Chestnut
TBD, Lemoore, CA 93266Plant Summary Information
Chestnut is ranked #37 out of 818 solar farms in California in terms of total annual net electricity generation.
Chestnut generated 103.4 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Chestnut |
---|---|
Utility Name | Castanea Project LLC |
Location | Kings County, CA |
Initial Operation Date | December 2023 |
Last Update | May 2025 |
Annual Generation | 374.8 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,624 out of 12,312 Power Plants Nationwide | |
Ranked #125 out of 6,191 Solar Power Plants Nationwide | |
Ranked #123 out of 1,568 California Power Plants | |
Ranked #37 out of 818 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Chestnut Westside, LLC (2019 to 2023) Castanea Project LLC (2024 to 2024) |
Map of Chestnut
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chestnut.
Monthly Net Generation for Chestnut
Chestnut Details
Summary Information | |
---|---|
Plant Name | Chestnut (63849) |
Plant Address | TBD, Lemoore, CA 93266 |
Utility | Castanea Project LLC (63526) |
Latitude, Longitude | 36.16016, -119.90494 |
Generation Dates on File | Jan 2024 to May 2025 |
Initial Operation Date | December 2023 |
Annual Generation | 374.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG24-58-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator BESS1 Details Operating December 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 540 |
---|---|
Maximum Charge Rate | 135 MW |
Maximum Discharge Rate | 135 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 135 |
Storage Enclosure Type | CS |
Arbitrage | P |
Frequency Regulation | Yes |
Ac Coupled | No |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Generator CHNUT Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 150.6 MW |
Summer Capacity | 150.6 MW |
Winter Capacity | 150.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 210 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Chestnut Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#115 | Big Cypress Solar, LLC | Crawfordsville, AR | 413.4 GWh |
#116 | Brazoria County Solar Project (Danciger) | Damon, TX | 413.1 GWh |
#117 | Rambler | San Angelo, TX | 411.8 GWh |
#118 | Tres Bahias | Port Lavaca, TX | 410.1 GWh |
#119 | Mount Signal Solar Farm II | Calexico, CA | 407.0 GWh |
#120 | Castle Gap Solar Hybrid | McCarney, TX | 405.7 GWh |
#121 | Riverstart Solar Park LLC | Modoc, IN | 405.0 GWh |
#122 | Yellow Pine Solar | Enterprise, NV | 389.3 GWh |
#123 | Sun Streams, LLC | Arlington, AZ | 402.1 GWh |
#124 | Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh |
#126 | Big Plain Solar, LLC | London, OH | 399.0 GWh |
#127 | Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh |
#128 | Mustang Two | Lemoore, CA | 398.0 GWh |
#129 | Yellow Pine II | Enterprise, NV | 382.7 GWh |
#130 | Dry Lake Solar Energy Center | Moapa, NV | 380.7 GWh |
#131 | Samson Solar Energy | Cunningham, TX | 394.6 GWh |
#132 | North Rosamond Solar LLC | Rosamond, CA | 392.2 GWh |
#133 | Buena Vista Energy Center | Chaparral, NM | 387.8 GWh |
#134 | Shakes Solar | Carrizo Springs, TX | 389.8 GWh |
#135 | Cavalry Solar Hybrid | Monon, IN | 381.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chestnut.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Almond | Lemoore, CA | 39.2 GWh | 3.6 mi |
American Kings Solar, LLC | Lemoore, CA | 329.8 GWh | 5.5 mi |
Aquamarine | Lemoore, CA | 615.6 GWh | 2 mi |
Electrolyte BESS | Lemoore, CA | 347.0 MWh | 5.5 mi |
Henrietta Peaker | Lemoore, CA | 10.5 GWh | 5.5 mi |
Henrietta Solar Project | Lemoore, CA | 218.0 GWh | 6.9 mi |
Huron Solar Station | Huron, CA | 28.8 GWh | 7.2 mi |
Java Solar, LLC | Lemoore, CA | 27.2 GWh | 7.1 mi |
Kettleman Solar -Centaurus | Kettleman City, CA | 37.7 GWh | 7.9 mi |
Lemoore 1 | Lemoore, CA | 1.4 GWh | 9 mi |
Lemoore West | Lemoore, CA | 14.4 GWh | 10.7 mi |
Mustang Two | Lemoore, CA | 398.0 GWh | 3.9 mi |
RE Kansas Solar, LLC | Lemoore, CA | 35.7 GWh | 7.2 mi |
RE Kansas South LLC | Lemoore, CA | 49.2 GWh | 6 mi |
RE Kent South, LLC | Lemoore, CA | 44.3 GWh | 4.6 mi |
RE Mustang LLC | Lemoore, CA | 220.6 GWh | 4.3 mi |
Slate Hybrid | Stratford, CA | 711.1 GWh | 4.6 mi |
Solar Blue | Lemoore, CA | 640.9 GWh | 1 mi |
Westlands Solar PV Farm | Huron, CA | 37.8 GWh | 9.7 mi |
Westside Solar Power PV1 | Lemoore, CA | 4.9 GWh | 4.1 mi |