Tipton 2 - (CA)
11407 Avenue 144, Tipton, CA 93272Plant Summary Information
Tipton 2 - (CA) is ranked #632 out of 885 solar farms in California in terms of total annual net electricity generation.
Tipton 2 - (CA) generated 435.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Tipton 2 - (CA) |
|---|---|
| Utility Name | CleanCapital Holdings |
| Location | Tulare County, CA |
| Initial Operation Date | December 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 2.7 GWh |
| Annual Consumption | 9.5 k MMBtu |
| Ranked #10,175 out of 13,081 Power Plants Nationwide | |
| Ranked #5,108 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,301 out of 1,606 California Power Plants | |
| Ranked #632 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Pacifico Power (2024 to 2024) CleanCapital Holdings (2025 to 2025) |
Map of Tipton 2 - (CA)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tipton 2 - (CA).
Monthly Net Generation for Tipton 2 - (CA)
Monthly Plant Fuel Consumption for Tipton 2 - (CA)
Tipton 2 - (CA) Details
| Summary Information | |
|---|---|
| Plant Name | Tipton 2 - (CA) (68548) |
| Plant Address | 11407 Avenue 144, Tipton, CA 93272 |
| Utility | CleanCapital Holdings (65164) |
| Latitude, Longitude | 36.05016, -119.31472 |
| Generation Dates on File | Dec 2024 to Dec 2025 |
| Initial Operation Date | December 2024 |
| Annual Generation | 2.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF24-294-000, QF24-294-001, and QF24-294-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 480.00 kV |
| Energy Storage | Yes |
Generator TIP2B Details Operating December 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 2.9 |
|---|---|
| Maximum Charge Rate | 0.7 MW |
| Maximum Discharge Rate | 0.7 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.3 |
| Storage Enclosure Type | CS |
| Load Following | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 68548 |
| Direct Support Gen Id | TIP2B |
| Support T D Asset | No |
Generator TIP2S Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.1 MW |
| Summer Capacity | 2.1 MW |
| Winter Capacity | 2.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 2.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 2.5 MW |
| Virtual Net Metering Agreement | No |
Tipton 2 - (CA) Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5098 | Howland CSG | Sandy Creek, NY | 2.7 GWh |
| #5099 | CA OXNARD 2600 Sakioka Dr | Oxnard, CA | 2.7 GWh |
| #5100 | Oak Leaf Solar XXXIII LLC (Lantz) | Salida, CO | 2.7 GWh |
| #5101 | Gardner Solar 1 | Gardner, MA | 2.7 GWh |
| #5102 | Oak Leaf Solar XXIII LLC (CSG) | Watkins, CO | 2.7 GWh |
| #5103 | Moonlight Packing - Phase 2 | Reedley, CA | 2.7 GWh |
| #5104 | Boas Rd #4 Community Solar Farm | Mooers, NY | 2.7 GWh |
| #5105 | Syncarpha Hancock I CSG | Hancock, MA | 2.7 GWh |
| #5106 | Neisler Street Solar | Shelby, NC | 2.7 GWh |
| #5107 | Blue Sky One | Taos, NM | 2.7 GWh |
| #5109 | KP Ontario Vineyard Solar | Ontario, CA | 2.7 GWh |
| #5110 | Pine Hill Westport | Westport, MA | 2.7 GWh |
| #5111 | Kit Carson | Amalia, NM | 2.7 GWh |
| #5112 | Columbia Bryson | Grovetown, GA | 2.7 GWh |
| #5113 | Coventry Photovoltaic, LLC | Coventry, VT | 2.7 GWh |
| #5114 | Seaboard Oxford, LLC | Oxford, MA | 2.7 GWh |
| #5115 | City of Rio Rancho WWTP | Rio Rancho, NM | 2.7 GWh |
| #5116 | Renew Solar ABC Sacramento LLC | Sacramento, CA | 2.7 GWh |
| #5117 | Skyway Avenue Solar Farm | Frenchville, ME | 2.7 GWh |
| #5118 | Hay River (Dunn 1) | Boyceville, WI | 2.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tipton 2 - (CA).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alpaugh 50 | Alpaugh, CA | 57.3 GWh | 12.5 mi |
| Alpaugh North | Alpaugh, CA | 21.1 GWh | 12.5 mi |
| Angela Solar Project | Alpaugh, CA | 11.0 GWh | 15 mi |
| Blue Moon Farms | Tipton, CA | 2.0 GWh | 5.1 mi |
| Case Vander Eyk, Jr Dairy Solar | Pixley, CA | 2.1 GWh | 7 mi |
| CDCR (CA) - Corcoran State Prison | Corcoran, CA | 7.3 GWh | 13.6 mi |
| Central CA Fuel Cell 1, LLC | Tulare, CA | 13.2 GWh | 9.8 mi |
| City of Tulare Water Facility | Tulare, CA | 16.3 GWh | 9.9 mi |
| Corcoran | Corcoran, CA | 1.8 GWh | 14.5 mi |
| Cottonwood Solar, LLC (City of Corcoran) | Corcoran, CA | 20.6 GWh | 14.6 mi |
| Farmersville | Farmersville, CA | 5.6 GWh | 14.5 mi |
| Lindsay Solar | Lindsay, CA | 6.8 GWh | 15.1 mi |
| Solar Photovoltaic Project #42 | Tulare, CA | 6.4 GWh | 13.5 mi |
| South County Detention Center Solar | Porterville, CA | 2.4 GWh | 14.2 mi |
| Tipton 1 - (CA) | Tipton, CA | 167.0 MWh | 0 mi |
| Tulare 1 and 2 | Tulare, CA | 5.4 GWh | 11.9 mi |
| Tulare BioMAT Fuel Cell | Tulare, CA | 6.0 GWh | 10 mi |
| Tulare CSG LLC | Tulare, CA | 6.4 GWh | 10.2 mi |
| TWC | Tulare, CA | 2.2 GWh | 9 mi |
| White River Solar | Alpaugh, CA | 36.1 GWh | 14.9 mi |