Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.3 GWh | Feb 2013 | Dec 2024 | Solar |
| Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2013 | Dec 2024 | Solar |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2013 | Dec 2024 | Solar |
| White River Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 44.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 34.6 GWh | Jul 2013 | Dec 2024 | Solar |
| Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2013 | Dec 2024 | Solar |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2013 | Dec 2024 | Landfill Gas |
| Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 379.0 GWh | Dec 2013 | Dec 2024 | Wind |
| Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 269.5 GWh | Dec 2013 | Dec 2024 | Wind |
| Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 8.7 GWh | Apr 2013 | Dec 2024 | Landfill Gas |
| Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 24.6 GWh | Apr 2014 | Dec 2024 | Solar |
| Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 23.6 GWh | Nov 2014 | Dec 2024 | Solar |
| Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2024 | Solar |
| Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2015 | Dec 2024 | Solar |
| CSU Northridge Plant | California State University, Northridge | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 865.0 MWh | Nov 2001 | Dec 2024 | Solar |
| Bob Wiley Detention Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2020 | Dec 2024 | Solar |
| Wheeler Ridge 2 | Madison Energy Investments LLC | Arvin, CA | California Independent System Operator (CISO) | 913.0 MWh | Oct 2023 | Dec 2024 | Solar |
| Tulare Akers Professional Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2019 | Dec 2024 | Solar |
| Government Plaza Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.7 GWh | Oct 2020 | Dec 2024 | Solar |
| North Juvenile Detention Center Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.0 GWh | Oct 2019 | Dec 2024 | Solar |
| South County Detention Center Solar | SoCore Energy LLC | Porterville, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2019 | Dec 2024 | Solar |
| North Kern 1 | Madison Energy Investments LLC | Shafter, CA | California Independent System Operator (CISO) | 3.9 GWh | May 2023 | Dec 2024 | Solar |
| North Kern 2 | Madison Energy Investments LLC | City of Shafter, CA | California Independent System Operator (CISO) | 2.4 GWh | Jun 2024 | Dec 2024 | Solar |
| Mountain View Ind Park 1-sline001 | Prologis Logistics Services Incorporated | Fontana, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2023 | Dec 2024 | Solar |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 636.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Lemoore West | Leprino Foods | Lemoore, CA | California Independent System Operator (CISO) | 14.4 GWh | Nov 2022 | Dec 2024 | Solar |
| Hollister Wastewater Facility | Perpetual Energy Systems | Hollister, CA | California Independent System Operator (CISO) | 1.7 GWh | Oct 2011 | Dec 2024 | Solar |
| City of Long Beach Airport Lot A & B | Solar DG CA Long Beach, LLC | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 2.8 GWh | Jan 2024 | Dec 2024 | Solar |
| Wonderful Orchards - West Valley | Wonderful Renewable Energy, LLC. | Blackwells Corner, CA | California Independent System Operator (CISO) | 1.4 GWh | Sep 2020 | Dec 2024 | Solar |
| Harris Farms Solar Facility | Harris Farms Inc | Coalinga, CA | California Independent System Operator (CISO) | 3.0 GWh | Feb 2024 | Dec 2024 | Solar |
| Paso Robles - Municipal Airport | Onyx Asset Services Group | Paso Robles, CA | California Independent System Operator (CISO) | 6.0 GWh | Dec 2023 | Dec 2024 | Solar |
| Civic Center East | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Delta Electronics Fremont | Delta Electronics (Americas) Ltd | Fremont, CA | California Independent System Operator (CISO) | 616.0 MWh | Mar 2016 | Dec 2024 | Solar |
| Sutter Santa Rosa Solar | Sutter Santa Rosa Solar LLC | Santa Rosa, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2019 | Dec 2024 | Solar |
| Open Sky Dairy | Renewable Solar, Inc | Riverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Jun 2024 | Dec 2024 | Solar |
| JD Foods - JD Foods | Barrier Solar Inc | Fresno, CA | California Independent System Operator (CISO) | 455.0 MWh | Sep 2020 | Dec 2024 | Solar |
