Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| City of Hayward WWTP | City of Hayward (CA) | Hayward, CA | California Independent System Operator (CISO) | 10.5 GWh | Oct 2010 | Dec 2025 | Other Biomass Gas : 72.3% Solar : 23.6% Natural Gas : 4.1% |
| Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 1.5 GWh | Nov 2011 | Dec 2025 | Solar |
| Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 516.8 GWh | Oct 2013 | Dec 2025 | Solar |
| Community Solar 1 | Solar Community I LLC | Brawley, CA | Imperial Irrigation District (IID) | 15.1 GWh | May 2014 | Dec 2025 | Solar |
| Sonora 1 | CleanCapital Holdings | Jamestown, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2013 | Dec 2025 | Solar |
| Oltmans SCE at Champagne | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2013 | Dec 2025 | Solar |
| Oltmans SCE at Jurupa | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 2.4 GWh | Nov 2013 | Dec 2025 | Solar |
| Sierra Nevada Brewing Co Hybrid | Sierra Nevada Brewing Co | Chico, CA | California Independent System Operator (CISO) | 10.7 GWh | Apr 2005 | Dec 2025 | Natural Gas : 65.7% Solar : 19.5% Other Biomass Gas : 14.9% |
| Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 51.4 GWh | Dec 2013 | Dec 2025 | Solar |
| Solar Gen 2 Solar Facility | Southern Power Co | Calipatria, CA | California Independent System Operator (CISO) | 376.7 GWh | Oct 2014 | Dec 2025 | Solar |
| One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2003 | Dec 2025 | Natural Gas |
| Industry Solar Power Generation Station | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Navajo Solar Power Generation Station 1 | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Powhatan Solar Power Generation Station | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2025 | Solar |
| Otoe Solar Power Generation Station 1 LL | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Westlands Solar PV Farm | Boralex US Operations LLC | Huron, CA | California Independent System Operator (CISO) | 39.1 GWh | Jan 2014 | Dec 2025 | Solar |
| Transamerica Pyramid | Transamerica Pyramid Properties LLC | San Francisco, CA | California Independent System Operator (CISO) | 4.0 MWh | Jun 2007 | Dec 2025 | Natural Gas |
| Sol Orchard El Centro PV | Sol Orchard Imperial 1, LLC | El Centro, CA | Imperial Irrigation District (IID) | 45.1 GWh | Sep 2013 | Dec 2025 | Solar |
| Western Antelope Blue Sky Ranch A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 43.0 GWh | Oct 2014 | Dec 2025 | Solar |
| Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 26.2 GWh | Nov 2016 | Dec 2025 | Solar |
| Monterey Regional Water Pollution Contro | Tesla Inc. | Marina, CA | California Independent System Operator (CISO) | 1.1 GWh | Nov 2010 | Dec 2025 | Solar |
| Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2011 | Dec 2025 | Solar |
| Sacramento Fairbain Water Treatment Plan | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.2 GWh | Jan 2013 | Dec 2025 | Solar |
| Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 5.4 GWh | Dec 2013 | Dec 2025 | Solar |
| Stateline Solar | Southern Power Co | Nipton, CA | California Independent System Operator (CISO) | 640.1 GWh | Nov 2015 | Dec 2025 | Solar |
| Mira Loma | Costco Wholesale | Mira Loma, CA | California Independent System Operator (CISO) | 2.2 GWh | Oct 2011 | Dec 2025 | Solar |
| ABEC Bidart-Old River LLC | ABEC Bidart-Old River LLC | Bakersfield, CA | California Independent System Operator (CISO) | 15.6 GWh | Nov 2013 | Dec 2025 | Other Biomass Gas |
| Lost Hills/Blackwell | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 58.9 GWh | Mar 2015 | Dec 2025 | Solar |
| North Star Solar | Southern Power Co | Mendota, CA | California Independent System Operator (CISO) | 133.2 GWh | May 2015 | Dec 2025 | Solar |
| Orion Solar I | Orion Solar I LLC | Arvin, CA | California Independent System Operator (CISO) | 27.4 GWh | Mar 2014 | Dec 2025 | Solar |
| Orion Solar II | Orion Solar II, LLC | Arvin, CA | California Independent System Operator (CISO) | 16.0 GWh | May 2014 | Dec 2025 | Solar |
| North Bay Solar 1 | AES Distributed Energy | Fairfield, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2013 | Dec 2025 | Solar |
| Lancaster Dry Farm Ranch B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 10.0 GWh | Oct 2014 | Dec 2025 | Solar |
| Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.6 GWh | Apr 2014 | Dec 2025 | Solar |
| Rodeo Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | Apr 2014 | Dec 2025 | Solar |
| Summer Solar A2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2014 | Dec 2025 | Solar |
| Summer Solar B2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.1 GWh | May 2014 | Dec 2025 | Solar |
| Summer Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | May 2014 | Dec 2025 | Solar |
| Summer Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.0 GWh | Jun 2014 | Dec 2025 | Solar |
| Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 13.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Expressway Solar A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.8 GWh | Apr 2014 | Dec 2025 | Solar |
| Expressway Solar B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2014 | Dec 2025 | Solar |
| Expressway Solar C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.0 GWh | Oct 2014 | Dec 2025 | Solar |
| Shasta Solar Farm | Ignite Solar Holdings LLC | Fall River Mills, CA | California Independent System Operator (CISO) | 5.8 GWh | Feb 2014 | Dec 2025 | Solar |
| Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 34.4 GWh | Sep 2015 | Dec 2025 | Solar |
| ASTI | SunStrong Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2009 | Dec 2025 | Solar |
| Beringer | SunStrong Management, LLC | Saint Helena, CA | California Independent System Operator (CISO) | 1.6 GWh | Dec 2008 | Dec 2025 | Solar |
| Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2025 | Solar |
| Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 8.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.0 GWh | Nov 2013 | Dec 2025 | Solar |
| Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2013 | Dec 2025 | Solar |
