TWC
5535 Avenue 184, Tulare, CA 93274Plant Summary Information
TWC is ranked #686 out of 885 solar farms in California in terms of total annual net electricity generation.
TWC generated 292.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | TWC |
|---|---|
| Utility Name | Bravo REC Management LLC |
| Location | Tulare County, CA |
| Initial Operation Date | August 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 2.2 GWh |
| Annual Consumption | 7.8 k MMBtu |
| Ranked #10,574 out of 13,081 Power Plants Nationwide | |
| Ranked #5,477 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,360 out of 1,606 California Power Plants | |
| Ranked #686 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of TWC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for TWC.
Monthly Net Generation for TWC
Monthly Plant Fuel Consumption for TWC
TWC Details
| Summary Information | |
|---|---|
| Plant Name | TWC (67863) |
| Plant Address | 5535 Avenue 184, Tulare, CA 93274 |
| Utility | Bravo REC Management LLC (65949) |
| Latitude, Longitude | 36.12281, -119.44766 |
| Generation Dates on File | Jul 2024 to Dec 2025 |
| Initial Operation Date | August 2024 |
| Annual Generation | 2.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Animal Production and Aquaculture (112) |
| Sector | Industrial Non-CHP (6) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 480.00 kV |
| Energy Storage | No |
Generator TWC Details Operating August 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.2 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2024 |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 1.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.3 MW |
| Virtual Net Metering Agreement | No |
TWC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| TWC | 6658 Ave 328, Visalia, CA 93291 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5467 | Wolverine Solar | Maynard, MN | 2.2 GWh |
| #5468 | USS Slayton Solar LLC (CSG) | Slayton, MN | 2.2 GWh |
| #5469 | Curry Solar | Reidsville, GA | 2.2 GWh |
| #5470 | USS Rosebud Solar LLC | Morgan, MN | 2.2 GWh |
| #5471 | SolarClub 35 LLC | Mankato, MN | 2.2 GWh |
| #5472 | Dynamic Energy NJ - Ferrero | Somerset, NJ | 2.2 GWh |
| #5473 | MD JESSUP 7950 OCEANO AVE | Jessup, MD | 2.2 GWh |
| #5474 | Petit Jean | Clinton, AR | 2.2 GWh |
| #5475 | Chesapeake College | Wye Mills, MD | 2.2 GWh |
| #5476 | Courtland CSG LLC | Courtland, MN | 2.2 GWh |
| #5478 | Canyon Del Oro High School Solar | Oro Valley, AZ | 2.2 GWh |
| #5479 | Shuman Solar | Stoughton, MA | 2.2 GWh |
| #5480 | Terra Francesco | Ontario, CA | 2.2 GWh |
| #5481 | North Bergen Solar | North Bergen, NJ | 2.2 GWh |
| #5482 | Cedar Creek (NJ) | Egg Harbor City, NJ | 2.2 GWh |
| #5483 | Colonial Pipeline Woodbury West Deptford | West Deptford, NJ | 2.2 GWh |
| #5484 | USS Rosewood Solar LLC (CSG) | Montevideo, MN | 2.2 GWh |
| #5485 | City of Green Forest (Carroll) | Berryville, AR | 2.2 GWh |
| #5486 | Americus | Emporia, KS | 2.2 GWh |
| #5487 | Newton Rumford Landfill | Newton, MA | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding TWC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blue Moon Farms | Tipton, CA | 2.0 GWh | 7 mi |
| Canal Energy S23, LLC | Hanford, CA | 10.0 GWh | 7.3 mi |
| Case Vander Eyk, Jr Dairy Solar | Pixley, CA | 2.1 GWh | 10.8 mi |
| CDCR (CA) - Corcoran State Prison | Corcoran, CA | 7.3 GWh | 7.3 mi |
| Central CA Fuel Cell 1, LLC | Tulare, CA | 13.2 GWh | 5.9 mi |
| CID Solar, LLC | Corcoran, CA | 40.7 GWh | 6.6 mi |
| City of Tulare Water Facility | Tulare, CA | 16.3 GWh | 5.9 mi |
| Corcoran | Corcoran, CA | 1.8 GWh | 6.8 mi |
| Corcoran Irrigation District | Corcoran, CA | 4.0 GWh | 6.8 mi |
| Corcoran Solar | Corcoran, CA | 22.1 GWh | 7.1 mi |
| Corcoran Solar 2 | Corcoran, CA | 46.8 GWh | 7.6 mi |
| Corcoran Solar 3 | Corcoran, CA | 48.1 GWh | 7.9 mi |
| Cottonwood Solar, LLC (City of Corcoran) | Corcoran, CA | 20.6 GWh | 6 mi |
| Lakeside Pipeline | Hanford, CA | 8.3 GWh | 11.3 mi |
| Lone Oak | Hanford, CA | 6.0 GWh | 10.9 mi |
| Tipton 1 - (CA) | Tipton, CA | 167.0 MWh | 9 mi |
| Tipton 2 - (CA) | Tipton, CA | 2.7 GWh | 9 mi |
| Tulare 1 and 2 | Tulare, CA | 5.4 GWh | 5.6 mi |
| Tulare BioMAT Fuel Cell | Tulare, CA | 6.0 GWh | 6 mi |
| Tulare CSG LLC | Tulare, CA | 6.4 GWh | 9.5 mi |