Nachtigall 1836-WD
200 CA-43, Wasco, CA 93280Plant Summary Information
Nachtigall 1836-WD is ranked #322 out of 885 solar farms in California in terms of total annual net electricity generation.
Nachtigall 1836-WD generated 1.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Nachtigall 1836-WD |
|---|---|
| Utility Name | Standard Solar |
| Location | Kern County, CA |
| Initial Operation Date | December 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 11.0 GWh |
| Annual Consumption | 37.4 k MMBtu |
| Ranked #6,084 out of 13,081 Power Plants Nationwide | |
| Ranked #1,878 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #809 out of 1,606 California Power Plants | |
| Ranked #322 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Russell Pacific LLC (2023 to 2023) Standard Solar (2024 to 2025) |
Map of Nachtigall 1836-WD
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nachtigall 1836-WD.
Monthly Net Generation for Nachtigall 1836-WD
Monthly Plant Fuel Consumption for Nachtigall 1836-WD
Nachtigall 1836-WD Details
| Summary Information | |
|---|---|
| Plant Name | Nachtigall 1836-WD (67747) |
| Plant Address | 200 CA-43, Wasco, CA 93280 |
| Utility | Standard Solar (60531) |
| Latitude, Longitude | 35.60872, -119.32582 |
| Generation Dates on File | Dec 2024 to Dec 2025 |
| Initial Operation Date | December 2024 |
| Annual Generation | 11.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator NACHT Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4.6 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 4.6 MW |
| Winter Capacity | 4.6 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Net Metering Agreement | No |
|---|---|
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 4.6 MW |
Nachtigall 1836-WD Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1868 | Alamogordo Solar Energy Center | Alamogordo, NM | 11.1 GWh |
| #1869 | Bovine | Wallis, TX | 11.1 GWh |
| #1870 | Quakertown Solar Farm, LLC | Franklin Twp. / Pitts, NJ | 11.1 GWh |
| #1871 | TPE Irish Road Solar, LLC | Chatham, VA | 11.1 GWh |
| #1872 | GE 19th Hole | Johnstown, NY | 11.0 GWh |
| #1873 | Fairfield Lee Solar, LLC Community Solar | Fairfield, VA | 11.0 GWh |
| #1874 | CBEP Solar 1, LLC | Sterling, CO | 11.0 GWh |
| #1875 | Butterfield Solar Farm | Durant, OK | 11.0 GWh |
| #1876 | Polk Farm | Hamlet, NC | 11.0 GWh |
| #1877 | Gliden (Op Zone) | Tyner, NC | 11.0 GWh |
| #1879 | JMB Mcguire-Dix-Lakehurst Solar Project | McGuire AFB, NJ | 10.9 GWh |
| #1880 | Richmond Solar Park 4 | Richmond, IN | 10.9 GWh |
| #1881 | Windsor Hwy 17 Solar | Windsor, NC | 10.9 GWh |
| #1882 | Snow Camp Solar, LLC | Snow Camp, NC | 10.9 GWh |
| #1883 | Napoleon Solar I | Napoleon, OH | 10.9 GWh |
| #1884 | USPS PV | Los Angeles, CA | 10.9 GWh |
| #1885 | Chisago Solar | North Branch, MN | 10.8 GWh |
| #1886 | Wonderful Orchards - New Columbia | Firebaugh, CA | 10.8 GWh |
| #1887 | SCE&G Springfield CSG | Springfield, SC | 10.8 GWh |
| #1888 | Osawatomie Solar | Osawatomie, KS | 10.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nachtigall 1836-WD.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ABEC #2 dba West-Star Dairy | Buttonwillow, CA | 8.1 GWh | 11.2 mi |
| Avalon Dairy | Wasco, CA | 792.0 MWh | 9.5 mi |
| Broadway 4 - Target Shafter | Shafter, CA | 2.8 GWh | 12.6 mi |
| CDCR (CA) - Wasco State Prison | Wasco, CA | 3.2 GWh | 4.4 mi |
| Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 29.9 GWh | 14.3 mi |
| Delano Energy Center | Delano, CA | 2.4 GWh | 12.7 mi |
| Delano Land 1 | Delano, CA | 892.0 MWh | 10.6 mi |
| DGS Wasco State Prison | Wasco, CA | 4.5 GWh | 4.7 mi |
| Highway 43 1887-WD | Shafter, CA | 3.3 GWh | 5.6 mi |
| Kern Valley SP | Delano, CA | 7.8 GWh | 10.8 mi |
| Lerdo Detention Facility - Solar 2, 3 | Bakersfield, CA | 2.0 GWh | 13.9 mi |
| North Kern 1 | Shafter, CA | 6.9 GWh | 13.1 mi |
| North Kern 2 | City of Shafter, CA | 6.1 GWh | 13.7 mi |
| North Kern 3 | Bakersfield, CA | 13.6 GWh | 9.9 mi |
| North Kern State Prison Phase II | Delano, CA | 7.4 GWh | 11.9 mi |
| Sun Pacific - Lerdo | Shafter, CA | 6.0 GWh | 12.6 mi |
| Terry 1818-WD | Wasco, CA | 10.3 GWh | 0.2 mi |
| Wildwood Solar I, LLC | Wasco, CA | 48.3 GWh | 14.2 mi |
| Wildwood Solar II | Wasco, CA | 38.7 GWh | 14 mi |
| Wonderful Nursery | Wasco, CA | 5.1 GWh | 3.8 mi |