Chestnut
TBD, Lemoore, CA 93266Plant Summary Information
Chestnut is ranked #42 out of 854 solar farms in California in terms of total annual net electricity generation.
Chestnut generated 43.1 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Chestnut |
|---|---|
| Utility Name | Castanea Project LLC |
| Location | Kings County, CA |
| Initial Operation Date | December 2023 |
| Last Update | Feb 2026 |
| Annual Generation | 372.0 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,696 out of 12,637 Power Plants Nationwide | |
| Ranked #171 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #126 out of 1,603 California Power Plants | |
| Ranked #42 out of 854 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Chestnut Westside, LLC (2019 to 2023) Castanea Project LLC (2024 to 2024) |
Map of Chestnut
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chestnut.
Monthly Net Generation for Chestnut
Monthly Plant Fuel Consumption for Chestnut
Chestnut Details
| Summary Information | |
|---|---|
| Plant Name | Chestnut (63849) |
| Plant Address | TBD, Lemoore, CA 93266 |
| Utility | Castanea Project LLC (63526) |
| Latitude, Longitude | 36.16016, -119.90494 |
| Generation Dates on File | Jan 2024 to Feb 2026 |
| Initial Operation Date | December 2023 |
| Annual Generation | 372.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG24-58-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator BESS1 Details Operating December 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 135 MW |
| Summer Capacity | 135 MW |
| Winter Capacity | 135 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 540 |
|---|---|
| Maximum Charge Rate | 135 MW |
| Maximum Discharge Rate | 135 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 135 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Frequency Regulation | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Generator CHNUT Details Operating December 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150.6 MW |
| Summer Capacity | 150.6 MW |
| Winter Capacity | 150.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 210 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Chestnut Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #161 | Sandrini Solar 200 | Mettler, CA | 411.1 GWh |
| #162 | Sun Streams, LLC | Arlington, AZ | 409.9 GWh |
| #163 | Oak Ridge Solar | Oak Ridge, LA | 406.9 GWh |
| #164 | Sherco Solar I | Clear Lake, MN | 406.4 GWh |
| #165 | Wright Solar Park | Los Banos, CA | 403.3 GWh |
| #166 | Mount Signal Solar Farm II | Calexico, CA | 401.9 GWh |
| #167 | Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh |
| #168 | Crane Solar Project | Crane, TX | 401.1 GWh |
| #169 | Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh |
| #170 | Misae Solar | Childress, TX | 398.9 GWh |
| #172 | Crooked Lake Solar, LLC | Blytheville, AR | 394.6 GWh |
| #173 | Serrano | Marana, AZ | 372.3 GWh |
| #174 | North Rosamond Solar LLC | Rosamond, CA | 391.4 GWh |
| #175 | Riverstart Solar Park LLC | Modoc, IN | 390.5 GWh |
| #176 | Mustang Two | Lemoore, CA | 390.1 GWh |
| #177 | Shakes Solar | Carrizo Springs, TX | 389.3 GWh |
| #178 | Big Plain Solar, LLC | London, OH | 389.3 GWh |
| #179 | Scarlet II Hybrid | Cantua Creek, CA | 367.8 GWh |
| #180 | Madison Fields Solar Project, LLC | Irwin, OH | 387.4 GWh |
| #181 | Buena Vista Energy Center | Chaparral, NM | 384.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chestnut.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Almond | Lemoore, CA | 39.2 GWh | 3.6 mi |
| American Kings Solar, LLC | Lemoore, CA | 315.1 GWh | 5.5 mi |
| Aquamarine | Lemoore, CA | 647.4 GWh | 2 mi |
| Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 297.8 GWh | 11.1 mi |
| Henrietta Peaker | Lemoore, CA | 4.2 GWh | 5.5 mi |
| Henrietta Solar Project | Lemoore, CA | 218.0 GWh | 6.9 mi |
| Huron Solar Station | Huron, CA | 28.8 GWh | 7.2 mi |
| Java Solar, LLC | Lemoore, CA | 27.2 GWh | 7.1 mi |
| Kettleman Solar -Centaurus | Kettleman City, CA | 40.7 GWh | 7.9 mi |
| Lemoore 1 | Lemoore, CA | 1.4 GWh | 9 mi |
| Lemoore West | Lemoore, CA | 14.4 GWh | 10.7 mi |
| Mustang Two | Lemoore, CA | 390.1 GWh | 3.9 mi |
| RE Kansas Solar, LLC | Lemoore, CA | 35.7 GWh | 7.2 mi |
| RE Kansas South LLC | Lemoore, CA | 49.2 GWh | 6 mi |
| RE Kent South, LLC | Lemoore, CA | 44.3 GWh | 4.6 mi |
| RE Mustang LLC | Lemoore, CA | 220.6 GWh | 4.3 mi |
| Slate Hybrid | Stratford, CA | 713.1 GWh | 4.6 mi |
| Solar Blue | Lemoore, CA | 641.8 GWh | 1 mi |
| Westlands Solar PV Farm | Huron, CA | 33.9 GWh | 9.7 mi |
| Westside Solar Power PV1 | Lemoore, CA | 4.9 GWh | 4.1 mi |