Midway Solar Farm II
7096 English Road, Calipatria, CA 92233Plant Summary Information
Midway Solar Farm II is ranked #203 out of 885 solar farms in California in terms of total annual net electricity generation.
Midway Solar Farm II generated 15.7 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Midway Solar Farm II |
|---|---|
| Utility Name | Dominion Renewable Energy |
| Location | Imperial County, CA |
| Initial Operation Date | May 2017 |
| Last Update | May 2026 |
| Annual Generation | 44.4 GWh |
| Annual Consumption | 161.8 k MMBtu |
| Ranked #4,339 out of 13,081 Power Plants Nationwide | |
| Ranked #1,170 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #499 out of 1,606 California Power Plants | |
| Ranked #203 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
96WI 8ME, LLC (2015 to 2016) Dominion Renewable Energy (2017 to 2025) |
Map of Midway Solar Farm II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Midway Solar Farm II.
Monthly Net Generation for Midway Solar Farm II
Monthly Plant Fuel Consumption for Midway Solar Farm II
Midway Solar Farm II Details
| Summary Information | |
|---|---|
| Plant Name | Midway Solar Farm II (60237) |
| Plant Address | 7096 English Road, Calipatria, CA 92233 |
| Utility | Dominion Renewable Energy (58468) |
| Latitude, Longitude | 33.16206, -115.53169 |
| Generation Dates on File | Mar 2017 to May 2026 |
| Initial Operation Date | May 2017 |
| Annual Generation | 44.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Imperial Irrigation District (IID) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator MSF2 Details Operating May 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 30 MW |
| Summer Capacity | 30 MW |
| Winter Capacity | 30 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 40 MW |
| Thin Film Other | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Midway Solar Farm II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1160 | DWW Solar ll | Simsbury, CT | 46.1 GWh |
| #1161 | Gaston Solar Power Plant | Cherryville Township, NC | 45.8 GWh |
| #1162 | AP North Lake I, LP | Hemet, CA | 45.7 GWh |
| #1163 | American Falls Solar II | American Falls, ID | 45.4 GWh |
| #1164 | SR Odom | Moultrie, GA | 45.3 GWh |
| #1165 | Sol Orchard El Centro PV | El Centro, CA | 45.1 GWh |
| #1166 | Arbor Hill Solar | Greenfield, IA | 45.1 GWh |
| #1167 | Camden Solar LLC | South Camden, NC | 45.1 GWh |
| #1168 | RE Victor Phelan Solar One LLC | Adelanto, CA | 45.1 GWh |
| #1169 | Cooks Mill PV I | Matoon, IL | 44.9 GWh |
| #1171 | Bayshore Solar A, LLC | Lancaster, CA | 44.4 GWh |
| #1172 | Egypt Road Solar | Cambridge, MD | 44.3 GWh |
| #1173 | Pavant Solar III | Filmore, UT | 44.2 GWh |
| #1174 | Mohave Energy - Hybrid | Fort Mohave, AZ | 44.3 GWh |
| #1175 | Stony Knoll Solar, LLC | Rockford, NC | 44.0 GWh |
| #1176 | Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 43.9 GWh |
| #1177 | Gaia Hybrid | Navarro, TX | 43.5 GWh |
| #1178 | Rawhide Prairie Solar Hybrid | Wellington, CO | 43.7 GWh |
| #1179 | Shoreham Solar Commons | Shoreham, NY | 43.7 GWh |
| #1180 | American Falls Solar | American Falls, ID | 43.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Midway Solar Farm II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Calipatria Solar Farm | Calipatria, CA | 36.1 GWh | 0.3 mi |
| Calipatria State Prison | Calipatria, CA | 16.9 GWh | 2.7 mi |
| CE Leathers | Calipatria, CA | 270.5 GWh | 2.2 mi |
| CE Turbo LLC | Calipatria, CA | 9.3 GWh | 1.2 mi |
| Citizens Imperial Solar | Calipatria, CA | 60.6 GWh | 6 mi |
| Del Ranch Company | Calipatria, CA | 297.8 GWh | 4.9 mi |
| Elmore Company | Calipatria, CA | 368.1 GWh | 4.3 mi |
| Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 43.9 GWh | 6.5 mi |
| Imperial Valley Solar Company 1 LLC | Niland, CA | 33.1 GWh | 6.1 mi |
| John L. Featherstone Plant | Calipatria, CA | 428.7 GWh | 3.8 mi |
| Midway Solar Farm 1 | Calipatria, CA | 100.6 GWh | 2.6 mi |
| Midway Solar Farm III | Calipatria, CA | 40.4 GWh | 0.9 mi |
| Niland Gas Turbine Plant | Niland, CA | 35.0 GWh | 5.5 mi |
| Salton Sea Power Gen Co - Unit 1 | Calipatria, CA | 77.1 GWh | 6.7 mi |
| Salton Sea Power Gen Co - Unit 2 | Calipatria, CA | 74.8 GWh | 6.6 mi |
| Salton Sea Power Gen Co - Unit 3 | Calipatria, CA | 288.8 GWh | 6.2 mi |
| Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 321.2 GWh | 6.2 mi |
| Salton Sea Power LLC - Unit 5 | Calipatria, CA | 295.9 GWh | 6.2 mi |
| Solar Gen 2 Solar Facility | Calipatria, CA | 376.7 GWh | 6.7 mi |
| Vulcan-BN Geothermal Power Company | Calipatria, CA | 232.2 GWh | 4.9 mi |