Madison, CA | California Independent System Operator (CISO) | 1.5 GWh | Jul 2012 | Dec 2025 | Wind |
| Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 9.7 GWh | Nov 2012 | Dec 2025 | Wind |
| Foundation NWNA | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 22.5 GWh | Nov 2012 | Dec 2025 | Wind |
| La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 806.0 MWh | Nov 2012 | Dec 2025 | Solar |
| Depot Park Solar System | Depot Park Solar Farm | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.7 GWh | Nov 2010 | Dec 2025 | Solar |
| Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 2012 | Dec 2025 | Natural Gas |
| Kaiser Downey | Bloom Energy 2009 PPA | Downey, CA | California Independent System Operator (CISO) | 8.4 GWh | May 2012 | Dec 2025 | Natural Gas |
| Kaiser Ontario | Bloom Energy 2009 PPA | Ontario, CA | California Independent System Operator (CISO) | 7.7 GWh | Sep 2012 | Dec 2025 | Natural Gas |
| RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 50.5 GWh | May 2013 | Dec 2025 | Solar |
| TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 57.9 GWh | Feb 2013 | Dec 2025 | Solar |
| North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 364.8 GWh | Nov 2012 | Dec 2025 | Wind |
| Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 4.4 GWh | Jan 2007 | Dec 2025 | Natural Gas |
| RE Victor Phelan Solar One LLC | MN8 Energy LLC | Adelanto, CA | California Independent System Operator (CISO) | 45.1 GWh | Nov 2013 | Dec 2025 | Solar |
| West Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 14.1 GWh | Apr 2013 | Dec 2025 | Solar |
| SEPV9 Power Plant | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 23.1 GWh | May 2013 | Dec 2025 | Solar |
| Tahquitz High School | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.5 GWh | Aug 2012 | Dec 2025 | Solar |
| Wagner Wind LLC | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 10.1 GWh | Nov 2012 | Dec 2025 | Wind |
| SEPV 8 | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 32.2 GWh | May 2013 | Dec 2025 | Solar |
| West Valley High School Solar | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2012 | Dec 2025 | Solar |
| Pierce College | Los Angeles Community College District | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 143.0 MWh | Dec 2012 | Dec 2025 | Solar |
| VA Sepulveda Ambulatory Care Center | VA Sepulveda Ambulatory Care Center | North Hills, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Sep 2014 | Dec 2025 | Solar |
| FAA NorCal TRACON | Enfinity NorCal 1 FAA LLC | Mather AFB, CA | Balancing Authority of Northern California (BANC) | 1.9 GWh | Nov 2012 | Dec 2025 | Solar |
| Venable Solar 1 | Madison Energy Investments LLC | Blythe, CA | California Independent System Operator (CISO) | 3.7 GWh | Mar 2015 | Dec 2025 | Solar |
| Xilinx San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2012 | Dec 2025 | Natural Gas |
| Life Technologies Carlsbad | Bloom Energy | Carlsbad, CA | California Independent System Operator (CISO) | 8.6 GWh | Jul 2012 | Dec 2025 | Natural Gas |
| Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 6.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 6.0 GWh | Jan 2014 | Dec 2025 | Solar |
| Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.3 GWh | Dec 2013 | Dec 2025 | Solar |
| Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.8 GWh | Dec 2013 | Dec 2025 | Solar |
| Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.0 GWh | Dec 2013 | Dec 2025 | Solar |
| G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.8 GWh | May 2013 | Dec 2025 | Landfill Gas |
| Radiance Solar 4 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2025 | Solar |
| Radiance Solar 5 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Jun 2013 | Dec 2025 | Solar |
| Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.9 GWh | Feb 2013 | Dec 2025 | Solar |
| Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.4 GWh | Feb 2013 | Dec 2025 | Solar |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2013 | Dec 2025 | Solar |
| White River Solar | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 36.1 GWh | Jun 2013 | Dec 2025 | Solar |
| Corcoran Solar | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 22.1 GWh | Jul 2013 | Dec 2025 | Solar |
| Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.1 GWh | May 2013 | Dec 2025 | Solar |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 10.6 GWh | Jun 2013 | Dec 2025 | Landfill Gas |
| Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 361.1 GWh | Dec 2013 | Dec 2025 | Wind |
| Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 250.6 GWh | Dec 2013 | Dec 2025 | Wind |
| Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 10.0 GWh | Apr 2013 | Dec 2025 | Landfill Gas |
| Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 24.1 GWh | Apr 2014 | Dec 2025 | Solar |
| Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 24.2 GWh | Nov 2014 | Dec 2025 | Solar |
| Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2025 | Solar |
| Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.9 GWh | May 2015 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |