Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Enerparc CA1 LLC | CleanCapital Holdings | Hollister, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2014 | Dec 2025 | Solar |
| CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.3 GWh | Jul 2013 | Dec 2025 | Solar |
| CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2013 | Dec 2025 | Solar |
| EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2025 | Solar |
| EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2025 | Solar |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2011 | Dec 2025 | Solar |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.6 GWh | Apr 2011 | Dec 2025 | Solar |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.8 GWh | Jul 2016 | Dec 2025 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2025 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2014 | Dec 2025 | Solar |
| Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.0 GWh | Jul 2014 | Dec 2025 | Solar |
| CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 40.7 GWh | Nov 2014 | Dec 2025 | Solar |
| Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 2014 | Dec 2025 | Solar |
| Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 4.2 GWh | Jun 2014 | Dec 2025 | Solar |
| Rising Tree Wind Farm II | Rising Tree Wind Farm II LLC | Mojave, CA | California Independent System Operator (CISO) | 53.7 GWh | Dec 2014 | Dec 2025 | Wind |
| Rising Tree Wind Farm III | Rising Tree Wind Farm III LLC | Mojave, CA | California Independent System Operator (CISO) | 260.1 GWh | May 2015 | Dec 2025 | Wind |
| Lone Valley Solar Park II LLC | Lone Valley Solar Park II LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 53.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Rio Bravo Solar 1 LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 52.1 GWh | Nov 2016 | Dec 2025 | Solar |
| Rio Bravo Solar II LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 51.7 GWh | Nov 2016 | Dec 2025 | Solar |
| Wildwood Solar II | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 38.7 GWh | Dec 2016 | Dec 2025 | Solar |
| Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Mission Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2014 | Dec 2025 | Solar |
| Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Victor Mesa Linda B2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Victor Mesa Linda C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Victor Mesa Linda D2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Victor Mesa Linda E2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| SEPV Palmdale East | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 24.2 GWh | Jul 2015 | Dec 2025 | Solar |
| Life Technologies - Pleasanton | Bloom Energy | Pleasanton, CA | California Independent System Operator (CISO) | 8.3 GWh | Feb 2013 | Dec 2025 | Natural Gas |
| Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.5 GWh | Aug 2013 | Dec 2025 | Natural Gas |
| California PV Energy at ISD WWTP | California PV Energy LLC | Oakley, CA | California Independent System Operator (CISO) | 1.9 GWh | Jul 2014 | Dec 2025 | Solar |
| Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 21.8 GWh | Apr 2017 | Dec 2025 | Landfill Gas |
| Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 5.2 GWh | Jul 2014 | Dec 2025 | Solar |
| Pumpjack Solar I | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 50.6 GWh | Dec 2014 | Dec 2025 | Solar |
| Sacramento (SMUD) | Terraform Arcadia | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Jul 2014 | Dec 2025 | Solar |
| City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.2 GWh | Oct 2014 | Dec 2025 | Wind |
| Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2025 | Wind |
| Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 55.4 GWh | Jul 2015 | Dec 2025 | Solar |
| Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 242.5 GWh | Oct 2015 | Dec 2025 | Solar |
| SCE-Snowline-Duncan Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.0 GWh | Sep 2014 | Dec 2025 | Solar |
| SCE-Snowline-Duncan Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2014 | Dec 2025 | Solar |
| Wildwood Solar I, LLC | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 48.3 GWh | Jan 2015 | Dec 2025 | Solar |
| City of Tulare Water Facility | City of Tulare Water Pollution Control - (CA) | Tulare, CA | California Independent System Operator (CISO) | 16.3 GWh | Dec 1990 | Dec 2025 | Natural Gas : 61.0% Other Biomass Gas : 20.1% Solar : 19.0% |
| Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 2014 | Dec 2025 | Solar |
| Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 41.2 GWh | Apr 2015 | Dec 2025 | Solar |
| Madelyn Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Rudy Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Mitchell Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 4.4 GWh | Nov 2014 | Dec 2025 | Solar |
| Algonquin SKIC20 Solar LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 40.5 GWh | Apr 2015 | Dec 2025 | Solar |
| Corcoran Solar 2 | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 46.8 GWh | Apr 2015 | Dec 2025 | Solar |
| Atwell Island West Solar | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 51.9 GWh | Apr 2015 | Dec 2025 | Solar |
| Anaheim Solar Energy Plant | Anaheim Public Utilities | Anaheim, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2014 | Dec 2025 | Solar |
| SCE-Snowline-White Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2025 | Solar |