| Pivot Energy PPA 22 | Pivot Energy | Visalia, CA | California Independent System Operator (CISO) | 68.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Blue Moon Farms | Bravo REC Management LLC | Tipton, CA | California Independent System Operator (CISO) | 683.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Tipton 1 - (CA) | Pacifico Power | Tipton, CA | California Independent System Operator (CISO) | 167.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Tipton 2 - (CA) | Pacifico Power | Tipton, CA | California Independent System Operator (CISO) | 83.0 MWh | Nov 2024 | Dec 2024 | Solar |
| North Kern 3 | Madison Energy Investments LLC | Bakersfield, CA | California Independent System Operator (CISO) | 6.0 MWh | Nov 2023 | Dec 2024 | Solar |
| Kern Del Oro | REC KDO, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 4.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Sutter Home Winery GIR | Westbound Solar 3, LLC | American Canyon, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2024 | Solar |
| Sutter Home Winery TCC | REC SHW, LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Google Bayhill Solar PV and Microgrid | Google, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 1.0 GWh | Mar 2024 | Dec 2024 | Solar |
| Tulare CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 375.0 MWh | Sep 2024 | Dec 2024 | Solar |
| AVI Bakersfield | Anthony Vineyards, Inc. | Bakersfield, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2022 | Dec 2024 | Solar |
| Grossmont College | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 4.4 GWh | Feb 2023 | Dec 2024 | Solar |
| Vulcan San Emidio Solar | Renew Solar VMC LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2023 | Dec 2024 | Solar |
| SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2023 | Dec 2024 | Solar |
| Avenue 26 Solar | RPCA Solar 1, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2024 | Dec 2024 | Solar |
| Blackjack Solar | South County Packing | King City, CA | California Independent System Operator (CISO) | 8.8 GWh | Nov 2020 | Dec 2024 | Solar |
| Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2022 | Dec 2024 | Solar |
| Cawelo Water District Solar | Scooby Solar, LLC | Famoso, CA | California Independent System Operator (CISO) | 6.7 GWh | Sep 2023 | Dec 2024 | Solar |
| Sunny Cow Solar, LLC | Sunny Cow Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 5.5 GWh | Sep 2023 | Dec 2024 | Solar |
| IPC 25 Solar | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 2.8 GWh | Jun 2024 | Dec 2024 | Solar |
| Case Vander Eyk, Jr Dairy Solar | Bravo REC Management LLC | Pixley, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2023 | Dec 2024 | Solar |
| Lost Hills Oilfield | Distributed Solar Development, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2021 | Dec 2024 | Solar |
| Amazon SAN3 Solar Project | Solar Star Prime 4 LLC | San Diego, CA | California Independent System Operator (CISO) | 6.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Cabrillo College | Forefront Power, LLC | Aptos, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2023 | Dec 2024 | Solar |
| Fresno Community Solar | Fresno Community Solar Developers, LLC | Fresno, CA | California Independent System Operator (CISO) | 15.4 GWh | May 2024 | Dec 2024 | Solar |
| Tejon Castac Water District Solar | CTMW Solar, LLC | Arvin, CA | California Independent System Operator (CISO) | 2.5 GWh | Apr 2024 | Dec 2024 | Solar |
| Double J Dairy Array | Bravo REC Management LLC | Visalia, CA | California Independent System Operator (CISO) | 8.5 GWh | Oct 2023 | Dec 2024 | Solar |
| TWC | Bravo REC Management LLC | Tulare, CA | California Independent System Operator (CISO) | 918.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Lone Oak | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2023 | Dec 2024 | Solar |
| CSU Sacramento I | BluePath Solar Sacramento I LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.1 GWh | Jan 2023 | Dec 2024 | Solar |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2024 | Dec 2024 | Solar |
| River Ranch Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 6.9 GWh | May 2024 | Dec 2024 | Solar |
| Bishop Ranch BR 1-X | Bollinger Canyon Road BR 1-X Solar Project 2020 | San Ramon, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2022 | Dec 2024 | Solar |
| Highway 43 1887-WD | Standard Solar | Shafter, CA | California Independent System Operator (CISO) | 270.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Nachtigall 1836-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 8.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 57.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Kern Sunset 1886-WD | Standard Solar | Bakersfield, CA | California Independent System Operator (CISO) | 270.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 10.1 GWh | Oct 2023 | Dec 2024 | Solar |
