Oberon Solar Project
27200 Rice Road, Desert Center, CA 92239Plant Summary Information
Oberon Solar Project is ranked #22 out of 885 solar farms in California in terms of total annual net electricity generation.
Oberon Solar Project generated 128.9 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Oberon Solar Project |
|---|---|
| Utility Name | Intersect USA, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | September 2023 |
| Last Update | May 2026 |
| Annual Generation | 570.1 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #1,203 out of 13,081 Power Plants Nationwide | |
| Ranked #72 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #65 out of 1,606 California Power Plants | |
| Ranked #22 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
IP Oberon LLC (2021 to 2024) Intersect USA, LLC (2025 to 2025) |
Map of Oberon Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Oberon Solar Project.
Monthly Net Generation for Oberon Solar Project
Monthly Plant Fuel Consumption for Oberon Solar Project
Oberon Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Oberon Solar Project (65734) |
| Plant Address | 27200 Rice Road, Desert Center, CA 92239 |
| Utility | Intersect USA, LLC (67582) |
| Latitude, Longitude | 33.72899, -115.38238 |
| Generation Dates on File | Sep 2023 to May 2026 |
| Initial Operation Date | September 2023 |
| Annual Generation | 570.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 22-141-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 500.00 kV |
| Energy Storage | Yes |
Generator OBIBS Details Operating September 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | REDBLUFF_2_B1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | REDBLUFF_2_B1 |
| Nameplate Capacity | 125 MW |
| Summer Capacity | 125 MW |
| Winter Capacity | 125 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 500 |
|---|---|
| Maximum Charge Rate | 125 MW |
| Maximum Discharge Rate | 125 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 127.5 |
| Storage Enclosure Type | CS |
| Arbitrage | Yes |
| Co Located Renewable Firming | Yes |
| Excess Wind And Solar Generation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 65734 |
| Direct Support Gen Id | OBIPV |
| Support T D Asset | No |
Generator OBIPV Details Operating September 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | REDBLUFF_2_B1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | REDBLUFF_2_B1 |
| Nameplate Capacity | 250 MW |
| Summer Capacity | 250 MW |
| Winter Capacity | 250 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 339 MW |
| Crystalline Silicon | No |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Oberon Solar Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #62 | Hecate Energy Highland LLC | Buford, OH | 628.8 GWh |
| #63 | Wadley Solar | Wadley, GA | 623.4 GWh |
| #64 | Desert Sunlight 300, LLC | Desert Center, CA | 620.2 GWh |
| #65 | Moapa Southern Paiute | Moapa, NV | 618.7 GWh |
| #66 | Arrow Canyon Solar Hybrid | Moapa, NV | 601.7 GWh |
| #67 | Copper Mountain Solar 3 | Boulder City, NV | 603.2 GWh |
| #68 | Genesis Solar Energy Project | Blythe, CA | 600.0 GWh |
| #69 | Oberon II Solar Project | Desert Center, CA | 580.5 GWh |
| #70 | Blythe Mesa Solar II | Blythe, CA | 578.3 GWh |
| #71 | Mojave Solar Project | Hinkley, CA | 592.1 GWh |
| #73 | Victory Pass | Desert Center, CA | 568.8 GWh |
| #74 | Ray Ranch Solar | Pettus, TX | 579.3 GWh |
| #75 | Cottonwood Bayou Solar | Liverpool, TX | 575.6 GWh |
| #76 | Hopkins Energy LLC | Dike, TX | 574.1 GWh |
| #77 | Sun Valley Solar Project | Abbott, TX | 568.1 GWh |
| #78 | Texas Solar Nova 2 | Spur, TX | 565.1 GWh |
| #79 | Eiffel Solar Project | Paris, TX | 564.7 GWh |
| #80 | IP Radian, LLC | Brookesmith, TX | 564.4 GWh |
| #81 | SR Toombs, LLC | Vidalia, GA | 562.0 GWh |
| #82 | Hill Solar 1 | Itasca, TX | 561.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Oberon Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arica Solar | Desert Center, CA | 740.4 GWh | 4.3 mi |
| Athos Solar Project | Desert Center, CA | 703.4 GWh | 2.2 mi |
| Chuckawalla Solar | Blythe, CA | 7.3 GWh | 28.9 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 502.0 MWh | 29.8 mi |
| Desert Harvest II LLC | Desert Center, CA | 193.6 GWh | 4.9 mi |
| Desert Harvest, LLC | Desert Center, CA | 234.9 GWh | 4.9 mi |
| Desert Sunlight 250, LLC | Desert Center, CA | 516.8 GWh | 5.3 mi |
| Desert Sunlight 300, LLC | Desert Center, CA | 620.2 GWh | 6.5 mi |
| Genesis Solar Energy Project | Blythe, CA | 600.0 GWh | 22.5 mi |
| Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 43.9 GWh | 33.6 mi |
| Ironwood Solar LLC | Blythe, CA | 7.3 GWh | 29 mi |
| Maverick Solar 4, LLC | Desert Center, CA | 295.5 GWh | 2 mi |
| Maverick Solar 6, LLC | Desert Center, CA | 246.1 GWh | 2 mi |
| Maverick Solar 7, LLC | Desert Center, CA | 398.2 GWh | 2 mi |
| Maverick Solar, LLC | Desert Center, CA | 330.2 GWh | 2 mi |
| Oberon II Solar Project | Desert Center, CA | 580.5 GWh | 0 mi |
| SE Athos II, LLC | Desert Center, CA | 558.5 GWh | 2.2 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 1.4 GWh | 29 mi |
| Victory Pass | Desert Center, CA | 568.8 GWh | 4.3 mi |
| Wister Solar | Niland, CA | 33.0 GWh | 32.5 mi |