Voyager Wind I
7021 Oak Creek Road, Mojave, CA 93501Plant Summary Information
Voyager Wind I is ranked #7 out of 111 wind farms in California in terms of total annual net electricity generation.
Voyager Wind I generated 82.2 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Voyager Wind I |
|---|---|
| Utility Name | Terra-Gen Operating Co-Wind |
| Location | Kern County, CA |
| Initial Operation Date | December 2019 |
| Last Update | Oct 2025 |
| Annual Generation | 406.4 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #1,560 out of 12,553 Power Plants Nationwide | |
| Ranked #445 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #107 out of 1,601 California Power Plants | |
| Ranked #7 out of 111 California Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Terra-Gen Operating Co LLC (2016 to 2017) Terra-Gen Operating Co-Wind (2018 to 2024) |
Map of Voyager Wind I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Voyager Wind I.
Monthly Net Generation for Voyager Wind I
Voyager Wind I Details
| Summary Information | |
|---|---|
| Plant Name | Voyager Wind I (60594) |
| Plant Address | 7021 Oak Creek Road, Mojave, CA 93501 |
| Utility | Terra-Gen Operating Co-Wind (2770) |
| Latitude, Longitude | 35.04606, -118.28273 |
| Generation Dates on File | Dec 2019 to Oct 2025 |
| Initial Operation Date | December 2019 |
| Annual Generation | 406.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 16-31-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator VYGR1 Details Operating December 2019
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 131.1 MW |
| Summer Capacity | 131.1 MW |
| Winter Capacity | 131.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 38 |
| Turbine Details | |
| Number Of Turbines | 38 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V112-3.45 |
| Design Wind Speed | 22 MPH |
| Wind Quality Class | 1 - High Wind |
| Turbine Hub Height Feet | 275 |
Voyager Wind I Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #435 | NedPower Mount Storm | Mount Storm, WV | 417.0 GWh |
| #436 | Leaning Juniper Wind Power II | Arlington, OR | 416.6 GWh |
| #437 | Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh |
| #438 | Smoky Hills Wind Project Phase II | Lincoln, KS | 414.3 GWh |
| #439 | Senate Wind LLC | Bryson, TX | 413.7 GWh |
| #440 | Cimarron Wind Energy LLC | Cimmaron, KS | 413.6 GWh |
| #441 | Morning Light Wind Farm | Adair, IA | 413.3 GWh |
| #442 | Glass Sands Wind Facility | Sulphur, OK | 409.3 GWh |
| #443 | Judith Gap Wind Energy Center | Harlowton, MT | 408.7 GWh |
| #444 | Camp Grove Wind Farm | Wyoming, IL | 406.4 GWh |
| #446 | Los Vientos Windpower IV | Rio Grande City, TX | 406.4 GWh |
| #447 | Post Oak Wind LLC | Abilene, TX | 406.3 GWh |
| #448 | Post Rock Wind Power Project, LLC | Ellsworth, KS | 406.0 GWh |
| #449 | Los Vientos Wind 1A | Sebastian, TX | 403.1 GWh |
| #450 | Rattlesnake Flat | Ritzville, WA | 402.5 GWh |
| #451 | Panther Creek Wind Farm II | Big Spring, TX | 402.1 GWh |
| #452 | Glenrock | Glenrock, WY | 401.0 GWh |
| #453 | Milford Wind Corridor I LLC | Milford, UT | 400.0 GWh |
| #454 | Seven Mile Hill | Medicine Bow, WY | 399.8 GWh |
| #455 | Tuolumne Wind Project | Goldendale, WA | 399.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Voyager Wind I.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Wind Energy Center II | Mojave, CA | 364.6 GWh | 1.7 mi |
| Alta Wind Energy Center III | Mojave, CA | 363.2 GWh | 1.7 mi |
| Alta Wind VIII | Mojave, CA | 222.0 GWh | 3 mi |
| Cameron Ridge LLC | Mojave, CA | 144.0 GWh | 2.7 mi |
| Coram Energy LLC (4.5MW) | Tehachapi, CA | 9.5 GWh | 1.7 mi |
| Mojave 16/17/18 | Mojave, CA | 73.9 GWh | 1.1 mi |
| Mojave 3/4/5 | Mojave, CA | 132.8 GWh | 1.5 mi |
| Mustang Hills LLC | Mojave, CA | 301.5 GWh | 1.2 mi |
| Oak Creek Energy Systems I | Mojave, CA | 54.5 GWh | 0.4 mi |
| Oasis Alta | Mojave, CA | 57.0 GWh | 1 mi |
| Oasis Wind | Mojave, CA | 238.4 GWh | 1.2 mi |
| Ridgetop | Mojave, CA | 145.9 GWh | 2.7 mi |
| Ridgetop Energy LLC | Mojave, CA | 27.0 GWh | 2.5 mi |
| Rising Tree Wind Farm III | Mojave, CA | 261.4 GWh | 2.4 mi |
| SEPV Mojave West | Mojave, CA | 53.5 GWh | 1.6 mi |
| TPC Windfarms LLC | Mojave, CA | 46.5 GWh | 1.5 mi |
| Voyager Wind II | Mojave, CA | 496.4 GWh | 2 mi |
| Voyager Wind III | Mojave, CA | 139.4 GWh | 1.4 mi |
| Voyager Wind IV | Mojave, CA | 80.9 GWh | 2.9 mi |
| Windhub Solar A LLC | Mojave, CA | 46.6 GWh | 1.8 mi |