Cabrillo College
6500 Soquel Dr, Aptos, CA 95003Plant Summary Information
Cabrillo College is ranked #813 out of 816 solar farms in California in terms of total annual net electricity generation.
Cabrillo College generated 13.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Cabrillo College |
---|---|
Utility Name | Forefront Power, LLC |
Location | Santa Cruz County, CA |
Initial Operation Date | December 2023 |
Last Update | Dec 2023 |
Annual Generation | 13.0 MWh |
Annual Consumption | 44 MMBtu |
Ranked #12,164 out of 12,288 Power Plants Nationwide | |
Ranked #6,150 out of 6,174 Solar Power Plants Nationwide | |
Ranked #1,560 out of 1,564 California Power Plants | |
Ranked #813 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Map of Cabrillo College
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cabrillo College.
Monthly Net Generation for Cabrillo College
Cabrillo College Details
Summary Information | |
---|---|
Plant Name | Cabrillo College (67179) |
Plant Address | 6500 Soquel Dr, Aptos, CA 95003 |
Utility | Forefront Power, LLC (62856) |
Latitude, Longitude | 36.98745, -121.92241 |
Generation Dates on File | Dec 2023 to Dec 2023 |
Initial Operation Date | December 2023 |
Annual Generation | 13.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator 19038 Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.4 MW |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 279 |
Tilt Angle | 5 |
DC Net Capacity | 3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 3 MW |
Virtual Net Metering Agreement | No |
Cabrillo College Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#6140 | Pika Solar | Mt. Angel, OR | 25.0 MWh |
#6141 | OR - Green Key - Gun Club | Dundee, OR | 24.0 MWh |
#6142 | Museum Drive East Solar | Grand Island, NE | 22.0 MWh |
#6143 | Glenville Solar (CSG) | Glenville, NY | 17.0 MWh |
#6144 | Novel Milbradt Solar LLC | Belview, MN | 16.0 MWh |
#6145 | Brush Creek Solar | Silverton, OR | 15.0 MWh |
#6146 | Drift Creek Solar | Silverton, OR | 15.0 MWh |
#6147 | Novel Froehle Solar LLC | Cold Spring, MN | 15.0 MWh |
#6148 | Sheesley (CSG) | Canton, NY | 15.0 MWh |
#6149 | LaFayette Solar WI, LLC | Elkhorn, WI | 15.0 MWh |
#6151 | Altamont (NY) (CSG) | Guilderland, NY | 12.0 MWh |
#6152 | Silverton Solar | Silverton, OR | 12.0 MWh |
#6153 | Sheep Solar | Turner, OR | 12.0 MWh |
#6154 | Colton Solar | Molalla, OR | 12.0 MWh |
#6155 | Interstate Solar | Gervais, OR | 12.0 MWh |
#6156 | Grand Ronde Solar | Grand Ronde, OR | 12.0 MWh |
#6157 | Improvement Dst No. 4 | Bakersfield, CA | 12.0 MWh |
#6158 | Greene Community Solar | Chenango Forks, NY | 12.0 MWh |
#6159 | Raffia Road Solar Project | Enfield, CT | 11.0 MWh |
#6160 | Dayton Cutoff Solar | McMinnville, OR | 10.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cabrillo College.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Santa Cruz Energy | Watsonville, CA | 16.5 GWh | 7.6 mi |
Dynegy Moss Landing Power Plant Hybrid | Moss Landing, CA | 3.3 TWh | 14.8 mi |
Equinix Great Oaks Blvd. Fuel Cell | San Jose, CA | 30.9 GWh | 19.1 mi |
Equinix San Jose | San Jose, CA | 16.4 GWh | 19.2 mi |
EQX010 Great Oaks Fuel Cell | San Jose, CA | 19.6 GWh | 19.2 mi |
EQX015 Great Oaks Fuel Cell | San Jose, CA | 30.6 GWh | 19.2 mi |
Extreme San Ignacio | San Jose, CA | 7.9 GWh | 18.8 mi |
Extreme Via Del Oro | San Jose, CA | 10.0 GWh | 18.9 mi |
Gilroy Peaking Energy Center | Gilroy, CA | 23.3 GWh | 21.3 mi |
Gilroy Power Plant | Gilroy, CA | 44.2 GWh | 21.3 mi |
Graniterock Quarry | Aromas, CA | 8.9 GWh | 19.2 mi |
Guadalupe Solar Farm | San Jose, CA | 1.9 GWh | 19.7 mi |
Malech Solar Farm | San Jose, CA | 4.8 GWh | 19.5 mi |
Marina Landfill Gas | Marina, CA | 22.8 GWh | 20.8 mi |
Metcalf Energy Center | San Jose, CA | 2.4 TWh | 18.8 mi |
Monterey One Water | Marina, CA | 7.3 GWh | 21.2 mi |
Monterey Regional Water Pollution Contro | Marina, CA | 1.2 GWh | 19.9 mi |
Santa Cruz Energy | Santa Cruz, CA | 4.6 GWh | 10.2 mi |
University of California Santa Cruz | Santa Cruz, CA | 35.2 GWh | 7.8 mi |
Xilinx San Jose | San Jose, CA | 8.3 GWh | 18.3 mi |