Midway Solar Farm II
7096 English Road, Calipatria, CA 92233Plant Summary Information
Midway Solar Farm II is ranked #230 out of 852 solar farms in California in terms of total annual net electricity generation.
Midway Solar Farm II generated 8.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Midway Solar Farm II |
|---|---|
| Utility Name | Dominion Renewable Energy |
| Location | Imperial County, CA |
| Initial Operation Date | May 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 36.1 GWh |
| Annual Consumption | 128.7 k MMBtu |
| Ranked #4,546 out of 12,613 Power Plants Nationwide | |
| Ranked #1,176 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #569 out of 1,603 California Power Plants | |
| Ranked #230 out of 852 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
96WI 8ME, LLC (2015 to 2016) Dominion Renewable Energy (2017 to 2024) |
Map of Midway Solar Farm II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Midway Solar Farm II.
Monthly Net Generation for Midway Solar Farm II
Monthly Plant Fuel Consumption for Midway Solar Farm II
Midway Solar Farm II Details
| Summary Information | |
|---|---|
| Plant Name | Midway Solar Farm II (60237) |
| Plant Address | 7096 English Road, Calipatria, CA 92233 |
| Utility | Dominion Renewable Energy (58468) |
| Latitude, Longitude | 33.16206, -115.53169 |
| Generation Dates on File | Mar 2017 to Dec 2025 |
| Initial Operation Date | May 2017 |
| Annual Generation | 36.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Imperial Irrigation District (IID) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator MSF2 Details Operating May 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 30 MW |
| Summer Capacity | 30 MW |
| Winter Capacity | 30 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 40 MW |
| Thin Film Other | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Midway Solar Farm II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1166 | DePue Holdings, LLC | DePue, IL | 37.1 GWh |
| #1167 | Sunray 3 | Daggett, CA | 37.1 GWh |
| #1168 | Montross Solar | Montross, VA | 37.0 GWh |
| #1169 | Shawboro PV1 | Shawboro, NC | 36.9 GWh |
| #1170 | Midcontinent Solar, LLC | Owosso, MI | 36.8 GWh |
| #1171 | RE Gillespie 1 LLC | Gila Bend, AZ | 36.8 GWh |
| #1172 | Cement City Solar, LLC | Cement City, MI | 36.8 GWh |
| #1173 | West Loch Solar One | Ewa Beach, HI | 36.5 GWh |
| #1174 | Blue Elk III Solar, LLC | Eaton Rapids, MI | 36.4 GWh |
| #1175 | Ben Moreell Solar Farm | Tinton Falls, NJ | 36.2 GWh |
| #1177 | SR Canadaville, LLC | Collierville, TN | 36.1 GWh |
| #1178 | North 301 Solar | Enfield, NC | 35.9 GWh |
| #1179 | Demille Solar Farm | Lapeer, MI | 35.8 GWh |
| #1180 | RE Kansas Solar, LLC | Lemoore, CA | 35.7 GWh |
| #1181 | RE Old River One, LLC | Bakersfield, CA | 35.6 GWh |
| #1182 | Pinson Solar Farm | Woodruff, SC | 35.5 GWh |
| #1183 | Holstein Plant | Maxton, NC | 35.4 GWh |
| #1184 | Fort Stewart Solar Facility | Fort Stewart, GA | 35.2 GWh |
| #1185 | Alamosa Solar | Mosca, CO | 35.1 GWh |
| #1186 | Imperial Valley Solar Company 1 LLC | Niland, CA | 35.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Midway Solar Farm II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Calipatria Solar Farm | Calipatria, CA | 38.3 GWh | 0.3 mi |
| Calipatria State Prison | Calipatria, CA | 16.5 GWh | 2.7 mi |
| CE Leathers | Calipatria, CA | 70.6 GWh | 2.2 mi |
| Citizens Imperial Solar | Calipatria, CA | 49.0 GWh | 6 mi |
| Del Ranch Company | Calipatria, CA | 326.3 GWh | 4.9 mi |
| Elmore Company | Calipatria, CA | 104.3 GWh | 4.3 mi |
| Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 46.2 GWh | 6.5 mi |
| Imperial Valley Solar Company 1 LLC | Niland, CA | 35.1 GWh | 6.1 mi |
| John L. Featherstone Plant | Calipatria, CA | 433.1 GWh | 3.8 mi |
| Midway Solar Farm 1 | Calipatria, CA | 108.2 GWh | 2.6 mi |
| Midway Solar Farm III | Calipatria, CA | 50.9 GWh | 0.9 mi |
| Niland Gas Turbine Plant | Niland, CA | 55.7 GWh | 5.5 mi |
| Salton Sea Power Gen Co - Unit 1 | Calipatria, CA | 78.4 GWh | 6.7 mi |
| Salton Sea Power Gen Co - Unit 2 | Calipatria, CA | 107.0 GWh | 6.6 mi |
| Salton Sea Power Gen Co - Unit 3 | Calipatria, CA | 314.9 GWh | 6.2 mi |
| Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 179.8 GWh | 6.2 mi |
| Salton Sea Power LLC - Unit 5 | Calipatria, CA | 290.3 GWh | 6.2 mi |
| Solar Gen 2 Solar Facility | Calipatria, CA | 364.2 GWh | 6.7 mi |
| Vulcan-BN Geothermal Power Company | Calipatria, CA | 227.2 GWh | 4.9 mi |
| Wister Solar | Niland, CA | 28.2 GWh | 7.6 mi |