Summary of Electricity Activity in Fresno County, CA
Summary of Fresno County, CA Generation
Fresno County, CA is ranked #154 out of 2,153 U.S. counties nationwide and #8 out of 55 California counties in terms of total annual net electricity generation.
Annual Generation | 8.2 TWh |
---|---|
Annual Consumption | 41.1 M MMBtu |
Last Update | Mar 2025 |
Power Plants | 109 |
Companies on File | 62 |
Map of Top Producing Plants in Fresno County, CA
Register Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fresno County, CA.
Annual Net Generation From hydroelectric power
3.8 TWh
National Rank in Terms of hydroelectric Net Electricity Generation
#10 /546 U.S. Counties
State Rank in Terms of hydroelectric Net Electricity Generation
#3 /37 California Counties
Monthly Net Generation for Fresno County, CA
Net Generation by Fuel Source
Net Generation by Fuel Source Breakdown
State Rank | National Rank | Generation | Fuel Consumption | |
---|---|---|---|---|
All | #8 / 55 | #154 / 2153 | 8.17 TWh | 41.14 M MMBtu |
Water | #3 / 37 | #10 / 546 | 3.81 TWh | 14.25 M MMBtu |
Solar | #7 / 41 | #10 / 1207 | 2.91 TWh | 10.40 M MMBtu |
Natural Gas | #15 / 36 | #293 / 927 | 1.39 TWh | 14.86 M MMBtu |
Wood/Wood Waste Solids | #11 / 12 | #59 / 139 | 102.63 GWh | 1.63 M MMBtu |
Power Plants in Fresno County, CA
Plant | Utility Name | Generation | Consumption | Fuel Types |
---|---|---|---|---|
Panoche Energy Center | Panoche Energy Center, LLC | 1.2 TWh | 12.3 M MMBtu | Natural Gas |
Big Creek 3 | Southern California Edison Co | 586.5 GWh | 2.2 M MMBtu | Water |
Great Valley Solar Portfolio Holdings, L | Consolidated Edison Development Inc. | 542.2 GWh | 2.0 M MMBtu | Solar |
RE Tranquillity | Southern Power Co | 491.4 GWh | 1.8 M MMBtu | Solar |
Pine Flat | Kings River Conservation Dist | 448.7 GWh | 1.5 M MMBtu | Water |
Balch 2 | Pacific Gas & Electric Co. | 443.4 GWh | 1.6 M MMBtu | Water |
Haas | Pacific Gas & Electric Co. | 430.0 GWh | 1.5 M MMBtu | Water |
Kerckhoff 2 | Pacific Gas & Electric Co. | 415.7 GWh | 1.6 M MMBtu | Water |
Big Creek 1 | Southern California Edison Co | 405.3 GWh | 1.4 M MMBtu | Water |
Scarlet Solar (CA) | EDP Renewables North America LLC | 364.8 GWh | 1.3 M MMBtu | Solar |
Big Creek 2 | Southern California Edison Co | 355.2 GWh | 1.3 M MMBtu | Water |
Big Creek 2A | Southern California Edison Co | 325.9 GWh | 1.2 M MMBtu | Water |
Fifth Standard Solar PV, LLC (Hybrid) | Big Sky Wind, LLC | 318.8 GWh | 1.2 M MMBtu | Solar |
Big Creek 8 | Southern California Edison Co | 173.8 GWh | 644.3 k MMBtu | Water |
Balch 1 | Pacific Gas & Electric Co. | 138.8 GWh | 516.0 k MMBtu | Water |
North Star Solar | Southern Power Co | 132.4 GWh | 470.8 k MMBtu | Solar |
Little Bear 5 | Little Bear Solar 5, LLC (Longroad) | 120.7 GWh | 437.2 k MMBtu | Solar |
Rio Bravo Fresno | Rio Bravo Fresno | 108.4 GWh | 1.7 M MMBtu | Wood/Wood Waste Solids : 94.7% Natural Gas : 5.3% |
Kings River PH | Pacific Gas & Electric Co. | 106.9 GWh | 409.2 k MMBtu | Water |
Five Points Solar Park | Boralex US Operations LLC | 102.0 GWh | 367.6 k MMBtu | Solar |
Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | 87.2 GWh | 312.6 k MMBtu | Solar |
Scarlet II Hybrid | EDPR Scarlet II LLC | 80.8 GWh | 290.1 k MMBtu | Solar |
Friant Hydro Facility | Friant Power Authority | 59.8 GWh | 213.9 k MMBtu | Water |
Little Bear 4 | Little Bear Solar 4, LLC (Longroad) | 48.4 GWh | 177.8 k MMBtu | Solar |
Whitney Point Solar | Whitney Point Solar, LLC | 44.4 GWh | 157.7 k MMBtu | Solar |
Coalinga 25D Cogen | Chevron USA Inc | 42.3 GWh | 744.7 k MMBtu | Natural Gas |
NextEra Westside PV | Westside Solar, LLC | 40.6 GWh | 145.4 k MMBtu | Solar |
RE Adams East, LLC | Onward Energy | 39.3 GWh | 138.7 k MMBtu | Solar |
Westlands Solar PV Farm | Boralex US Operations LLC | 37.8 GWh | 134.6 k MMBtu | Solar |
Coalinga Cogeneration Facility | Aera Energy LLC-Coalinga | 35.9 GWh | 607.1 k MMBtu | Natural Gas |
Gates Solar Station | Pacific Gas & Electric Co. | 31.7 GWh | 114.9 k MMBtu | Solar |
Cantua Solar Station | Pacific Gas & Electric Co. | 31.2 GWh | 113.7 k MMBtu | Solar |
Huron Solar Station | Pacific Gas & Electric Co. | 28.8 GWh | 104.9 k MMBtu | Solar |
Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | 26.2 GWh | 96.6 k MMBtu | Solar |
Saint Agnes Medical Center | Saint Agnes Medical Center | 26.2 GWh | 495.5 k MMBtu | Natural Gas |
Oro Loma | Consolidated Edison Development Inc. | 25.5 GWh | 90.6 k MMBtu | Solar |
Stroud Solar Station | Pacific Gas & Electric Co. | 25.0 GWh | 95.4 k MMBtu | Solar |
San Joaquin Solar | GASNA 6P, LLC | 24.5 GWh | 88.2 k MMBtu | Solar |
Aspiration G | AES Distributed Energy | 21.3 GWh | 73.0 k MMBtu | Solar |
Giffen Solar Park | Giffen Solar Park, LLC | 19.3 GWh | 66.8 k MMBtu | Solar |
West Gates Solar Station | Pacific Gas & Electric Co. | 19.2 GWh | 69.6 k MMBtu | Solar |
Portal | Southern California Edison Co | 18.7 GWh | 64.1 k MMBtu | Water |
Five Points Solar Station | Pacific Gas & Electric Co. | 15.4 GWh | 54.4 k MMBtu | Solar |
Fresno Community Solar | Fresno Community Solar Developers, LLC | 15.4 GWh | 52.4 k MMBtu | Solar |
Malaga Power LLC | CalPeak Power, LLC | 14.1 GWh | 148.4 k MMBtu | Natural Gas |
Westside Solar Station | Pacific Gas & Electric Co. | 13.9 GWh | 50.2 k MMBtu | Solar |
Giffen | Pacific Gas & Electric Co. | 13.6 GWh | 46.6 k MMBtu | Solar |
Kingsburg Cogen | KES Kingsburg LP | 11.0 GWh | 115.4 k MMBtu | Natural Gas |
CalPeak Power Panoche Peaker Plant | CalPeak Power, LLC | 10.5 GWh | 148.5 k MMBtu | Natural Gas |
Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | 10.1 GWh | 36.1 k MMBtu | Solar |
Algonquin Power Sanger LLC | Algonquin Power Sanger LLC | 10.0 GWh | 89.7 k MMBtu | Natural Gas |
J S Eastwood | Southern California Edison Co | 7.3 GWh | 0 MMBtu | Water |
Gap Pacific Distribution Center | MN8 Energy LLC | 5.4 GWh | 19.2 k MMBtu | Solar |
POM Plant 1 | Wonderful Renewable Energy, LLC. | 5.2 GWh | 18.4 k MMBtu | Solar |
National Raisin | National Raisin | 4.8 GWh | 17.0 k MMBtu | Solar |
Fresno Solar | Wellhead Services, Inc | 4.7 GWh | 16.7 k MMBtu | Solar |
DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | 4.6 GWh | 16.5 k MMBtu | Solar |
