Desert Harvest, LLC
22102 Kaiser Road, Desert Center, CA 92239Plant Summary Information
Desert Harvest, LLC is ranked #88 out of 849 solar farms in California in terms of total annual net electricity generation.
Desert Harvest, LLC generated 69.9 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Desert Harvest, LLC |
|---|---|
| Utility Name | Desert Harvest, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | December 2020 |
| Last Update | Sep 2025 |
| Annual Generation | 231.7 GWh |
| Annual Consumption | 863.5 k MMBtu |
| Ranked #2,291 out of 12,539 Power Plants Nationwide | |
| Ranked #347 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #236 out of 1,600 California Power Plants | |
| Ranked #88 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Desert Harvest, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Desert Harvest, LLC.
Monthly Net Generation for Desert Harvest, LLC
Desert Harvest, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Desert Harvest, LLC (62177) |
| Plant Address | 22102 Kaiser Road, Desert Center, CA 92239 |
| Utility | Desert Harvest, LLC (61709) |
| Latitude, Longitude | 33.8, -115.38 |
| Generation Dates on File | Nov 2020 to Sep 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 231.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator DH001 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 80 MW |
| Summer Capacity | 80 MW |
| Winter Capacity | 80 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 113.8 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Desert Harvest, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #337 | Pleasant Creek Unit 2 | Palo, IA | 236.8 GWh |
| #338 | Franklin Solar Hybrid | Twin Falls, ID | 236.7 GWh |
| #339 | Prairie Ronde Solar Farm | Opelousas, LA | 236.7 GWh |
| #340 | SR Lumpkin | Lumpkin, GA | 235.1 GWh |
| #341 | Daybreak Solar | Maupin, OR | 234.5 GWh |
| #342 | Clearview Solar 1 | Quincy, OH | 234.4 GWh |
| #343 | RE Mustang LLC | Lemoore, CA | 220.6 GWh |
| #344 | Dressor Plains Solar, LLC | Herrick, IL | 234.0 GWh |
| #345 | Unbridled Solar | Robards, KY | 232.4 GWh |
| #346 | Wagyu | Damon, TX | 232.0 GWh |
| #348 | Ivanpah 3 | Nipton, CA | 240.8 GWh |
| #349 | Prairie State Solar Project | Swanwick Township, IL | 231.1 GWh |
| #350 | San Pablo Raceway | Lancaster, CA | 231.0 GWh |
| #351 | Comanche Solar | Pueblo, CO | 230.4 GWh |
| #352 | Albemarle Beach Solar | Roper, NC | 229.9 GWh |
| #353 | Bright Arrow Solar, LLC | Sulphur Springs, TX | 226.3 GWh |
| #354 | SR Arlington II | Blakely, GA | 228.4 GWh |
| #355 | Swift Air Solar I | Goldsmith, TX | 228.1 GWh |
| #356 | Harquahala Sun Solar Project | Tonopah, AZ | 228.0 GWh |
| #357 | Walnut Bend Solar Station PV | Moro, AR | 227.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Desert Harvest, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arica Solar | Desert Center, CA | 719.0 GWh | 7.8 mi |
| Arlington Energy Center II | Blythe, CA | 633.4 GWh | 35.6 mi |
| Arlington Energy Center III | Blythe, CA | 321.0 GWh | 35.6 mi |
| Athos Solar Project | Desert Center, CA | 703.3 GWh | 3.7 mi |
| Chuckawalla Solar | Blythe, CA | 7.1 GWh | 31 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 1.4 GWh | 31.8 mi |
| Desert Harvest II LLC | Desert Center, CA | 181.4 GWh | 0 mi |
| Desert Sunlight 250, LLC | Desert Center, CA | 555.7 GWh | 0.9 mi |
| Desert Sunlight 300, LLC | Desert Center, CA | 666.9 GWh | 1.8 mi |
| Genesis Solar Energy Project | Blythe, CA | 623.0 GWh | 23.8 mi |
| Ironwood Solar LLC | Blythe, CA | 7.5 GWh | 31.1 mi |
| Maverick Solar 4, LLC | Desert Center, CA | 264.8 GWh | 6.9 mi |
| Maverick Solar 6, LLC | Desert Center, CA | 245.0 GWh | 6.9 mi |
| Maverick Solar 7, LLC | Desert Center, CA | 336.8 GWh | 6.9 mi |
| Maverick Solar, LLC | Desert Center, CA | 371.6 GWh | 6.9 mi |
| Oberon II Solar Project | Desert Center, CA | 598.4 GWh | 4.9 mi |
| Oberon Solar Project | Desert Center, CA | 581.0 GWh | 4.9 mi |
| SE Athos II, LLC | Desert Center, CA | 565.4 GWh | 3.7 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 996.0 MWh | 31.1 mi |
| Victory Pass | Desert Center, CA | 609.7 GWh | 7.8 mi |