West Tambo Clean Power II
5056 Lincoln Boulevard, Livingston, CA 95334Plant Summary Information
West Tambo Clean Power II is ranked #810 out of 849 solar farms in California in terms of total annual net electricity generation.
West Tambo Clean Power II generated 654.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | West Tambo Clean Power II |
|---|---|
| Utility Name | West Tambo Clean Power II |
| Location | Merced County, CA |
| Initial Operation Date | November 2024 |
| Last Update | Dec 2024 |
| Annual Generation | 877.0 MWh |
| Annual Consumption | 3.0 k MMBtu |
| Ranked #11,494 out of 12,539 Power Plants Nationwide | |
| Ranked #6,149 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,543 out of 1,600 California Power Plants | |
| Ranked #810 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of West Tambo Clean Power II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Tambo Clean Power II.
Monthly Net Generation for West Tambo Clean Power II
West Tambo Clean Power II Details
| Summary Information | |
|---|---|
| Plant Name | West Tambo Clean Power II (66506) |
| Plant Address | 5056 Lincoln Boulevard, Livingston, CA 95334 |
| Utility | West Tambo Clean Power II (65555) |
| Latitude, Longitude | 37.36096, -120.7194 |
| Generation Dates on File | Aug 2024 to Dec 2024 |
| Initial Operation Date | November 2024 |
| Annual Generation | 877.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator WEST2 Details Operating November 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 45 |
| DC Net Capacity | 2.93 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
West Tambo Clean Power II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6139 | USS Water Fowl Solar LLC CSG | Silver Lake, MN | 908.0 MWh |
| #6140 | Walgreens Woodland Distribution Center | Woodland, CA | 908.0 MWh |
| #6141 | Lanesville Solar RES | Lanesville, IN | 907.0 MWh |
| #6142 | DE Solar 1725 Drywall Dr | Mt. Holly, NC | 902.0 MWh |
| #6143 | Broadway 3 - UC Merced 1 | Merced, CA | 901.0 MWh |
| #6144 | SunEdison Walgreens Moreno Valley | Moreno Valley, CA | 900.0 MWh |
| #6145 | Daytona International Speedway Solar | Daytona Beach, FL | 900.0 MWh |
| #6146 | Claverack Creek Solar | Hudson, NY | 895.0 MWh |
| #6147 | Community Foodbank of NJ | Hillside, NJ | 884.0 MWh |
| #6148 | Yamhill Solar LLC | Amity, OR | 881.0 MWh |
| #6150 | Tioga Solar Morris County 1 LLC | Morristown, NJ | 876.0 MWh |
| #6151 | CMEEC - Rogers Rd Solar | Norwich, CT | 875.0 MWh |
| #6152 | Staples La Mirada, CA | La Mirada, CA | 871.0 MWh |
| #6153 | Niagara Bottling Stockton | Stockton, CA | 870.0 MWh |
| #6154 | Edwards Air Force Base | Edwards, CA | 866.0 MWh |
| #6155 | Park Solar | Woodbridge, CT | 866.0 MWh |
| #6156 | CSU Northridge Plant | Northridge, CA | 865.0 MWh |
| #6157 | LSE Pavo Solar | Walton, NY | 861.0 MWh |
| #6158 | Manlius West | Manlius, NY | 848.0 MWh |
| #6159 | Renewable Energy Center at BJH | St Louis, MO | 846.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West Tambo Clean Power II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2097 Helton Solar Project | Merced, CA | 1.6 GWh | 11.7 mi |
| Almond Power Plant | Modesto, CA | 160.9 GWh | 20.7 mi |
| Broadway 3 - UC Merced 1 | Merced, CA | 901.0 MWh | 15.8 mi |
| Central 40 | Newman, CA | 70.8 GWh | 22.6 mi |
| Covanta Stanislaus Energy | Crows Landing, CA | 61.9 GWh | 23.2 mi |
| Frontier Solar LLC | Newman, CA | 38.6 GWh | 22.6 mi |
| Henry Miller RD | Dos Palos, CA | 3.2 GWh | 21.7 mi |
| Hickman | Hickman, CA | 3.6 GWh | 18.1 mi |
| McClure | Modesto, CA | 2.7 GWh | 21.9 mi |
| Merced Falls | Snelling, CA | 9.4 GWh | 24.1 mi |
| Merced Solar LLC | Merced, CA | 3.8 GWh | 14.4 mi |
| Mission Solar LLC | Merced, CA | 3.8 GWh | 14.5 mi |
| Parker | Snelling, CA | 5.5 GWh | 17.1 mi |
| Paulsell | Crows Landing, CA | 45.0 GWh | 22.9 mi |
| Sun Harvest Solar NDP1 | Dos Palos, CA | 3.3 GWh | 21.3 mi |
| Turlock Lake | Hickman, CA | 7.0 GWh | 18.6 mi |
| UC Merced Solar Hybrid | Merced, CA | 6.5 GWh | 15.8 mi |
| Upper Dawson | La Grange, CA | 10.7 GWh | 24.2 mi |
| Walnut | Turlock, CA | 429.0 MWh | 13.5 mi |
| Walnut Energy Center | Turlock, CA | 1.6 TWh | 13 mi |