Chaparral Springs
11137 Rosamond Blvd, Rosamond, CA 93560Plant Summary Information
Chaparral Springs is ranked #41 out of 917 solar farms in California in terms of total annual net electricity generation.
Chaparral Springs generated 138.1 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Chaparral Springs |
|---|---|
| Utility Name | Leeward Asset Management, LLC |
| Location | Kern County, CA |
| Initial Operation Date | April 2025 |
| Last Update | Aug 2026 |
| Annual Generation | 398.1 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,678 out of 13,301 Power Plants Nationwide | |
| Ranked #200 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #117 out of 1,641 California Power Plants | |
| Ranked #41 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Chaparral Solar, LLC (2020 to 2020) Leeward Asset Management, LLC (2021 to 2025) |
Map of Chaparral Springs
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chaparral Springs.
Monthly Net Generation for Chaparral Springs
Monthly Plant Fuel Consumption for Chaparral Springs
Chaparral Springs Details
| Summary Information | |
|---|---|
| Plant Name | Chaparral Springs (64864) |
| Plant Address | 11137 Rosamond Blvd, Rosamond, CA 93560 |
| Utility | Leeward Asset Management, LLC (50123) |
| Latitude, Longitude | 34.87076, -118.3195 |
| Generation Dates on File | Feb 2023 to Aug 2026 |
| Initial Operation Date | April 2025 |
| Annual Generation | 398.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator CHAPB Details Operating April 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 52 MW |
| Summer Capacity | 52 MW |
| Winter Capacity | 52 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 208 |
|---|---|
| Maximum Charge Rate | 52 MW |
| Maximum Discharge Rate | 52 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 52 |
| Storage Enclosure Type | CS |
| Co Located Renewable Firming | P |
| Excess Wind And Solar Generation | Yes |
| DC Tightly Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 64864 |
| Direct Support Gen Id | CHAPS |
| Support T D Asset | No |
Generator CHAPS Details Operating April 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 102 MW |
| Summer Capacity | 102 MW |
| Winter Capacity | 102 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 123.24 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator GEN01 Details Operating April 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 72 MW |
| Summer Capacity | 72 MW |
| Winter Capacity | 72 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 92.83 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator WS3BA Details Operating April 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 36 MW |
| Summer Capacity | 36 MW |
| Winter Capacity | 36 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 144 |
|---|---|
| Maximum Charge Rate | 36 MW |
| Maximum Discharge Rate | 36 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 36 |
| Storage Enclosure Type | CS |
| Co Located Renewable Firming | P |
| Excess Wind And Solar Generation | Yes |
| DC Tightly Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 64864 |
| Direct Support Gen Id | GEN01 |
| Support T D Asset | No |
Chaparral Springs Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #190 | Fagus Solar Park | Childress, TX | 428.7 GWh |
| #191 | Big Star Solar, LLC (Hybrid) | Rosanky, TX | 421.7 GWh |
| #192 | Oak Ridge Solar | Oak Ridge, LA | 428.6 GWh |
| #193 | Muscle Shoals | Cherokee, AL | 428.3 GWh |
| #194 | Stoneridge Solar, LLC | Thorndale, TX | 421.9 GWh |
| #195 | Brazoria West | Damon, TX | 419.1 GWh |
| #196 | AP Sunray LLC | Knippa, TX | 418.9 GWh |
| #197 | Twiggs Solar | Dry Branch, GA | 417.9 GWh |
| #198 | Pisgah Ridge Solar, LLC | Richland, TX | 417.8 GWh |
| #199 | Golden Triangle | Lowndes, MS | 409.8 GWh |
| #201 | Misae Solar | Childress, TX | 412.8 GWh |
| #202 | Dry Lake Solar Energy Center | Moapa, NV | 396.1 GWh |
| #203 | Northern Orchard Solar PV, LLC | Taft, CA | 404.3 GWh |
| #204 | Big Cypress Solar, LLC | Crawfordsville, AR | 409.2 GWh |
| #205 | Azalea Springs Solar Park | Lufkin, TX | 408.3 GWh |
| #206 | Hickory Park Solar Hybrid | Camilla, GA | 400.6 GWh |
| #207 | Millers Branch Solar | Haskell, TX | 404.8 GWh |
| #208 | New Madrid Solar, LLC | Marston, MO | 404.1 GWh |
| #209 | Posey Solar | Mount Vernon, IN | 403.5 GWh |
| #210 | Black Hollow Sun | Auit, CO | 403.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chaparral Springs.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BigBeau Solar, LLC | Rosamond, CA | 322.4 GWh | 2.9 mi |
| Catalina Solar 2, LLC | Rosamond, CA | 55.4 GWh | 4.5 mi |
| Catalina Solar LLC | Rosamond, CA | 264.9 GWh | 4.7 mi |
| Estrella Solar & Storage | Lancaster, CA | 155.3 GWh | 4.4 mi |
| Golden Field Solar III, LLC | Rosamond, CA | 527.3 GWh | 4.6 mi |
| Golden Fields Solar I, LLC | Rosamond, CA | 135.0 GWh | 4.4 mi |
| Kingbird A Solar LLC | Rosamond, CA | 38.2 GWh | 7.3 mi |
| Kingbird B Solar, LLC | Rosamond, CA | 55.2 GWh | 7.5 mi |
| North Rosamond Solar LLC | Rosamond, CA | 346.7 GWh | 3.5 mi |
| Pacific Wind LLC | Rosamond, CA | 294.7 GWh | 6.6 mi |
| Rabbitbrush Solar, LLC | Rosamond, CA | 250.5 GWh | 2.8 mi |
| Raceway Solar & Storage | Lancaster, CA | 351.4 GWh | 2.7 mi |
| RE Rosamond One LLC | Rosamond, CA | 51.2 GWh | 4.6 mi |
| RE Rosamond Two LLC | Rosamond, CA | 48.6 GWh | 5 mi |
| Rosamond South 1 | Rosamond, CA | 416.1 GWh | 3.9 mi |
| Solar Star 1 | Rosamond, CA | 879.1 GWh | 6 mi |
| Solar Star 2 | Rosamond, CA | 769.1 GWh | 2.4 mi |
| Solar Star California, XLI, LLC | Rosamond, CA | 133.9 GWh | 4.4 mi |
| Valentine Solar, LLC | Rosamond, CA | 267.0 GWh | 4.3 mi |
| Willow Spring Solar, LLC | Rosamond, CA | 229.7 GWh | 3.2 mi |