POM Beverage Solar | Wonderful Renewable Energy, LLC. | 4.5 GWh | 16.0 k MMBtu | Solar |
CA-DGS RFP-Pleasant Valley State Prison | Forefront Power, LLC | 4.0 GWh | 13.6 k MMBtu | Solar |
Reedley Community College Solar | Forefront Power, LLC | 4.0 GWh | 14.1 k MMBtu | Solar |
Citizen B | AES Distributed Energy | 3.8 GWh | 14.6 k MMBtu | Solar |
SCCCD - Fresno Community College | Forefront Power, LLC | 3.8 GWh | 13.5 k MMBtu | Solar |
Van der Kooi Dairy Solar Array | Maas Energy Works | 3.7 GWh | 13.1 k MMBtu | Solar |
OK Produce Fresno Carport | OK Produce | 3.6 GWh | 12.5 k MMBtu | Solar |
POM Plant 2 | Wonderful Renewable Energy, LLC. | 3.5 GWh | 12.4 k MMBtu | Solar |
Wellhead Power Panoche | Wellhead Services, Inc | 3.3 GWh | 54.2 k MMBtu | Natural Gas |
POM Juice Solar | Wonderful Renewable Energy, LLC. | 3.2 GWh | 11.5 k MMBtu | Solar |
Harris Farms Solar Facility | Harris Farms Inc | 3.0 GWh | 10.1 k MMBtu | Solar |
CDCR (CA) - Pleasant Valley State Prison | Team-Solar, Inc. | 2.8 GWh | 10.1 k MMBtu | Solar |
Zonneveld Oak Grove | Renewable Solar, Inc | 2.8 GWh | 9.5 k MMBtu | Solar |
Tranquillity ID | Tranquillity Solar 1, LLC | 2.8 GWh | 9.9 k MMBtu | Solar |
Moonlight Packing - Phase 2 | CalCom Energy | 2.6 GWh | 9.3 k MMBtu | Solar |
Fresno Sunnyside High School Hybrid | Forefront Power, LLC | 2.5 GWh | 9.0 k MMBtu | Solar |
Fresno Cogen Partners | Wellhead Services, Inc | 2.4 GWh | 44.8 k MMBtu | Natural Gas |
Fresno Bullard High School Hybrid | Forefront Power, LLC | 2.2 GWh | 7.7 k MMBtu | Solar |
Open Sky Dairy | Renewable Solar, Inc | 2.1 GWh | 7.2 k MMBtu | Solar |
Fresno Hoover High School Hybrid | Forefront Power, LLC | 2.1 GWh | 7.4 k MMBtu | Solar : 99.3% Electricity used for energy storage : 0.7% |
SCCCD - Clovis Community College | Forefront Power, LLC | 2.0 GWh | 7.1 k MMBtu | Solar |
Firebaugh-CCS-PV-1 | Mike Woolf Farming | 1.9 GWh | 6.7 k MMBtu | Solar |
Open Sky Ranch Inc | Bravo REC Management LLC | 1.9 GWh | 6.4 k MMBtu | Solar |
2081 Terzian Solar Project | Solarenewal LLC | 1.8 GWh | 6.6 k MMBtu | Solar |
Clovis East High School | Tesla Inc. | 1.5 GWh | 5.2 k MMBtu | Solar |
Clovis North High School | Tesla Inc. | 1.5 GWh | 5.2 k MMBtu | Solar |
CSU Fresno Solar Project | MMA Fresno Power LP | 1.4 GWh | 5.1 k MMBtu | Solar |
La Joya Del Sol | CVI CleanCapital Solar 1 LLC | 1.4 GWh | 4.7 k MMBtu | Solar |
CalRenew-1 | CalRenew-1 LLC | 1.3 GWh | 5.6 k MMBtu | Solar |
Clovis High School | Tesla Inc. | 826.0 MWh | 3.0 k MMBtu | Solar |
CA - Fresno County - Juvenile Hall | Forefront Power, LLC | 552.0 MWh | 2.0 k MMBtu | Solar |
JD Foods - JD Foods | Barrier Solar Inc | 455.0 MWh | 1.6 k MMBtu | Solar |
Kings River Syphon | Orange Cove Irrigation District | 325.0 MWh | 1.6 k MMBtu | Water |
Vitro Flat Glass LLC | Vitro Flat Glass LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Acid BESS | Malaga BESS LLC | -196.0 MWh | 0 MMBtu | No Information Available |
Helms Pumped Storage | Pacific Gas & Electric Co. | -107.1 GWh | 0 MMBtu | No Information Available |
