RB Inyokern Solar WDAT 1281 (CSG)
U.S. 395 & W. Inyokern Rd, Ridgecrest, CA 93527Plant Summary Information
RB Inyokern Solar WDAT 1281 (CSG) is ranked #238 out of 885 solar farms in California in terms of total annual net electricity generation.
RB Inyokern Solar WDAT 1281 (CSG) generated 6.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | RB Inyokern Solar WDAT 1281 (CSG) |
|---|---|
| Utility Name | Dimension Energy LLC |
| Location | Kern County, CA |
| Initial Operation Date | December 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 34.5 GWh |
| Annual Consumption | 117.6 k MMBtu |
| Ranked #4,671 out of 13,081 Power Plants Nationwide | |
| Ranked #1,311 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #565 out of 1,606 California Power Plants | |
| Ranked #238 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of RB Inyokern Solar WDAT 1281 (CSG)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RB Inyokern Solar WDAT 1281 (CSG).
Monthly Net Generation for RB Inyokern Solar WDAT 1281 (CSG)
Monthly Plant Fuel Consumption for RB Inyokern Solar WDAT 1281 (CSG)
RB Inyokern Solar WDAT 1281 (CSG) Details
| Summary Information | |
|---|---|
| Plant Name | RB Inyokern Solar WDAT 1281 (CSG) (67534) |
| Plant Address | U.S. 395 & W. Inyokern Rd, Ridgecrest, CA 93527 |
| Utility | Dimension Energy LLC (65677) |
| Latitude, Longitude | 35.65991, -117.81032 |
| Generation Dates on File | Jan 2025 to Dec 2025 |
| Initial Operation Date | December 2024 |
| Annual Generation | 34.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG24-76-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 33.00 kV |
| Energy Storage | No |
Generator INYO2 Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 11.9 MW |
| Summer Capacity | 11.9 MW |
| Winter Capacity | 11.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 16.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 11.9 MW |
RB Inyokern Solar WDAT 1281 (CSG) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1301 | Shawboro PV1 | Shawboro, NC | 34.9 GWh |
| #1302 | Cottontail Solar 4 | East Chillisquaque To, PA | 34.9 GWh |
| #1303 | Fort Huachuca Solar PV Project | Sierra Vista, AZ | 34.8 GWh |
| #1304 | Whitetail Solar 2 | St. Thomas, PA | 34.8 GWh |
| #1305 | Quillwort Solar | Powhatan, VA | 34.8 GWh |
| #1306 | Queen Creek Solar Farm | Queen Creek, AZ | 34.8 GWh |
| #1307 | Elk Hill Solar 1 | Mercersburg, PA | 34.7 GWh |
| #1308 | Solidago Solar | Windsor, VA | 34.6 GWh |
| #1309 | Ben Moreell Solar Farm | Tinton Falls, NJ | 34.6 GWh |
| #1310 | Nutmeg Solar | Enfield, CT | 34.5 GWh |
| #1312 | Apple Data Center - PV2 | Conover, NC | 34.5 GWh |
| #1313 | Redcrest Solar Farm | Edison, CA | 34.4 GWh |
| #1314 | NY8 - Branscomb Solar | Schaghticoke, NY | 34.3 GWh |
| #1315 | Desert Breeze Solar, LLC | Hinkley, CA | 34.0 GWh |
| #1316 | Pasquotank | Elizabeth City, NC | 34.0 GWh |
| #1317 | Capon Bridge Solar LLC | Augusta, WV | 34.0 GWh |
| #1318 | Colice Hall Solar | Ahoskie, NC | 34.0 GWh |
| #1319 | Atwell Island | Alpaugh, CA | 33.9 GWh |
| #1320 | Hyder Solar Hybrid | Hyder, AZ | 31.2 GWh |
| #1321 | SR Platte Solar Farm | Platteville, CO | 33.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RB Inyokern Solar WDAT 1281 (CSG).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Argus Cogen Plant | Trona, CA | 187.2 GWh | 25 mi |
| Beacon Solar Plant Site 2 | Cantil, CA | 107.0 GWh | 29.2 mi |
| Beacon Solar Plant Site 5 | Cantil, CA | 84.8 GWh | 31.1 mi |
| Coso Energy Developers | Inyokern, CA | 235.0 GWh | 23.7 mi |
| Coso Finance Partners | Inyokern, CA | 363.8 GWh | 26.1 mi |
| Coso Power Developers | Inyokern, CA | 315.8 GWh | 24.8 mi |
| Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 717.3 GWh | 31.6 mi |
| Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 512.9 GWh | 32 mi |
| Haiwee | Olancha, CA | 11.0 GWh | 32.1 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 125.6 GWh | 29.3 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 118.9 GWh | 30.4 mi |
| Hecate Energy Beacon Solar 4 | Cantil, CA | 114.7 GWh | 30.6 mi |
| Naval Air Weapons Station China Lake | Ridgecrest, CA | 24.2 GWh | 7.5 mi |
| North Sky River Energy LLC | Weldon, CA | 364.8 GWh | 30.2 mi |
| Pine Tree Wind Power Project | Cantil, CA | 123.0 GWh | 35.1 mi |
| RB Inyokern Solar WDAT 1203 (CSG) | Ridgecrest, CA | 58.3 GWh | 0.3 mi |
| RE Barren Ridge 1 | Mojave, CA | 164.4 GWh | 34.7 mi |
| Springbok Solar Farm 1 | Cantil, CA | 280.4 GWh | 29.5 mi |
| Springbok Solar Farm 2 | Cantil, CA | 397.1 GWh | 29.8 mi |
| Trona Solar III | Trona, CA | 5.4 GWh | 27.7 mi |