Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Sunny Cow Solar, LLC | Headwater Energy, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 5.0 GWh | Sep 2023 | Dec 2025 | Solar |
| Case Vander Eyk, Jr Dairy Solar | Bravo REC Management LLC | Pixley, CA | California Independent System Operator (CISO) | 2.1 GWh | Sep 2023 | Dec 2025 | Solar |
| Toyota Long Beach Trigen | Long Beach Trigen, LLC | Long Beach, CA | California Independent System Operator (CISO) | 13.4 GWh | Oct 2023 | Dec 2025 | Other Biomass Gas |
| CA-DGS RFP-Salinas Valley State Prison | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 7.8 GWh | Oct 2023 | Dec 2025 | Solar |
| Crystal Farms Local Solar | Agilitas Energy, Inc. | San Joaquin, CA | California Independent System Operator (CISO) | 9.2 GWh | Oct 2023 | Dec 2025 | Solar |
| Double J Dairy Array | Bravo REC Management LLC | Visalia, CA | California Independent System Operator (CISO) | 8.5 GWh | Oct 2023 | Dec 2025 | Solar |
| Wheeler Ridge 2 | Madison Energy Investments LLC | Arvin, CA | California Independent System Operator (CISO) | 13.8 GWh | Oct 2023 | Dec 2025 | Solar |
| Cabrillo College | Forefront Power, LLC | Aptos, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2023 | Dec 2025 | Solar |
| North Kern 3 | Madison Energy Investments LLC | Bakersfield, CA | California Independent System Operator (CISO) | 13.6 GWh | Nov 2023 | Dec 2025 | Solar |
| GreenStruxure BBU004, LLC | ClearGen LLC | Montebello, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2023 | Dec 2025 | Solar |
| Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 185.9 GWh | Nov 2023 | Aug 2026 | Wind |
| Solar Blue | Westlands Solar Blue | Lemoore, CA | California Independent System Operator (CISO) | 645.2 GWh | Nov 2023 | Aug 2026 | Solar |
| Chestnut | Chestnut Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 358.1 GWh | Nov 2023 | Aug 2026 | Solar |
| Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 482.2 GWh | Nov 2023 | Aug 2026 | Solar |
| Alta Sea | Signal Street Operating, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2023 | Dec 2025 | Solar |
| Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 155.3 GWh | Nov 2023 | Aug 2026 | Solar |
| SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2023 | Dec 2025 | Solar |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 1.9 GWh | Dec 2023 | Dec 2025 | Solar |
| CA-DGS RFP-Pleasant Valley State Prison | Forefront Power, LLC | Coalinga, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2023 | Dec 2025 | Solar |
| Amazon Bakersfield 1 Solar Project | Solar Star Prime 3, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 8.3 GWh | Dec 2023 | Dec 2025 | Solar |
| Paso Robles - Municipal Airport | Onyx Asset Services Group | Paso Robles, CA | California Independent System Operator (CISO) | 7.6 GWh | Dec 2023 | Dec 2025 | Solar |
| City of Long Beach Airport Lot A & B | Solar DG CA Long Beach, LLC | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Jan 2024 | Dec 2025 | Solar |
| Harris Farms Solar Facility | Harris Farms Inc | Coalinga, CA | California Independent System Operator (CISO) | 3.2 GWh | Feb 2024 | Dec 2025 | Solar |
| CA-DGS- RFP-Correctional Training Fac | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2024 | Dec 2025 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 561.4 GWh | Feb 2024 | Aug 2026 | Solar |
| Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 722.5 GWh | Feb 2024 | Aug 2026 | Solar |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2024 | Dec 2025 | Solar |
| Visalia CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 7.7 GWh | Feb 2024 | Dec 2025 | Solar |
| CA-DGS-California Correctional Inst | Forefront Power, LLC | Tehachapi, CA | California Independent System Operator (CISO) | 3.8 GWh | Mar 2024 | Dec 2025 | Solar |
| Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 466.3 GWh | Mar 2024 | Aug 2026 | Solar |
| CA Jurupa Valley 3251 De Forest Circle | Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 8.5 GWh | Mar 2024 | Dec 2025 | Solar |
| ERock MID Claribel Generation Station | Enchanted Rock | Modesto, CA | Balancing Authority of Northern California (BANC) | 3.4 GWh | Mar 2024 | Dec 2025 | Natural Gas |
| Google Bayhill Solar PV and Microgrid | Google, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 651.0 MWh | Mar 2024 | Dec 2025 | Solar |
| Amazon SAN3 Solar Project | Solar Star Prime 4 LLC | San Diego, CA | California Independent System Operator (CISO) | 8.4 GWh | Apr 2024 | Dec 2025 | Solar |
| Tejon Castac Water District Solar | CTMW Solar, LLC | Arvin, CA | California Independent System Operator (CISO) | 3.8 GWh | Apr 2024 | Dec 2025 | Solar |
| Sutter Home Winery TCC | REC SHW, LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2024 | Dec 2025 | Solar |
| Vikings Energy Farm | Vikings Energy Farm, LLC | Holtville, CA | Imperial Irrigation District (IID) | 287.4 GWh | Apr 2024 | Aug 2026 | Solar |
| Baldy Mesa Solar & Storage | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 293.1 GWh | Apr 2024 | Aug 2026 | Solar |
