West Tambo Clean Power II
5056 Lincoln Boulevard, Livingston, CA 95334Plant Summary Information
West Tambo Clean Power II is ranked #498 out of 918 solar farms in California in terms of total annual net electricity generation.
West Tambo Clean Power II generated 572.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | West Tambo Clean Power II |
|---|---|
| Utility Name | West Tambo Clean Power II |
| Location | Merced County, CA |
| Initial Operation Date | November 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 4.3 GWh |
| Annual Consumption | 15.1 k MMBtu |
| Ranked #8,724 out of 13,285 Power Plants Nationwide | |
| Ranked #3,894 out of 7,198 Solar Power Plants Nationwide | |
| Ranked #1,126 out of 1,641 California Power Plants | |
| Ranked #498 out of 918 California Solar Power Plants | |
| Fuel Types | Solar |
Map of West Tambo Clean Power II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Tambo Clean Power II.
Monthly Net Generation for West Tambo Clean Power II
Monthly Plant Fuel Consumption for West Tambo Clean Power II
West Tambo Clean Power II Details
| Summary Information | |
|---|---|
| Plant Name | West Tambo Clean Power II (66506) |
| Plant Address | 5056 Lincoln Boulevard, Livingston, CA 95334 |
| Utility | West Tambo Clean Power II (67318) |
| Latitude, Longitude | 37.36096, -120.7194 |
| Generation Dates on File | Aug 2024 to Dec 2025 |
| Initial Operation Date | November 2024 |
| Annual Generation | 4.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator WEST2 Details Operating November 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 45 |
| DC Net Capacity | 2.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
West Tambo Clean Power II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3884 | Ogburn Solar, LLC | Jefferson, SC | 4.3 GWh |
| #3885 | Trenton Solar Farm (MO) | Trenton, MO | 4.3 GWh |
| #3886 | Trout Creek Solar | Buena Vista, CO | 4.3 GWh |
| #3887 | Bunker Hill Solar | Lyndon, IL | 4.3 GWh |
| #3888 | Long John CSG | Sandwich, IL | 4.3 GWh |
| #3889 | CED Hilltop Solar | Rockford, IL | 4.3 GWh |
| #3890 | Deerfield CSG Solar | Deerfield, MA | 4.3 GWh |
| #3891 | Bernards Solar | Somerset, NJ | 4.3 GWh |
| #3892 | West Moore Solar II | Sherman, TX | 4.3 GWh |
| #3893 | Weaver Solar | Lynchburg, SC | 4.3 GWh |
| #3895 | NY Lower Road II CSG | New Hampton, NY | 4.3 GWh |
| #3896 | D'Arrigo Brothers - Phase 4 | Salinas, CA | 4.2 GWh |
| #3897 | Elba Solar LLC | Williamsfield, IL | 4.3 GWh |
| #3898 | Montgomery Winsted CSG | Winsted, MN | 4.3 GWh |
| #3899 | Hy-Vee Customer Hosted 2.25MW Solar | Chariton, IA | 4.3 GWh |
| #3900 | Trinity Freeport | Freeport, IL | 4.3 GWh |
| #3901 | Gloucester Community College Solar | Sewell, NJ | 4.3 GWh |
| #3902 | UMMS at Pocomoke | Pocomoke City, MD | 4.3 GWh |
| #3903 | Steel Sun | Lackawanna, NY | 4.3 GWh |
| #3904 | Peterson Road Solar | Palmer, MA | 4.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West Tambo Clean Power II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2097 Helton Solar Project | Merced, CA | 1.1 GWh | 11.7 mi |
| Almond Power Plant | Modesto, CA | 143.6 GWh | 20.7 mi |
| Broadway 3 - UC Merced 1 | Merced, CA | 929.0 MWh | 15.8 mi |
| Central 40 | Newman, CA | 71.5 GWh | 22.6 mi |
| City of Atwater NEM | Atwater, CA | 1.6 GWh | 7.8 mi |
| East Cleveland Road Solar | El Nido, CA | 5.9 GWh | 21.8 mi |
| Enchanted Rock Turlock Irrigation Distri | Patterson, CA | 2.5 GWh | 23.2 mi |
| Frontier Solar LLC | Newman, CA | 47.9 GWh | 22.6 mi |
| Henry Miller RD | Dos Palos, CA | 3.0 GWh | 21.7 mi |
| Hickman | Hickman, CA | 3.6 GWh | 18.1 mi |
| McClure | Modesto, CA | 1.6 GWh | 21.9 mi |
| Merced Pipeline | Merced, CA | 1.3 GWh | 15.1 mi |
| Merced Solar LLC | Merced, CA | 3.9 GWh | 14.4 mi |
| Mission Solar LLC | Merced, CA | 3.6 GWh | 14.5 mi |
| Parker | Snelling, CA | 6.0 GWh | 17.1 mi |
| Paulsell | Crows Landing, CA | 47.6 GWh | 22.9 mi |
| Sun Harvest Solar NDP1 | Dos Palos, CA | 2.8 GWh | 21.3 mi |
| Turlock Lake | Hickman, CA | 3.2 GWh | 18.6 mi |
| UC Merced Solar Hybrid | Merced, CA | 8.0 GWh | 15.8 mi |
| Walnut Energy Center | Turlock, CA | 1.5 TWh | 13 mi |