Terry 1818-WD

200 CA-43, Wasco, CA 93280

Plant Summary Information

Terry 1818-WD is ranked #850 out of 854 solar farms in California in terms of total annual net electricity generation.

Terry 1818-WD generated 57.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameTerry 1818-WD
Utility NameStandard Solar
LocationKern County, CA
Initial Operation DateDecember 2024
Last Update Dec 2024
Annual Generation 57.0 MWh
Annual Consumption 194 MMBtu
Ranked #12,326 out of 12,637 Power Plants Nationwide
Ranked #6,430 out of 6,487 Solar Power Plants Nationwide
Ranked #1,597 out of 1,603 California Power Plants
Ranked #850 out of 854 California Solar Power Plants
Fuel Types Solar
Previous Operator Russell Pacific LLC (2023 to 2023)
Standard Solar (2024 to 2024)

Map of Terry 1818-WD

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Terry 1818-WD.

Create Your Account Today

Monthly Net Generation for Terry 1818-WD

Monthly Plant Fuel Consumption for Terry 1818-WD

Terry 1818-WD Details

Summary Information
Plant NameTerry 1818-WD (67748)
Plant Address200 CA-43, Wasco, CA 93280
UtilityStandard Solar (60531)
Latitude, Longitude35.6078, -119.32879
Generation Dates on FileDec 2024 to Dec 2024
Initial Operation DateDecember 2024
Annual Generation 57.0 MWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator TERRY Details Operating December 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity4.6 MW
Nameplate Power Factor1
Summer Capacity4.6 MW
Winter Capacity4.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2024
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details

Terry 1818-WD Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6420Princeton Energy Center, LLCPlainsboro, NJ24.6 GWh
#6421Morey RoadLake City, MI71.0 MWh
#6422AcerMadrid, NY68.0 MWh
#6423Pivot Energy PPA 22Visalia, CA68.0 MWh
#6424Bolthouse S&P and Rowen Farms SolarPalmdale, CA67.0 MWh
#6425ISM Solar Shepherd AcresSouth Paris, ME65.0 MWh
#6426Lebanon CSG LLCLebanon, ME64.0 MWh
#6427Limestone CSG 2 LLCLimestone, ME62.0 MWh
#6428Cottage Grove North Solar 1, LLCBeecher, IL60.0 MWh
#6429Lake CityLake City, MI59.0 MWh
#6431Goodenow Road West Solar 1, LLCBeecher, IL48.0 MWh
#6432BMW Manufacturing CoGreer, SC12.2 GWh
#6433Cottage Grove South Solar 1, LLCBeecher, IL43.0 MWh
#6434Martinsburg CSG LLCLowville, NY39.0 MWh
#6435OR - Green Key - MarquamMolalla, OR37.0 MWh
#6436Wake RJ3 Solar Energy StorageWake Forest, NC21.0 MWh
#6437Wolcott Hill (Camden) (CSG)Camden, NY35.0 MWh
#6438Blackwell Creek SolarCentral Point, OR31.0 MWh
#6439Hackbarth Solar WI, LLCFort Atkinson, WI30.0 MWh
#6440Bighorn SolarSalem, OR29.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding Terry 1818-WD.

Plant NamePlant LocationAnnual GenerationDistance
ABEC #2 dba West-Star DairyButtonwillow, CA8.5 GWh11.1 mi
Broadway 4 - Target ShafterShafter, CA3.0 GWh12.7 mi
CDCR (CA) - Wasco State PrisonWasco, CA3.3 GWh4.2 mi
Cottonwood Solar, LLC (Goose Lake)Lost Hills, CA31.5 GWh14.1 mi
Delano Energy CenterDelano, CA7.3 GWh12.8 mi
Delano Land 1Delano, CA963.0 MWh10.6 mi
DGS Wasco State PrisonWasco, CA4.5 GWh4.5 mi
Highway 43 1887-WDShafter, CA270.0 MWh5.6 mi
Kern Valley SPDelano, CA7.9 GWh10.8 mi
Laredo Detention Facility - Solar 2, 3Bakersfield, CA5.1 GWh14 mi
Nachtigall 1836-WDWasco, CA8.0 MWh0.2 mi
North Kern 1Shafter, CA3.9 GWh13.1 mi
North Kern 2City of Shafter, CA2.4 GWh13.8 mi
North Kern 3Bakersfield, CA6.0 MWh10.1 mi
North Kern State Prison Phase IIDelano, CA6.5 GWh12 mi
Roll DelanoDelano, CA8.9 GWh10.1 mi
Roll Delano 2Delano, CA7.4 GWh10.4 mi
Wildwood Solar I, LLCWasco, CA41.9 GWh14 mi
Wildwood Solar IIWasco, CA38.5 GWh13.9 mi
Wonderful NurseryWasco, CA4.6 GWh3.6 mi