| Open Sky Ranch Inc | Bravo REC Management LLC | Riverdale, CA | California Independent System Operator (CISO) | 1.9 GWh | Jun 2024 | Dec 2024 | Solar |
| Dixie Creek Dairy Solar | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2024 | Dec 2024 | Solar |
| Costa View Farms | 127 CVF, LLC | Madera, CA | California Independent System Operator (CISO) | 5.1 GWh | May 2024 | Dec 2024 | Solar |
| Wheeler Ridge | AFTW Holdings, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 11.9 GWh | Aug 2023 | Dec 2024 | Solar |
| Bishop Ranch - BR 1-Y | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.7 GWh | Feb 2022 | Dec 2024 | Solar |
| Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 352.7 GWh | Jun 2013 | Dec 2024 | Solar |
| Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 77.9 GWh | Jul 2012 | Dec 2024 | Natural Gas |
| Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 32.3 GWh | Feb 2013 | Dec 2024 | Landfill Gas |
| Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 30.7 GWh | Mar 2014 | Dec 2024 | Landfill Gas |
| Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 31.8 GWh | Jan 2014 | Dec 2024 | Landfill Gas |
| Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2013 | Dec 2024 | Solar |
| Arrache 4013 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 2013 | Dec 2024 | Solar |
| Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2013 | Dec 2024 | Solar |
| Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Dec 2024 | Solar |
| Rutan | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.7 GWh | Dec 2013 | Dec 2024 | Solar |
| Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2013 | Dec 2024 | Solar |
| Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2013 | Dec 2024 | Solar |
| Watts 3115 | CD US Solar MT 2 LLC | Adelanto, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2013 | Dec 2024 | Solar |
| McCoy Solar Energy Project Hybrid | McCoy Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 646.7 GWh | Jul 2015 | Dec 2024 | Solar |
| Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 294.7 GWh | Sep 2013 | Dec 2024 | Solar |
| RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 52.3 GWh | Dec 2013 | Dec 2024 | Solar |
| RE Rosamond Two LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 48.3 GWh | Dec 2013 | Dec 2024 | Solar |
| RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2013 | Dec 2024 | Solar |
| RE Columbia 3 LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 23.9 GWh | Dec 2013 | Dec 2024 | Solar |
| Chuckawalla Solar | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.1 GWh | May 2012 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on October 2025 generation numbers.| County | State Rank | Active Plants | Oct 2025 Generation |
|---|---|---|---|
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.0 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| Siskiyou County, CA | # 47 | 8 | 89.8 GWh |
| San Mateo County, CA | # 46 | 11 | 133.9 GWh |
| Yolo County, CA | # 45 | 15 | 212.2 GWh |
| Nevada County, CA | # 44 | 12 | 219.1 GWh |
| San Benito County, CA | # 43 | 6 | 293.7 GWh |
| Mariposa County, CA | # 42 | 2 | 299.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 337.8 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 472.3 GWh |
| Calaveras County, CA | # 38 | 6 | 501.4 GWh |
| Merced County, CA | # 37 | 31 | 543.8 GWh |
| Trinity County, CA | # 36 | 5 | 570.3 GWh |
| Amador County, CA | # 35 | 8 | 664.9 GWh |
| Ventura County, CA | # 34 | 32 | 752.7 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 904.9 GWh |
| Madera County, CA | # 31 | 28 | 970.8 GWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Oct 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.5 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Placer County, CA | # 24 | 24 | 1.9 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.1 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 2.9 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.0 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| San Diego County, CA | # 12 | 151 | 4.9 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| Sacramento County, CA | # 10 | 65 | 6.5 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.6 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| Riverside County, CA | # 4 | 159 | 14.8 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.1 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.0 TWh |
| Kern County, CA | # 1 | 313 | 34.9 TWh |