CA - Fresno, City of - SE Surface WTP
6369 E Floradora Ave., Fresno, CA 93727Plant Summary Information
CA - Fresno, City of - SE Surface WTP is ranked #398 out of 914 solar farms in California in terms of total annual net electricity generation.
CA - Fresno, City of - SE Surface WTP generated 1.0 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | CA - Fresno, City of - SE Surface WTP |
|---|---|
| Utility Name | Forefront Power, LLC |
| Location | Fresno County, CA |
| Initial Operation Date | January 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 7.1 GWh |
| Annual Consumption | 24.4 k MMBtu |
| Ranked #7,389 out of 13,269 Power Plants Nationwide | |
| Ranked #2,862 out of 7,183 Solar Power Plants Nationwide | |
| Ranked #967 out of 1,637 California Power Plants | |
| Ranked #398 out of 914 California Solar Power Plants | |
| Fuel Types | Solar |
Map of CA - Fresno, City of - SE Surface WTP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CA - Fresno, City of - SE Surface WTP.
Monthly Net Generation for CA - Fresno, City of - SE Surface WTP
Monthly Plant Fuel Consumption for CA - Fresno, City of - SE Surface WTP
CA - Fresno, City of - SE Surface WTP Details
| Summary Information | |
|---|---|
| Plant Name | CA - Fresno, City of - SE Surface WTP (69068) |
| Plant Address | 6369 E Floradora Ave., Fresno, CA 93727 |
| Utility | Forefront Power, LLC (62856) |
| Latitude, Longitude | 36.75, -119.65 |
| Generation Dates on File | Jan 2025 to Dec 2025 |
| Initial Operation Date | January 2025 |
| Annual Generation | 7.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 79-1198-02 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | 4 Rivers Electric Cooperative, Inc. (63286) KS |
| Grid Voltage | 21.00 kV |
| Energy Storage | No |
Generator 19064 Details Operating January 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Dual Axis Tracking | No |
| Azimuth Angle | 180 |
| DC Net Capacity | 3.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
CA - Fresno, City of - SE Surface WTP Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2852 | Monticello Project CSG | Monticello, MN | 7.2 GWh |
| #2853 | Martin Solar Center | Kents Store, VA | 7.2 GWh |
| #2854 | ME Novel Lighthouse - Carrabassett | Carrabassett Valley, ME | 7.2 GWh |
| #2855 | River Valley LLC (NY) (CSG) | Olean, NY | 7.2 GWh |
| #2856 | Old Mill Solar | Bly, OR | 7.2 GWh |
| #2857 | CSU Long Beach Lots 7 & 14 | Long Beach, CA | 7.2 GWh |
| #2858 | SR Warren, LLC | Franklin, KY | 7.2 GWh |
| #2859 | Watervliet PV | Watervliet, MI | 7.2 GWh |
| #2860 | Water Street Solar | Randolph, ME | 7.2 GWh |
| #2861 | Arthur Solar, LLC | Tabor City, NC | 7.1 GWh |
| #2863 | Sullivan Solar, LLC | Sullivan, IN | 7.1 GWh |
| #2864 | Samarcand Solar Farm, LLC | Biscoe, NC | 7.1 GWh |
| #2865 | St. Pauls Solar 1, LLC | St. Pauls, NC | 7.1 GWh |
| #2866 | Blanchard Road 1 Community Solar | Clayton, NY | 7.1 GWh |
| #2867 | Saratoga Solar LLC | Milton, NY | 7.1 GWh |
| #2868 | Keystone Solar | Quarryville, PA | 7.1 GWh |
| #2869 | Amazon JFK8 Solar Project | Staten Island, NY | 7.1 GWh |
| #2870 | Tides Lane Farm | Louisburg, NC | 7.1 GWh |
| #2871 | Mass Midstate Solar 1 | Warren, MA | 7.1 GWh |
| #2872 | Fisher Road Solar | Dartmouth, MA | 7.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CA - Fresno, City of - SE Surface WTP.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Algonquin Power Sanger LLC | Sanger, CA | 3.6 GWh | 7.1 mi |
| CA - Fresno County - Juvenile Hall | Fresno, CA | 6.8 GWh | 7.4 mi |
| Clovis East High School | Clovis, CA | 1.3 GWh | 3.5 mi |
| Clovis High School | Clovis, CA | 1.6 GWh | 5 mi |
| Clovis North High School | Fresno, CA | 1.5 GWh | 10.8 mi |
| CSU Fresno Solar Project | Fresno, CA | 1.3 GWh | 6.5 mi |
| Fresno Bullard High School Hybrid | Fresno, CA | 2.1 GWh | 10.1 mi |
| Fresno Hoover High School Hybrid | Fresno, CA | 2.0 GWh | 8.2 mi |
| Fresno Sunnyside High School Hybrid | Fresno, CA | 2.3 GWh | 3.9 mi |
| Gap Pacific Distribution Center | Fresno, CA | 5.4 GWh | 3.8 mi |
| JD Foods - JD Foods | Fresno, CA | 2.5 GWh | 6.3 mi |
| La Joya Del Sol | Fresno, CA | 806.0 MWh | 9.5 mi |
| Malaga Power LLC | Fresno, CA | 6.3 GWh | 6.5 mi |
| National Raisin | Fowler, CA | 4.6 GWh | 8.8 mi |
| OK Produce Fresno Carport | Fresno, CA | 3.3 GWh | 7.1 mi |
| POM Plant 1 | Del Rey, CA | 5.1 GWh | 7.3 mi |
| POM Plant 2 | Del Rey, CA | 3.4 GWh | 7.2 mi |
| Saint Agnes Medical Center | Fresno, CA | 32.1 GWh | 8.7 mi |
| SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 10.4 mi |
| SCCCD - Fresno Community College | Fresno, CA | 3.8 GWh | 8.3 mi |