Plant Summary Information

Grossmont-Cuyamaca-Cuyamaca Col. Solar & is ranked #590 out of 849 solar farms in California in terms of total annual net electricity generation.

Grossmont-Cuyamaca-Cuyamaca Col. Solar & generated 542.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameGrossmont-Cuyamaca-Cuyamaca Col. Solar &
Utility NameForefront Power, LLC
LocationSan Diego County, CA
Initial Operation DateMarch 2024
Last Update Dec 2024
Annual Generation 2.8 GWh
Annual Consumption 9.6 k MMBtu
Ranked #9,666 out of 12,553 Power Plants Nationwide
Ranked #4,553 out of 6,410 Solar Power Plants Nationwide
Ranked #1,300 out of 1,601 California Power Plants
Ranked #590 out of 849 California Solar Power Plants
Fuel Types Solar

Map of Grossmont-Cuyamaca-Cuyamaca Col. Solar &

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grossmont-Cuyamaca-Cuyamaca Col. Solar &.

Create Your Account Today

Monthly Net Generation for Grossmont-Cuyamaca-Cuyamaca Col. Solar &

Grossmont-Cuyamaca-Cuyamaca Col. Solar & Details

Summary Information
Plant NameGrossmont-Cuyamaca-Cuyamaca Col. Solar & (66023)
Plant Address900 Rancho San Diego Parkway, El Cajon, CA 92019
UtilityForefront Power, LLC (62856)
Latitude, Longitude32.7466, -116.9389
Generation Dates on FileJan 2024 to Dec 2024
Initial Operation DateMarch 2024
Annual Generation 2.8 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number23-176-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSan Diego Gas & Electric Co (16609) CA
Grid Voltage 21.00 kV
Energy StorageYes

Generator 18009 Details Operating March 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.4 MW
Summer Capacity1.4 MW
Winter Capacity1.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2024
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle7
DC Net Capacity1.7 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.7 MW
Virtual Net Metering AgreementNo

Generator 19043 Details Operating March 2024

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2024
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Energy Storage Details
Nameplate Energy Capacity MWH1
Maximum Charge Rate1 MW
Maximum Discharge Rate1 MW
Storage TechnologyLIB
Storage Enclosure TypeCS
Co Located Renewable FirmingYes
System Peak ShavingP
Excess Wind And Solar GenerationYes
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id66023
Direct Support Gen Id18009
Support T D AssetNo

Grossmont-Cuyamaca-Cuyamaca Col. Solar & Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4543City of Long Beach Airport Lot A & BLong Beach, CA2.8 GWh
#4544Open View Solar FarmNew Haven, VT2.8 GWh
#4545SEPV 2Twentynine Palms, CA2.8 GWh
#4546Newton GroveNewton Grove, NC2.8 GWh
#4547Stetson Road Solar - Barre IBarre, MA2.8 GWh
#4548Neisler Street SolarShelby, NC2.8 GWh
#4549Ryans RanchParis, ME2.8 GWh
#4550IPC 25 SolarTracy, CA2.8 GWh
#4551Bob Wiley Detention CenterVisalia, CA2.8 GWh
#4552ASA Gouverneur NY Solar II LLCGouverneur, NY2.8 GWh
#4554SCCCD - Fresno Community CollegeFresno, CA2.8 GWh
#4555CDCR (CA) - Pleasant Valley State PrisonCoalinga, CA2.8 GWh
#4556Curtis Hill Solar CSGCharlton, MA2.8 GWh
#4557Plote SomonaukSomonauk, IL2.8 GWh
#4558Krumkill Road Solar South, LLCGuilderland, NY2.8 GWh
#4559Limerick Road Solar FarmShelburne, VT2.8 GWh
#4560Germantown Solar, LLCRural Hall, NC2.8 GWh
#4561Panda Solar NC 7, LLCFaison, NC2.8 GWh
#4562Caelum Community SolarFoley, MN2.8 GWh
#4563Atascadero State HospitalAtascadero, CA2.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Grossmont-Cuyamaca-Cuyamaca Col. Solar &.

Plant NamePlant LocationAnnual GenerationDistance
Amazon SAN3 Solar ProjectSan Diego, CA6.1 GWh12.5 mi
Border Hybrid Energy CenterSan Diego, CA14.8 GWh12.7 mi
County of San Diego COC HybridSan Diego, CA3.1 GWh12.7 mi
County of San Diego SBRCChula Vista, CA2.3 GWh11.3 mi
CP Kelco San Diego PlantSan Diego, CA73.8 GWh12.4 mi
Cuyamaca Peak Energy PlantEl Cajon, CA5.9 GWh3.9 mi
El Cajon Energy CenterEl Cajon, CA9.0 GWh3.9 mi
Grossmont CollegeEl Cajon, CA4.4 GWh6.2 mi
Grossmont HospitalLa Mesa, CA25.5 GWh4.5 mi
Grossmont HS Solar ProjectEl Cajon, CA1.8 GWh6 mi
ISH Solar Hospital SDMCSan Diego, CA1.2 GWh9.6 mi
Larkspur Energy FacilitySan Diego, CA24.4 GWh12.4 mi
Naval Hospital Medical CenterSan Diego, CA17.7 GWh12.1 mi
Otay Mesa Generating ProjectSan Diego, CA1.7 TWh11.5 mi
PFMG Solar Grossmont Helix LLCLa Mesa, CA2.0 GWh5.6 mi
Pio Pico Energy CenterSan Diego, CA65.9 GWh12 mi
San Diego - EMDF at San DiegoSan Diego, CA4.7 GWh10.9 mi
San Diego State UniversitySan Diego, CA52.8 GWh7.9 mi
SeaWorld AquaticaChula Vista, CA1.9 GWh11.7 mi
Sycamore Energy LLCSantee, CA23.1 GWh9.3 mi