| Enchanted Rock Turlock Irrigation Distri | Enchanted Rock | Patterson, CA | Turlock Irrigation District (TIDC) | 2.5 GWh | Apr 2024 | Dec 2025 | Natural Gas |
| Raceway Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 351.4 GWh | Apr 2024 | Aug 2026 | Solar |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 469.3 GWh | May 2024 | Aug 2026 | Solar |
| Fresno Community Solar | Agilitas Energy, Inc. | Fresno, CA | California Independent System Operator (CISO) | 16.9 GWh | May 2024 | Dec 2025 | Solar |
| Paulsell | Crow Creek Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 47.4 GWh | May 2024 | Aug 2026 | Solar |
| Mesa Wind Repower | Mesa Wind Repower | Whitewater, CA | California Independent System Operator (CISO) | 80.1 GWh | May 2024 | Dec 2024 | Wind |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 388.0 MWh | May 2024 | Dec 2025 | Solar |
| River Ranch Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 995.0 MWh | May 2024 | Dec 2025 | Solar |
| Costa View Farms | 127 CVF, LLC | Madera, CA | California Independent System Operator (CISO) | 10.9 GWh | May 2024 | Dec 2025 | Solar |
| Open Sky Ranch Inc | Bravo REC Management LLC | Riverdale, CA | California Independent System Operator (CISO) | 4.0 GWh | Jun 2024 | Dec 2025 | Solar |
| Dixie Creek Dairy Solar | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 5.8 GWh | Jun 2024 | Dec 2025 | Solar |
| North Kern 2 | Madison Energy Investments LLC | City of Shafter, CA | California Independent System Operator (CISO) | 6.1 GWh | Jun 2024 | Dec 2025 | Solar |
| Open Sky Dairy | Renewable Solar, Inc | Riverdale, CA | California Independent System Operator (CISO) | 418.8 MWh | Jun 2024 | Dec 2025 | Solar |
| IPC 25 Solar | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 4.9 GWh | Jun 2024 | Dec 2025 | Solar |
| Camp San Luis Obispo | Ecoplexus, Inc | San Luis Obispo, CA | California Independent System Operator (CISO) | 2.4 GWh | Jul 2024 | Dec 2025 | Solar |
| IGS OXR1 | Greenbacker Renewable Energy Corporation | Oxnard, CA | California Independent System Operator (CISO) | 9.3 GWh | Jul 2024 | Dec 2025 | Solar |
| TWC | Bravo REC Management LLC | Tulare, CA | California Independent System Operator (CISO) | 2.2 GWh | Jul 2024 | Dec 2025 | Solar |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2024 | Dec 2025 | Solar |
| Blue Moon Farms | Bravo REC Management LLC | Tipton, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2024 | Dec 2025 | Solar |
| Avalon Dairy | Renewable Solar, Inc | Wasco, CA | California Independent System Operator (CISO) | 792.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Superior Almond Hulling | Renewable Solar, Inc | Cantua Creek, CA | California Independent System Operator (CISO) | 472.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Waterman Turnout Hydroelectric | San Bernardino Valley Mun. Water Dist. | San Bernardino, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2024 | Dec 2025 | Water |
| CA Manteca 730 Spreckels Ave | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC | Manteca, CA | California Independent System Operator (CISO) | 100.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Tulare CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 6.4 GWh | Sep 2024 | Dec 2025 | Solar |
| Pivot Energy PPA 22 | Pivot Energy | Visalia, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Highway 43 1887-WD | Standard Solar | Shafter, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Kern Sunset 1886-WD | Standard Solar | Bakersfield, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2024 | Dec 2025 | Solar |
| CalPortland Company Mojave Wind | CalPortland Company | Mojave, CA | California Independent System Operator (CISO) | 24.4 GWh | Oct 2024 | Dec 2025 | Wind |
| Eland Solar & Storage Center, Phase 1 Hy | 68SF 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 697.9 GWh | Oct 2024 | Aug 2026 | Solar |
| West Tambo Clean Power II | West Tambo Clean Power II | Livingston, CA | California Independent System Operator (CISO) | 4.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Enchanted Rock Lodi | Enchanted Rock | Lodi, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2024 | Dec 2025 | Natural Gas |
| Bishop Ranch - BR 8-P | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Avenue 26 Solar | RPCA Solar 1, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 13.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 842.3 GWh | Nov 2024 | Aug 2026 | Solar |
| Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 500.0 GWh | Nov 2024 | Aug 2026 | Solar |
| Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 246.8 GWh | Nov 2024 | Aug 2026 | Solar |
| Kings CSG 3 LLC Community Solar | Dimension Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Baldy Mesa 2_Silver Peak Hybrid | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 111.6 GWh | Nov 2024 | Aug 2026 | Solar |
| Scarlet II Hybrid | EDPR Scarlet II LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 350.9 GWh | Nov 2024 | Aug 2026 | Solar |
| RB Inyokern Solar WDAT 1203 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 58.3 GWh | Nov 2024 | Dec 2025 | Solar |