| SCE-Snowline-White Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.7 GWh | Oct 2014 | Dec 2025 | Solar |
| SCE-Snowline-White Rd (Central) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.8 GWh | Oct 2014 | Dec 2025 | Solar |
| Baker Creek Hydroelectric | Baker Station Associates, LP | Bridgeville, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2025 | Water |
| Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.2 GWh | Oct 2015 | Dec 2025 | Solar |
| Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 18.0 GWh | Jun 2015 | Dec 2025 | Solar |
| Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 59.3 GWh | Aug 2015 | Dec 2025 | Solar |
| TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 48.3 GWh | Oct 2014 | Dec 2025 | Solar |
| Bowerman Power LFG, LLC | Bowerman Power LFG, LLC | Irvine, CA | California Independent System Operator (CISO) | 151.4 GWh | Mar 2016 | Dec 2025 | Landfill Gas |
| Alamo Solar | Onward Energy | Oro Grande, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2015 | Dec 2025 | Solar |
| Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 16.2 GWh | May 2017 | Dec 2025 | Solar |
| Giffen Solar Park | Giffen Solar Park, LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 19.6 GWh | May 2017 | Dec 2025 | Solar |
| Five Points Solar Park | Boralex US Operations LLC | Five Points, CA | California Independent System Operator (CISO) | 80.7 GWh | Aug 2016 | Dec 2025 | Solar |
| Blackwell Solar Park | RWE Clean Energy | Lost Hills, CA | California Independent System Operator (CISO) | 39.0 GWh | Dec 2018 | Dec 2025 | Solar |
| Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 52.7 GWh | Dec 2015 | Dec 2025 | Solar |
| Springbok Solar Farm 1 | 62SK 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 280.4 GWh | Jun 2016 | Dec 2025 | Solar |
| Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Dec 2014 | Dec 2025 | Solar |
| Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Dec 2014 | Dec 2025 | Solar |
| Park Meridian #1 | Altus Power America Management, LLC | Riverside, CA | California Independent System Operator (CISO) | 2.6 GWh | Feb 2015 | Dec 2025 | Solar |
| Rancho Cucamonga Dist #1 | Altus Power America Management, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2015 | Dec 2025 | Solar |
| Terra Francesco | Altus Power America Management, LLC | Ontario, CA | California Independent System Operator (CISO) | 2.2 GWh | Feb 2015 | Dec 2025 | Solar |
| Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 49.3 GWh | Feb 2015 | Dec 2025 | Solar |
| Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 31.3 GWh | May 2017 | Dec 2025 | Landfill Gas |
| Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 4.1 GWh | May 2015 | Dec 2025 | Solar |
| Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 789.0 MWh | Mar 2015 | Dec 2025 | Solar |
| Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 32.4 GWh | Aug 2016 | Dec 2025 | Solar |
| Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 46.3 GWh | Aug 2016 | Dec 2025 | Solar |
| Maricopa West Solar PV, LLC | Onward Energy | Taft, CA | California Independent System Operator (CISO) | 50.3 GWh | Nov 2015 | Dec 2025 | Solar |
| AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 45.7 GWh | Jul 2015 | Dec 2025 | Solar |
| Kettleman Solar -Centaurus | Boralex US Operations LLC | Kettleman City, CA | California Independent System Operator (CISO) | 42.9 GWh | Jun 2015 | Dec 2025 | Solar |
| Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 35.4 GWh | Apr 2015 | Dec 2025 | Solar |
| Imperial Valley Solar Co (IVSC) 2, LLC | Onward Energy | Niland, CA | Imperial Irrigation District (IID) | 43.9 GWh | May 2015 | Dec 2025 | Solar |
| SPI Anderson 2 | Sierra Pacific Industries | Anderson, CA | California Independent System Operator (CISO) | 122.1 GWh | Jul 2015 | Dec 2025 | Wood/Wood Waste Solids : 99.3% Natural Gas : 0.7% |
| Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 2.8 GWh | Apr 2015 | Dec 2025 | Solar |
| Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.1 GWh | Apr 2016 | Dec 2025 | Solar |
| Seville 1 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 53.3 GWh | Nov 2015 | Dec 2025 | Solar |
| Seville 2 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 78.3 GWh | Nov 2015 | Dec 2025 | Solar |
| SEPV 18 | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 4.3 GWh | Dec 2015 | Dec 2025 | Solar |
| Aspiration G | AES Distributed Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 21.1 GWh | Aug 2017 | Dec 2025 | Solar |
| Citizen B | AES Distributed Energy | Mendota, CA | California Independent System Operator (CISO) | 8.6 GWh | Nov 2015 | Dec 2025 | Solar |
| Lancaster WAD B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.2 GWh | Mar 2017 | Dec 2025 | Solar |
| SEPV Mojave West | AES Distributed Energy | Mojave, CA | California Independent System Operator (CISO) | 52.7 GWh | May 2016 | Dec 2025 | Solar |
| DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2014 | Dec 2025 | Solar |
| CDCR (CA) - Pleasant Valley State Prison | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 2.9 GWh | Jun 2014 | Dec 2025 | Solar |
| Maxim | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.9 GWh | Jul 2014 | Dec 2025 | Natural Gas |
| Pixar - Emeryville | Bloom Energy | Emeryville, CA | California Independent System Operator (CISO) | 7.0 GWh | Dec 2013 | Dec 2025 | Natural Gas |
| Springbok Solar Farm 2 | 63SU 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 397.1 GWh | Aug 2016 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |