Camino Solar Hybrid
17890 Champagne Ave, Rosamond, CA 93560Plant Summary Information
Camino Solar Hybrid is ranked #115 out of 886 solar farms in California in terms of total annual net electricity generation.
Camino Solar Hybrid generated 42.3 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Camino Solar Hybrid |
|---|---|
| Utility Name | Avangrid Power LLC |
| Location | Kern County, CA |
| Initial Operation Date | April 2025 |
| Last Update | Jun 2026 |
| Annual Generation | 134.4 GWh |
| Annual Consumption | 506.7 k MMBtu |
| Ranked #3,146 out of 13,094 Power Plants Nationwide | |
| Ranked #773 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #314 out of 1,607 California Power Plants | |
| Ranked #115 out of 886 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Avangrid Renewables LLC (2019 to 2023) Avangrid Power LLC (2024 to 2025) |
Map of Camino Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Camino Solar Hybrid.
Monthly Net Generation for Camino Solar Hybrid
Monthly Plant Fuel Consumption for Camino Solar Hybrid
Camino Solar Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Camino Solar Hybrid (63508) |
| Plant Address | 17890 Champagne Ave, Rosamond, CA 93560 |
| Utility | Avangrid Power LLC (15399) |
| Latitude, Longitude | 34.93031, -118.44321 |
| Generation Dates on File | Apr 2025 to Jun 2026 |
| Initial Operation Date | April 2025 |
| Annual Generation | 134.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG25-37-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | No |
Generator CSPV1 Details Operating April 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 44 MW |
| Summer Capacity | 44 MW |
| Winter Capacity | 44 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 57.17 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Camino Solar Hybrid Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #763 | Crooked Run | Willard, NC | 136.2 GWh |
| #764 | Trent River Solar, LLC | Pollocksville, NC | 135.8 GWh |
| #765 | Eastover Solar | Eastover, SC | 135.8 GWh |
| #766 | Rocking R Solar, LLC | Hosston, LA | 135.7 GWh |
| #767 | New Market Solar | Sardinia, OH | 135.5 GWh |
| #768 | Prairie Solar LLC | Sidney, IL | 134.8 GWh |
| #769 | SR DeSoto III | DeSoto, GA | 134.6 GWh |
| #770 | SR McKellar | Denmark, TN | 134.5 GWh |
| #771 | Mesquite Solar 5, LLC | Tonopah, AZ | 124.9 GWh |
| #772 | Balm Solar | Wimauma, FL | 134.4 GWh |
| #774 | Foxglove Solar | Middletown, VA | 133.9 GWh |
| #775 | Trailside Solar Center | Elkton, FL | 133.6 GWh |
| #776 | Twin Lakes | Interlachen, FL | 133.6 GWh |
| #777 | Paddock Solar | Beloit, WI | 133.6 GWh |
| #778 | North Star Solar | Mendota, CA | 133.2 GWh |
| #779 | Interstate Solar Energy Center | Ft. Pierce, FL | 133.1 GWh |
| #780 | Blue Cypress Solar Energy Center | Vero Beach, FL | 132.9 GWh |
| #781 | Route 66 Energy Center, LLC | San Fidel, NM | 132.9 GWh |
| #782 | Loggerhead Solar Energy Center | Port St. Lucie, FL | 132.6 GWh |
| #783 | Moffett Solar Project | Ridgeland, SC | 132.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Camino Solar Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Wind Energy Center I | Mojave, CA | 399.8 GWh | 8.8 mi |
| BigBeau Solar, LLC | Rosamond, CA | 330.3 GWh | 5.8 mi |
| Catalina Solar LLC | Rosamond, CA | 264.9 GWh | 6.2 mi |
| Chaparral Springs | Rosamond, CA | 406.7 GWh | 8.1 mi |
| Golden Field Solar III, LLC | Rosamond, CA | 544.9 GWh | 6.4 mi |
| Golden Fields Solar I, LLC | Rosamond, CA | 139.3 GWh | 7.1 mi |
| Kingbird A Solar LLC | Rosamond, CA | 38.2 GWh | 7.7 mi |
| Kingbird B Solar, LLC | Rosamond, CA | 55.2 GWh | 7.3 mi |
| Manzana Wind LLC | Rosamond, CA | 519.3 GWh | 1.1 mi |
| North Rosamond Solar LLC | Rosamond, CA | 358.7 GWh | 5.9 mi |
| Pacific Wind LLC | Rosamond, CA | 294.7 GWh | 2.8 mi |
| RE Astoria | Rosamond, CA | 189.6 GWh | 6 mi |
| RE Astoria 2 | Rosamond, CA | 185.7 GWh | 6.8 mi |
| RE Garland | Rosamond, CA | 509.7 GWh | 8.6 mi |
| RE Garland A | Rosamond, CA | 56.7 GWh | 8.1 mi |
| Rosamond South 1 | Rosamond, CA | 370.3 GWh | 7.1 mi |
| Solar Star 1 | Rosamond, CA | 888.9 GWh | 8.1 mi |
| Solar Star 2 | Rosamond, CA | 761.2 GWh | 7.6 mi |
| Solar Star California, XLI, LLC | Rosamond, CA | 138.1 GWh | 7.1 mi |
| Valentine Solar, LLC | Rosamond, CA | 270.4 GWh | 3.8 mi |