CA-DGS-California Correctional Inst
24900 Highway 202, Tehachapi, CA 92179Plant Summary Information
CA-DGS-California Correctional Inst is ranked #359 out of 849 solar farms in California in terms of total annual net electricity generation.
CA-DGS-California Correctional Inst generated 1.5 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | CA-DGS-California Correctional Inst |
|---|---|
| Utility Name | Forefront Power, LLC |
| Location | Kern County, CA |
| Initial Operation Date | April 2024 |
| Last Update | Dec 2024 |
| Annual Generation | 7.3 GWh |
| Annual Consumption | 25.1 k MMBtu |
| Ranked #7,131 out of 12,539 Power Plants Nationwide | |
| Ranked #2,555 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #971 out of 1,600 California Power Plants | |
| Ranked #359 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of CA-DGS-California Correctional Inst
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CA-DGS-California Correctional Inst.
Monthly Net Generation for CA-DGS-California Correctional Inst
CA-DGS-California Correctional Inst Details
| Summary Information | |
|---|---|
| Plant Name | CA-DGS-California Correctional Inst (65105) |
| Plant Address | 24900 Highway 202, Tehachapi, CA 92179 |
| Utility | Forefront Power, LLC (62856) |
| Latitude, Longitude | 35.1135, -118.569 |
| Generation Dates on File | Mar 2024 to Dec 2024 |
| Initial Operation Date | April 2024 |
| Annual Generation | 7.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 22-673-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 21.00 kV |
| Energy Storage | No |
Generator 15111 Details Operating April 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4 MW |
| Summer Capacity | 4 MW |
| Winter Capacity | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | No |
|---|---|
| Fixed Tilt | Yes |
| Azimuth Angle | 180 |
| Tilt Angle | 2 |
| DC Net Capacity | 5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 5 MW |
| Virtual Net Metering Agreement | No |
CA-DGS-California Correctional Inst Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2545 | East Brookfield Adams Road Solar LLC CSG | East Brookfield, MA | 7.4 GWh |
| #2546 | Foreman's Hill Community Solar | Red Wing, MN | 7.4 GWh |
| #2547 | Syncarpha Palmer, LLC | Palmer, MA | 7.4 GWh |
| #2548 | New Marlborough | New Marlborough, MA | 7.4 GWh |
| #2549 | Webster Holdco Solar CSG | Webster, MN | 7.4 GWh |
| #2550 | Elizabeth Mines Solar 1 | So. Strafford, VT | 7.4 GWh |
| #2551 | White Rock Road LLC | Westerly, RI | 7.4 GWh |
| #2552 | Knapp East (CSG) | Akron, NY | 7.4 GWh |
| #2553 | South Milford Solar Plant | Milford, UT | 7.4 GWh |
| #2554 | North Run | Wrightstown, NJ | 7.3 GWh |
| #2556 | Kirkwall Holdings | Warsaw, NC | 7.3 GWh |
| #2557 | Eagle Solar | Warrenton, NC | 7.3 GWh |
| #2558 | Herbert Farm Solar | Hughesville, MD | 7.3 GWh |
| #2559 | Tamworth Holdings | Garland, NC | 7.3 GWh |
| #2560 | Fiddler's Canyon #1 | Cedar City, UT | 7.3 GWh |
| #2561 | 4Oaks | Four Oaks, NC | 7.3 GWh |
| #2562 | Warrenton I Solar | Warrenton, NC | 7.3 GWh |
| #2563 | Spanish Fork Community Solar | Spanish Fork, UT | 7.3 GWh |
| #2564 | Zeuber | Little Rock, AR | 7.3 GWh |
| #2565 | GMP Solar/Storage-Milton Hybrid | Milton, VT | 7.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CA-DGS-California Correctional Inst.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 85 A | Tehachapi, CA | 71.2 GWh | 13.9 mi |
| 85 B | Tehachapi, CA | 97.6 GWh | 13.4 mi |
| Alta Wind Energy Center I | Mojave, CA | 434.7 GWh | 13.4 mi |
| Alta Wind XI | Mojave, CA | 269.5 GWh | 10.7 mi |
| Cameron Ridge LLC | Mojave, CA | 144.0 GWh | 14.6 mi |
| Camino Solar Hybrid | Rosamond, CA | 80.2 GWh | 14.5 mi |
| Coram Energy LLC | Tehachapi, CA | 9.5 GWh | 13.1 mi |
| Coram Energy LLC (ECT) | Tehachapi, CA | 17.6 GWh | 13.4 mi |
| Coram Tehachapi | Tehachapi, CA | 4.3 GWh | 13.4 mi |
| Helzel & Schwarzhoff 86 | Tehachapi, CA | 3.3 GWh | 9.9 mi |
| Manzana Wind LLC | Rosamond, CA | 543.7 GWh | 13.8 mi |
| Point Wind | Tehachapi, CA | 234.2 GWh | 12 mi |
| Ridgetop | Mojave, CA | 145.9 GWh | 14.6 mi |
| Ridgetop Energy LLC | Mojave, CA | 27.0 GWh | 14.6 mi |
| Tehachapi Wind Resource I | Tehachapi, CA | 14.1 GWh | 10.8 mi |
| Tehachapi Wind Resource II | Tehachapi, CA | 46.1 GWh | 14.6 mi |
| Terra-Gen VG Wind LLC | Tehachapi, CA | 7.6 GWh | 10.7 mi |
| Victory Garden (Tehachapi) | Tehachapi, CA | 33.0 GWh | 10.9 mi |
| Windstar 1 | Tehachapi, CA | 263.0 GWh | 12.8 mi |
| ZCO | Tehachapi, CA | 1.4 GWh | 10.9 mi |