Coalinga 6C Cogen | Chevron USA Inc | 0.0 Wh | 0 MMBtu | No Information Available |
Coalinga Cogeneration | Coalinga Cogeneration Co | 0.0 Wh | 0 MMBtu | No Information Available |
Conflitti Solar | CES Electron Farm One, LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Covanta Mendota | Clean Energy Systems Mendota | 0.0 Wh | 0 MMBtu | No Information Available |
EDPR CA Solar Park VI LLC (CA) Hybrid | EDPR CA Solar Park VI LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Energy Nuevo Storage Farm | Energy Nuevo Storage Farm | 0.0 Wh | 0 MMBtu | No Information Available |
Gates Peaker | Wellhead Services, Inc | 0.0 Wh | 0 MMBtu | No Information Available |
Helms Energy Center | Wellhead Services, Inc | 0.0 Wh | 0 MMBtu | No Information Available |
Kerckhoff | Pacific Gas & Electric Co. | 0.0 Wh | 0 MMBtu | No Information Available |
Key Energy Storage | Key Energy Storage LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Little Bear Solar 2, LLC | First Solar Project Development | 0.0 Wh | 0 MMBtu | No Information Available |
Luna Valley | Luna Valley Solar I, LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Midway Peaking LLC | CalPeak Power, LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Sand Luis West | OE_SLW, LLC | 0.0 Wh | 0 MMBtu | No Information Available |
Superior Almond Hulling | Renewable Solar, Inc | 0.0 Wh | 0 MMBtu | No Information Available |
Van der Hoek Solar Array/ Dairy | Maas Energy Works | 0.0 Wh | 0 MMBtu | No Information Available |
Electricity Generation for Neighboring Counties
National Rank | County | Net Generation | # Power Plants |
---|---|---|---|
#318 | Kings County | 4.0 TWh | 57 |
#701 | Madera County | 971.4 GWh | 28 |
#1151 | Mariposa County | 299.7 GWh | 2 |
#1057 | Merced County | 395.5 GWh | 30 |
#775 | Mono County | 785.9 GWh | 9 |
#347 | Monterey County | 3.7 TWh | 29 |
#1135 | San Benito County | 324.4 GWh | 6 |
#435 | Stanislaus County | 2.6 TWh | 25 |
#708 | Tulare County | 951.9 GWh | 68 |
#402 | Tuolumne County | 3.0 TWh | 23 |
* Net Generation data is based on the last 12 months since Mar 2025
Electricity Generation for Cities Located in Fresno County, CA
State Rank | City | Net Generation | # Power Plants |
---|---|---|---|
#31 | Auberry, CA | 1.9 TWh | 6 |
#91 | Big Creek, CA | 424.0 GWh | 3 |
#49 | Cantua Creek, CA | 1.2 TWh | 8 |
#400 | Clovis, CA | 2.3 GWh | 2 |
#176 | Coalinga, CA | 92.6 GWh | 8 |
#297 | Del Rey, CA | 13.3 GWh | 3 |
#45 | Firebaugh, CA | 1.3 TWh | 8 |
#373 | Fowler, CA | 4.8 GWh | 1 |
#75 | Fresno, CA | 598.0 GWh | 22 |
#200 | Friant, CA | 59.8 GWh | 1 |
#89 | Huron, CA | 436.3 GWh | 8 |
#283 | Kingsburg, CA | 17.1 GWh | 2 |
#393 | Laton, CA | 2.8 GWh | 1 |
#93 | Mendota, CA | 420.0 GWh | 11 |
#86 | Minkler, CA | 448.7 GWh | 1 |
#320 | Reedley, CA | 9.0 GWh | 5 |
#337 | Riverdale, CA | 7.6 GWh | 3 |
#190 | San Joaquin, CA | 68.7 GWh | 7 |
#314 | Sanger, CA | 10.3 GWh | 2 |
#171 | Squaw Valley, CA | 106.9 GWh | 1 |
#394 | Tranquillity, CA | 2.8 GWh | 1 |
#132 | Westside, CA | 216.3 GWh | 6 |
* Net Generation data is based on the last 12 months since Mar 2025