Terry 1818-WD

200 CA-43, Wasco, CA 93280

Plant Summary Information

Terry 1818-WD is ranked #848 out of 852 solar farms in California in terms of total annual net electricity generation.

Terry 1818-WD generated 57.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameTerry 1818-WD
Utility NameStandard Solar
LocationKern County, CA
Initial Operation DateDecember 2024
Last Update Dec 2024
Annual Generation 57.0 MWh
Annual Consumption 194 MMBtu
Ranked #12,301 out of 12,613 Power Plants Nationwide
Ranked #6,406 out of 6,463 Solar Power Plants Nationwide
Ranked #1,597 out of 1,603 California Power Plants
Ranked #848 out of 852 California Solar Power Plants
Fuel Types Solar
Previous Operator Russell Pacific LLC (2023 to 2023)
Standard Solar (2024 to 2024)

Map of Terry 1818-WD

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Terry 1818-WD.

Create Your Account Today

Monthly Net Generation for Terry 1818-WD

Monthly Plant Fuel Consumption for Terry 1818-WD

Terry 1818-WD Details

Summary Information
Plant NameTerry 1818-WD (67748)
Plant Address200 CA-43, Wasco, CA 93280
UtilityStandard Solar (60531)
Latitude, Longitude35.6078, -119.32879
Generation Dates on FileDec 2024 to Dec 2024
Initial Operation DateDecember 2024
Annual Generation 57.0 MWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator TERRY Details Operating December 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity4.6 MW
Nameplate Power Factor1
Summer Capacity4.6 MW
Winter Capacity4.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2024
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details

Terry 1818-WD Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6396Princeton Energy Center, LLCPlainsboro, NJ24.6 GWh
#6397Morey RoadLake City, MI71.0 MWh
#6398AcerMadrid, NY68.0 MWh
#6399Pivot Energy PPA 22Visalia, CA68.0 MWh
#6400Bolthouse S&P and Rowen Farms SolarPalmdale, CA67.0 MWh
#6401ISM Solar Shepherd AcresSouth Paris, ME65.0 MWh
#6402Lebanon CSG LLCLebanon, ME64.0 MWh
#6403Limestone CSG 2 LLCLimestone, ME62.0 MWh
#6404Cottage Grove North Solar 1, LLCBeecher, IL60.0 MWh
#6405Lake CityLake City, MI59.0 MWh
#6407Goodenow Road West Solar 1, LLCBeecher, IL48.0 MWh
#6408BMW Manufacturing CoGreer, SC12.2 GWh
#6409Cottage Grove South Solar 1, LLCBeecher, IL43.0 MWh
#6410Martinsburg CSG LLCLowville, NY39.0 MWh
#6411Wake RJ3 Solar Energy StorageWake Forest, NC21.0 MWh
#6412OR - Green Key - MarquamMolalla, OR37.0 MWh
#6413Wolcott Hill (Camden) (CSG)Camden, NY35.0 MWh
#6414Blackwell Creek SolarCentral Point, OR31.0 MWh
#6415Hackbarth Solar WI, LLCFort Atkinson, WI30.0 MWh
#6416Bighorn SolarSalem, OR29.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding Terry 1818-WD.

Plant NamePlant LocationAnnual GenerationDistance
ABEC #2 dba West-Star DairyButtonwillow, CA8.5 GWh11.1 mi
Broadway 4 - Target ShafterShafter, CA3.0 GWh12.7 mi
CDCR (CA) - Wasco State PrisonWasco, CA3.3 GWh4.2 mi
Cottonwood Solar, LLC (Goose Lake)Lost Hills, CA31.5 GWh14.1 mi
Delano Energy CenterDelano, CA7.3 GWh12.8 mi
Delano Land 1Delano, CA963.0 MWh10.6 mi
DGS Wasco State PrisonWasco, CA4.5 GWh4.5 mi
Highway 43 1887-WDShafter, CA270.0 MWh5.6 mi
Kern Valley SPDelano, CA7.9 GWh10.8 mi
Laredo Detention Facility - Solar 2, 3Bakersfield, CA5.1 GWh14 mi
Nachtigall 1836-WDWasco, CA8.0 MWh0.2 mi
North Kern 1Shafter, CA3.9 GWh13.1 mi
North Kern 2City of Shafter, CA2.4 GWh13.8 mi
North Kern 3Bakersfield, CA6.0 MWh10.1 mi
North Kern State Prison Phase IIDelano, CA6.5 GWh12 mi
Roll DelanoDelano, CA8.9 GWh10.1 mi
Roll Delano 2Delano, CA7.4 GWh10.4 mi
Wildwood Solar I, LLCWasco, CA41.9 GWh14 mi
Wildwood Solar IIWasco, CA38.5 GWh13.9 mi
Wonderful NurseryWasco, CA4.6 GWh3.6 mi