Sandrini Solar 200
12902 B Copus Road, Mettler, CA 93313Plant Summary Information
Sandrini Solar 200 is ranked #44 out of 849 solar farms in California in terms of total annual net electricity generation.
Sandrini Solar 200 generated 112.0 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Sandrini Solar 200 |
|---|---|
| Utility Name | EDPR CA Solar Park LLC |
| Location | Kern County, CA |
| Initial Operation Date | December 2024 |
| Last Update | Sep 2025 |
| Annual Generation | 383.0 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,633 out of 12,539 Power Plants Nationwide | |
| Ranked #169 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #121 out of 1,600 California Power Plants | |
| Ranked #44 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Sandrini Solar 200
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sandrini Solar 200.
Monthly Net Generation for Sandrini Solar 200
Sandrini Solar 200 Details
| Summary Information | |
|---|---|
| Plant Name | Sandrini Solar 200 (65663) |
| Plant Address | 12902 B Copus Road, Mettler, CA 93313 |
| Utility | EDPR CA Solar Park LLC (64946) |
| Latitude, Longitude | 35.1026, -119.05412 |
| Generation Dates on File | Nov 2024 to Sep 2025 |
| Initial Operation Date | December 2024 |
| Annual Generation | 383.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG22-154 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator GEN01 Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 266.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Sandrini Solar 200 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #159 | 7V Solar Ranch | Muldoon, TX | 396.1 GWh |
| #160 | Yellow Pine II | Enterprise, NV | 378.9 GWh |
| #161 | TS Power Plant | Battle Mountain, NV | 1.6 TWh |
| #162 | Sherco Solar I | Clear Lake, MN | 392.9 GWh |
| #163 | Hardin Solar III | Alger, OH | 390.8 GWh |
| #164 | Buena Vista Energy Center | Chaparral, NM | 386.8 GWh |
| #165 | Castle Gap Solar Hybrid | McCarney, TX | 389.2 GWh |
| #166 | Matrix Pleasant Valley | Boise, ID | 389.6 GWh |
| #167 | Driver Solar | Osceola, AR | 386.6 GWh |
| #168 | Rambler | San Angelo, TX | 384.9 GWh |
| #170 | Prairie Wolf Solar LLC | Ashmore Township, IL | 382.8 GWh |
| #171 | Montague Solar | Arlington, OR | 381.9 GWh |
| #172 | Cavalry Solar Hybrid | Monon, IN | 371.6 GWh |
| #173 | Madison Fields Solar Project, LLC | Irwin, OH | 381.5 GWh |
| #174 | Big Elm Solar | Troy, TX | 380.7 GWh |
| #175 | RE Roserock | Fort Stockton, TX | 378.3 GWh |
| #176 | Corazon Energy LLC | Rachito Las Lomas, TX | 378.2 GWh |
| #177 | Raceway Solar & Storage | Lancaster, CA | 370.1 GWh |
| #178 | Indiana Crossroads Solar Park | Reynolds, IN | 375.7 GWh |
| #179 | Twiggs Solar | Dry Branch, GA | 375.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sandrini Solar 200.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ABEC #3 dba Lakeview Dairy | Bakersfield, CA | 6.0 GWh | 11.4 mi |
| ABEC #4 dba CE&S Dairy | Bakersfield, CA | 7.9 GWh | 6 mi |
| ABEC Bidart-Old River LLC | Bakersfield, CA | 16.3 GWh | 5.5 mi |
| Adobe Solar | Arvin, CA | 39.6 GWh | 5.6 mi |
| Algonquin SKIC 10 Solar, LLC | Taft, CA | 14.8 GWh | 10.8 mi |
| Algonquin SKIC20 Solar LLC | Taft, CA | 41.1 GWh | 10.8 mi |
| AVI Bakersfield | Bakersfield, CA | 3.2 GWh | 7.2 mi |
| Blue Skies Solar, LLC | Arvin, CA | 2.0 GWh | 11.4 mi |
| Cawelo Water District Solar | Famoso, CA | 6.7 GWh | 8.1 mi |
| IKEA Tejon 345 | Lebec, CA | 929.0 MWh | 10.7 mi |
| Kern Sunset 1886-WD | Bakersfield, CA | 270.0 MWh | 11.6 mi |
| Northern Orchard Solar PV, LLC | Taft, CA | 132.6 GWh | 12.8 mi |
| Orion Solar I | Arvin, CA | 28.3 GWh | 10.7 mi |
| Orion Solar II | Arvin, CA | 19.0 GWh | 10.6 mi |
| RE Old River One, LLC | Bakersfield, CA | 35.6 GWh | 8.6 mi |
| Sandrini Solar 100 | Mettler, CA | 217.7 GWh | 3.3 mi |
| Sunny Cow Solar, LLC | Bakersfield, CA | 5.5 GWh | 12 mi |
| Tejon Castac Water District Solar | Arvin, CA | 2.5 GWh | 11.3 mi |
| Vulcan San Emidio Solar | Bakersfield, CA | 3.8 GWh | 8.1 mi |
| Wheeler Ridge 2 | Arvin, CA | 913.0 MWh | 11.6 mi |