| Santa Fe Springs Rooftop Solar BLDG M | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.6 GWh | Feb 2015 | Dec 2025 | Solar |
| Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.4 GWh | Feb 2015 | Dec 2025 | Solar |
| Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2014 | Dec 2025 | Solar |
| Intel Folsom Phase 2 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Sep 2012 | Dec 2025 | Solar |
| Laguna Water Reclamation Facility | City of Santa Rosa - (CA) | Santa Rosa, CA | California Independent System Operator (CISO) | 9.4 GWh | Feb 2013 | Dec 2025 | Other Biomass Gas : 83.6% Natural Gas : 16.4% |
| Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2014 | Dec 2025 | Solar |
| White River Solar 2 | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 49.2 GWh | Aug 2014 | Dec 2025 | Solar |
| Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 170.4 GWh | Jul 2016 | Dec 2025 | Solar |
| RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 121.0 GWh | Nov 2014 | Dec 2025 | Solar |
| RE Adams East, LLC | Onward Energy | Fresno, CA | California Independent System Operator (CISO) | 40.7 GWh | Nov 2014 | Dec 2025 | Solar |
| RE Kansas Solar, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 24.0 GWh | Nov 2014 | Dec 2025 | Solar |
| RE Old River One, LLC | Onward Energy | Bakersfield, CA | California Independent System Operator (CISO) | 37.5 GWh | Nov 2014 | Dec 2025 | Solar |
| RE Columbia Two, LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 41.5 GWh | Nov 2014 | Dec 2025 | Solar |
| RE Kent South, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 35.7 GWh | Nov 2014 | Dec 2025 | Solar |
| Woodmere Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 28.6 GWh | Nov 2015 | Dec 2025 | Solar |
| Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 47.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Cottonwood Solar, LLC (Goose Lake) | Onward Energy | Lost Hills, CA | California Independent System Operator (CISO) | 29.9 GWh | Apr 2015 | Dec 2025 | Solar |
| Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 20.6 GWh | Apr 2015 | Dec 2025 | Solar |
| Calipatria Solar Farm | Southern Power Co | Calipatria, CA | Imperial Irrigation District (IID) | 36.1 GWh | Jan 2016 | Dec 2025 | Solar |
| Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2025 | Solar |
| Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2014 | Dec 2025 | Solar |
| Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2014 | Dec 2025 | Solar |
| Enerparc CA1 LLC | CleanCapital Holdings | Hollister, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2014 | Dec 2025 | Solar |
| CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.3 GWh | Jul 2013 | Dec 2025 | Solar |
| CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2013 | Dec 2025 | Solar |
| EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2025 | Solar |
| EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2025 | Solar |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2011 | Dec 2025 | Solar |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.6 GWh | Apr 2011 | Dec 2025 | Solar |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.8 GWh | Jul 2016 | Dec 2025 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2025 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2014 | Dec 2025 | Solar |
| Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.0 GWh | Jul 2014 | Dec 2025 | Solar |
| CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 40.7 GWh | Nov 2014 | Dec 2025 | Solar |
| Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 2014 | Dec 2025 | Solar |
| Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 4.2 GWh | Jun 2014 | Dec 2025 | Solar |
| Rising Tree Wind Farm II | Rising Tree Wind Farm II LLC | Mojave, CA | California Independent System Operator (CISO) | 53.7 GWh | Dec 2014 | Dec 2025 | Wind |
| Rising Tree Wind Farm III | Rising Tree Wind Farm III LLC | Mojave, CA | California Independent System Operator (CISO) | 260.1 GWh | May 2015 | Dec 2025 | Wind |
| Lone Valley Solar Park II LLC | Lone Valley Solar Park II LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 53.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Rio Bravo Solar 1 LLC | Deriva Energy | McKittrick, CA | California Independent System Operator (CISO) | 52.1 GWh | Nov 2016 | Dec 2025 | Solar |
| Rio Bravo Solar II LLC | Deriva Energy | McKittrick, CA | California Independent System Operator (CISO) | 51.7 GWh | Nov 2016 | Dec 2025 | Solar |
| Wildwood Solar II | Deriva Energy | Wasco, CA | California Independent System Operator (CISO) | 38.7 GWh | Dec 2016 | Dec 2025 | Solar |
| Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Mission Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2014 | Dec 2025 | Solar |
| Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Victor Mesa Linda B2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Victor Mesa Linda C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Victor Mesa Linda D2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.4 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 80.0 GWh |
| San Mateo County, CA | # 46 | 11 | 131.1 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 253.0 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 296.3 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 440.4 GWh |
| Merced County, CA | # 38 | 33 | 490.0 GWh |
| Trinity County, CA | # 37 | 5 | 499.2 GWh |
| Calaveras County, CA | # 36 | 6 | 503.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 605.0 GWh |
| Ventura County, CA | # 33 | 33 | 687.9 GWh |
| Lake County, CA | # 32 | 10 | 896.4 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.5 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.6 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.0 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 52 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.1 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 6.9 TWh |
| Fresno County, CA | # 8 | 128 | 7.4 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.6 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.4 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Los Angeles County, CA | # 3 | 325 | 16.7 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 333 | 34.3 TWh |