| RB Inyokern Solar WDAT 1281 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 34.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Nachtigall 1836-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 2024 | Dec 2025 | Solar |
| City of Atwater NEM | SoCore Energy LLC | Atwater, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Tipton 1 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 7.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Tipton 2 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Kern Del Oro | REC KDO, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2024 | Dec 2025 | Solar |
| PAC Aviation Solar | PAC Aviation | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2024 | Dec 2025 | Solar |
| KP Ontario Vineyard Solar | KP Ontario Vineyard O.P. Surgicenter B Solar LLC | Ontario, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Central San | REC CSD, LLC | Martinez, CA | California Independent System Operator (CISO) | 3.0 GWh | Dec 2024 | Dec 2025 | Solar |
| CA - Fresno, City of - SE Surface WTP | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 7.1 GWh | Dec 2024 | Dec 2025 | Solar |
| Rexford Solar Farm | AES Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 711.8 GWh | Jan 2025 | Aug 2026 | Solar |
| East Cleveland Road Solar | RPCA Solar 7, LLC | El Nido, CA | California Independent System Operator (CISO) | 5.9 GWh | Jan 2025 | Dec 2025 | Solar |
| AM Wind Repower | AM Wind Repower LLC | Whitewater, CA | California Independent System Operator (CISO) | 90.6 GWh | Feb 2025 | Aug 2026 | Wind |
| VS BC Pacific Gateway, LLC | TRITEC Americas | Los Angeles, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2025 | Dec 2025 | Solar |
| Bishop Ranch - BR 15-DD | Alcosta Boulevard BR 15-DD Solar Project 2020, LLC | San Ramon, CA | California Independent System Operator (CISO) | 62.0 MWh | Feb 2025 | May 2025 | Solar |
| Dos Palos Clean Power | Dos Palos Clean Power LLC | Dos Palos, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2025 | Dec 2025 | Solar |
| Bishop Ranch - BR 8-O | Executive Parkway BR8-O Solar Project 2020 LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.4 GWh | Feb 2025 | Dec 2025 | Solar |
| Bishop Ranch - BR 15-CC | Alcosta Boulevard BR 15-CC Solar Project 2020, LLC | San Ramon, CA | California Independent System Operator (CISO) | 950.0 MWh | Feb 2025 | Dec 2025 | Solar |
| Community Solar Utica 1, LLC | AETS OpCo Holdings LLC | Kettleman, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2025 | Dec 2025 | Solar |
| Bear Creek Solar (Orinda) | Solar Star Bear Creek, LLC | Orinda, CA | California Independent System Operator (CISO) | 7.4 GWh | Mar 2025 | Dec 2025 | Solar |
| Rio Vista Solar | Rio Vista Executive Boat & RV Storage, LLC | Rio Vista, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2025 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on August 2026 generation numbers.| County | State Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 333 | 35.3 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Los Angeles County, CA | # 3 | 325 | 17.3 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 11.8 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| Fresno County, CA | # 8 | 128 | 7.8 TWh |
| Shasta County, CA | # 9 | 46 | 7.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.0 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| Butte County, CA | # 14 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 15 | 76 | 3.4 TWh |
| Solano County, CA | # 16 | 41 | 3.0 TWh |
| Monterey County, CA | # 17 | 29 | 3.0 TWh |
| Tuolumne County, CA | # 18 | 23 | 2.9 TWh |
| Alameda County, CA | # 19 | 52 | 2.8 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.7 TWh |
| Orange County, CA | # 21 | 59 | 2.6 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Sutter County, CA | # 25 | 8 | 1.8 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| San Joaquin County, CA | # 27 | 53 | 1.6 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Lake County, CA | # 32 | 10 | 892.8 GWh |
| Ventura County, CA | # 33 | 33 | 719.4 GWh |
| Amador County, CA | # 34 | 8 | 608.6 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Calaveras County, CA | # 36 | 6 | 524.3 GWh |
| Merced County, CA | # 37 | 33 | 493.1 GWh |
| Trinity County, CA | # 38 | 5 | 480.6 GWh |
| Humboldt County, CA | # 39 | 10 | 450.0 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Santa Barbara County, CA | # 41 | 18 | 292.9 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| San Benito County, CA | # 43 | 6 | 266.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.7 GWh |
| Yolo County, CA | # 45 | 15 | 196.6 GWh |
| San Mateo County, CA | # 46 | 11 | 133.1 GWh |
| San Francisco County, CA | # 47 | 10 | 80.3 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.7 GWh |
| Napa County, CA | # 50 | 11 | 51.2 GWh |
| Tehama County, CA | # 51 | 7 | 45.8 GWh |
| Sierra County, CA | # 52 | 3 | 28.8 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Glenn County, CA | # 55 | 2 | 12.1 GWh |