12000 Vista Del Mar, Playa del Rey, CA 90293Plant Summary Information
Hyperion Treatment Plant CHP Plant is ranked #2 out of 72 other biomass gas power plants nationwide in terms of total annual net electricity generation.
Hyperion Treatment Plant CHP Plant is comprised of 3 generators and generated 38.7 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Hyperion Treatment Plant CHP Plant |
|---|---|
| Utility Name | Constellation New Energy Inc. |
| Location | Los Angeles County, CA |
| Initial Operation Date | April 2017 |
| Last Update | Aug 2026 |
| Annual Generation | 155.0 GWh |
| Annual Consumption | 1.9 M MMBtu |
| Ranked #2,986 out of 13,301 Power Plants Nationwide | |
| Ranked #2 out of 72 Other Biomass Gas Power Plants Nationwide | |
| Ranked #296 out of 1,641 California Power Plants | |
| Ranked #2 out of 38 California Other Biomass Gas Power Plants | |
| Fuel Types | Other Biomass Gas : 61.8% Natural Gas : 38.2% |
Map of Hyperion Treatment Plant CHP Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hyperion Treatment Plant CHP Plant.
Monthly Net Generation for Hyperion Treatment Plant CHP Plant
Monthly Plant Fuel Consumption for Hyperion Treatment Plant CHP Plant
Hyperion Treatment Plant CHP Plant Details
| Summary Information | |
|---|---|
| Plant Name | Hyperion Treatment Plant CHP Plant (60960) |
| Plant Address | 12000 Vista Del Mar, Playa del Rey, CA 90293 |
| Utility | Constellation New Energy Inc. (60396) |
| Latitude, Longitude | 33.9254, -118.4298 |
| Generation Dates on File | May 2017 to Aug 2026 |
| Initial Operation Date | April 2017 |
| Annual Generation | 155.0 GWh |
| Fuel Types | Other Biomass Gas : 61.8% Natural Gas : 38.2% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Wastewater Effluent |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
| Natural Gas Storage | No |
Generator CTG1 Details Operating April 2017
| Technology | Other Waste Biomass |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 11 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Minimum Load | 8.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Other Biomass Gas / Natural Gas |
| Startup Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / OBG |
|---|---|
Generator CTG2 Details Operating April 2017
| Technology | Other Waste Biomass |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 11 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Minimum Load | 8.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Other Biomass Gas / Natural Gas |
| Startup Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / OBG |
|---|---|
Generator STG1 Details Operating April 2017
| Technology | Other Waste Biomass |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 11 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Other Biomass Gas / Natural Gas |
| Startup Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / OBG |
|---|---|
Hyperion Treatment Plant CHP Plant Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Exelon | 12000 Vista Del Mar, Playa Del Rey, CA 90293 | Generator CTG1 | 100.00% |
| Exelon | 12000 Vista Del Mar, Playa Del Rey, CA 90293 | Generator CTG2 | 100.00% |
| Exelon | 12000 Vista Del Mar, Playa Del Rey, CA 90293 | Generator STG1 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Other Biomass Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Total Energy Facilities | Carson, CA | 156.5 GWh |
| #3 | Walt Bailey Bioenergy Facility | Washington, DC | 48.2 GWh |
| #4 | BioTown Ag | Reynolds, IN | 36.8 GWh |
| #5 | Plant No 2 Orange County | Huntington Beach, CA | 46.9 GWh |
| #6 | Metro Wastewater Reclamation District | Denver, CO | 36.2 GWh |
| #7 | Cosumnes Power Plant | Herald, CA | 3.1 TWh |
| #8 | SJ/SC WPCP | San Jose, CA | 75.0 GWh |
| #9 | Plant No 1 Orange County | Fountain Valley, CA | 40.8 GWh |
| #10 | WWTP Power Generation Station | Oakland, CA | 31.4 GWh |
| #11 | Gas Utilization Facility | San Diego, CA | 26.6 GWh |
| #12 | Deer Island Treatment Plant | Winthrop, MA | 31.8 GWh |
| #13 | PWD Northeast WPCP Biogas Cogen Plant | Philadelphia, PA | 31.4 GWh |
| #14 | MMSD South Shore Wastewater | Oak Creek, WI | 23.0 GWh |
| #15 | Power Generation Station (PGS) 2 | Oakland, CA | 20.3 GWh |
| #16 | ABEC Bidart-Old River LLC | Bakersfield, CA | 15.6 GWh |
| #17 | West Point Treatment Plant | Seattle, WA | 14.3 GWh |
| #18 | West Point RNG | Wendell, ID | 13.7 GWh |
| #19 | Encina Water Pollution Control | Carlsbad, CA | 14.3 GWh |
| #20 | Toyota Long Beach Trigen | Long Beach, CA | 13.4 GWh |
| #21 | Southside Water Reclamation Plant | Albuquerque, NM | 23.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hyperion Treatment Plant CHP Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 20333 Normandie PV, LLC | Torrance, CA | 5.1 GWh | 9.2 mi |
| AT&T - Gardena | Gardena, CA | 7.8 GWh | 8.8 mi |
| AT&T - Hawthorne | Hawthorne, CA | 8.5 GWh | 6.3 mi |
| Carson Cogeneration | Carson, CA | 2.6 GWh | 10.9 mi |
| CBS Television City | Los Angeles, CA | 977.0 MWh | 11.1 mi |
| Central Utilities Plant LAX 2 | Los Angeles, CA | 31.5 GWh | 1.9 mi |
| DirecTV - Los Angeles | Los Angeles, CA | 7.9 GWh | 4 mi |
| Disney Prospect | Los Angeles, CA | 8.0 GWh | 10.9 mi |
| El Segundo Cogen | El Segundo, CA | 1.2 TWh | 2 mi |
| El Segundo Energy Center LLC | El Segundo, CA | 92.1 GWh | 1.1 mi |
| Equinix Douglas St. Fuel Cell | El Segundo, CA | 15.5 GWh | 2.6 mi |
| Equinix Maple Ave. Fuel Cell | El Segundo, CA | 8.0 GWh | 2 mi |
| Francisco St. Solar | Torrance, CA | 1.4 GWh | 8.9 mi |
| KSR053 Cantara Fuel Cell | Panorama City, CA | 12.5 GWh | 12.2 mi |
| Lafayette 2 - MLK Jr. Hospital (MLK) | Los Angeles, CA | 2.1 GWh | 10.9 mi |
| Scattergood | Playa del Rey, CA | 1.6 TWh | 0.5 mi |
| Torrance Refining Company, LLC | Torrance, CA | 62.2 GWh | 7.6 mi |
| UCLA So Campus Cogen Project | Los Angeles, CA | 255.4 GWh | 10 mi |
| USPS PV | Los Angeles, CA | 10.9 GWh | 10.5 mi |
| VS BC Pacific Gateway, LLC | Los Angeles, CA | 2.3 GWh | 9.1 mi |