Maverick Solar 6, LLC
29722 Corn Springs Road, Desert Center, CA 92239Plant Summary Information
Maverick Solar 6, LLC is ranked #90 out of 917 solar farms in California in terms of total annual net electricity generation.
Maverick Solar 6, LLC generated 76.5 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Maverick Solar 6, LLC |
|---|---|
| Utility Name | Maverick Solar 6, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | November 2021 |
| Last Update | Aug 2026 |
| Annual Generation | 227.9 GWh |
| Annual Consumption | 893.7 k MMBtu |
| Ranked #2,427 out of 13,301 Power Plants Nationwide | |
| Ranked #434 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #239 out of 1,641 California Power Plants | |
| Ranked #90 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Maverick Solar 6, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Maverick Solar 6, LLC.
Monthly Net Generation for Maverick Solar 6, LLC
Monthly Plant Fuel Consumption for Maverick Solar 6, LLC
Maverick Solar 6, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Maverick Solar 6, LLC (64105) |
| Plant Address | 29722 Corn Springs Road, Desert Center, CA 92239 |
| Utility | Maverick Solar 6, LLC (63733) |
| Latitude, Longitude | 33.7, -115.38 |
| Generation Dates on File | Jul 2021 to Aug 2026 |
| Initial Operation Date | November 2021 |
| Annual Generation | 227.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator MAV03 Details Operating November 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 131 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator MAV04 Details Operating June 2022
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 200 |
|---|---|
| Maximum Charge Rate | 50 MW |
| Maximum Discharge Rate | 50 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 16.5 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| System Peak Shaving | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 64105 |
| Direct Support Gen Id | MAV03 |
| Support T D Asset | No |
Maverick Solar 6, LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #424 | Franklin Solar Hybrid | Twin Falls, ID | 241.5 GWh |
| #425 | Chesapeake Solar Project | Chesapeake, VA | 241.2 GWh |
| #426 | Ragsdale Solar LLC | Canton, MS | 241.0 GWh |
| #427 | Hornshadow Solar, LLC | Castle Dale, UT | 240.0 GWh |
| #428 | Split Rail Solar Energy LLC | Warrenton, MO | 239.0 GWh |
| #429 | East Pecos Solar | McCamey, TX | 238.0 GWh |
| #430 | BPL Files Solar | Itasca, TX | 237.3 GWh |
| #431 | Prairie Ronde Solar Farm | Opelousas, LA | 237.2 GWh |
| #432 | SR Clay, LLC | Fort Gaines, GA | 236.2 GWh |
| #433 | RE Mustang LLC | Lemoore, CA | 220.8 GWh |
| #435 | Wheatsborough Solar | Bellevue, OH | 232.4 GWh |
| #436 | Prairie Mist Solar | Montrose, AR | 232.4 GWh |
| #437 | Briar Creek Solar 1 | Corsicana, TX | 232.4 GWh |
| #438 | Eldorado Solar II | Eldorado, IL | 232.4 GWh |
| #439 | OCI Alamo 7 LLC | Haskell, TX | 231.6 GWh |
| #440 | East Line Solar | Coolidge, AZ | 230.4 GWh |
| #441 | Oak Trail Solar, LLC | Moyock, NC | 230.0 GWh |
| #442 | Dodson Creek Solar, LLC | Hillsboro, OH | 229.8 GWh |
| #443 | Willow Spring Solar, LLC | Rosamond, CA | 229.7 GWh |
| #444 | 1000 Mile Solar | Plains, TX | 228.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Maverick Solar 6, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arica Solar | Desert Center, CA | 722.5 GWh | 3.7 mi |
| Athos Solar Project | Desert Center, CA | 670.5 GWh | 3.8 mi |
| Chuckawalla Solar | Blythe, CA | 7.3 GWh | 28.1 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 502.0 MWh | 28.9 mi |
| Desert Harvest II LLC | Desert Center, CA | 192.7 GWh | 6.9 mi |
| Desert Harvest, LLC | Desert Center, CA | 228.7 GWh | 6.9 mi |
| Desert Sunlight 250, LLC | Desert Center, CA | 516.8 GWh | 7.3 mi |
| Desert Sunlight 300, LLC | Desert Center, CA | 620.2 GWh | 8.5 mi |
| Genesis Solar Energy Project | Blythe, CA | 581.1 GWh | 22.1 mi |
| Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 43.9 GWh | 31.7 mi |
| Ironwood Solar LLC | Blythe, CA | 7.3 GWh | 28.2 mi |
| Maverick Solar 4, LLC | Desert Center, CA | 292.4 GWh | 0 mi |
| Maverick Solar 7, LLC | Desert Center, CA | 396.7 GWh | 0 mi |
| Maverick Solar, LLC | Desert Center, CA | 309.2 GWh | 0 mi |
| Oberon II Solar Project | Desert Center, CA | 560.0 GWh | 2 mi |
| Oberon Solar Project | Desert Center, CA | 557.0 GWh | 2 mi |
| SE Athos II, LLC | Desert Center, CA | 509.8 GWh | 3.8 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 1.4 GWh | 28.1 mi |
| Victory Pass | Desert Center, CA | 561.4 GWh | 3.7 mi |
| Wister Solar | Niland, CA | 33.0 GWh | 30.6 mi |