Terry 1818-WD

200 CA-43, Wasco, CA 93280

Plant Summary Information

Terry 1818-WD is ranked #335 out of 886 solar farms in California in terms of total annual net electricity generation.

Terry 1818-WD generated 1.6 GWh during the 3-month period between September 2025 to December 2025.

Plant NameTerry 1818-WD
Utility NameStandard Solar
LocationKern County, CA
Initial Operation DateDecember 2024
Last Update Dec 2025
Annual Generation 10.3 GWh
Annual Consumption 35.2 k MMBtu
Ranked #6,207 out of 13,094 Power Plants Nationwide
Ranked #1,952 out of 7,027 Solar Power Plants Nationwide
Ranked #834 out of 1,607 California Power Plants
Ranked #335 out of 886 California Solar Power Plants
Fuel Types Solar
Previous Operator Russell Pacific LLC (2023 to 2023)
Standard Solar (2024 to 2025)

Map of Terry 1818-WD

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Terry 1818-WD.

Create Your Account Today

Monthly Net Generation for Terry 1818-WD

Monthly Plant Fuel Consumption for Terry 1818-WD

Terry 1818-WD Details

Summary Information
Plant NameTerry 1818-WD (67748)
Plant Address200 CA-43, Wasco, CA 93280
UtilityStandard Solar (60531)
Latitude, Longitude35.6078, -119.32879
Generation Dates on FileDec 2024 to Dec 2025
Initial Operation DateDecember 2024
Annual Generation 10.3 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator TERRY Details Operating December 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity4.6 MW
Nameplate Power Factor1
Summer Capacity4.6 MW
Winter Capacity4.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2024
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity4.6 MW

Terry 1818-WD Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#1942Thigpen Farms Solar, LLCMaxton, NC10.4 GWh
#1943IMPA Richmond 8 Solar ParkRichmond, IN10.4 GWh
#1944OYA Wayside DriveWatertown, NY10.4 GWh
#1945Milford Solar Farm (NJ) LLCMilford Township, NJ10.4 GWh
#1946McLean HomesteadLaurinburg, NC10.3 GWh
#1947Imclone Solar Electric FacilityBranchburg, NJ10.3 GWh
#1948Smith Solar FarmGibson, NC10.3 GWh
#1949RE Rio Grande Solar LLCMojave, CA10.3 GWh
#1950Byrne Solar, LLCLowell, MI10.3 GWh
#1951Haley SolarAllendale, SC10.3 GWh
#1953Veolia (Gum Springs)Arkadelphia, AR10.3 GWh
#1954Blairs Valley Solar ProjectMercersburg, PA10.3 GWh
#1955Winslow PV - BD Solar 2 LLCWinslow, ME10.3 GWh
#1956LaFayette Solar WI, LLCElkhorn, WI10.2 GWh
#1957StarrClinton, NC10.2 GWh
#1958OYA Robinson RoadOrleans, NY10.2 GWh
#1959Huxley SolarLudlow, MA10.2 GWh
#1960Bay Branch SolarChocowinity, NC10.2 GWh
#1961Wonderful FirebaughFirebaugh, CA10.2 GWh
#1962276 Federal Rd(CSG)Carver, MA10.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Terry 1818-WD.

Plant NamePlant LocationAnnual GenerationDistance
ABEC #2 dba West-Star DairyButtonwillow, CA8.1 GWh11.1 mi
Avalon DairyWasco, CA792.0 MWh9.4 mi
Broadway 4 - Target ShafterShafter, CA2.8 GWh12.7 mi
CDCR (CA) - Wasco State PrisonWasco, CA3.2 GWh4.2 mi
Cottonwood Solar, LLC (Goose Lake)Lost Hills, CA29.9 GWh14.1 mi
Delano Energy CenterDelano, CA2.4 GWh12.8 mi
Delano Land 1Delano, CA892.0 MWh10.6 mi
DGS Wasco State PrisonWasco, CA4.5 GWh4.5 mi
Highway 43 1887-WDShafter, CA3.3 GWh5.6 mi
Kern Valley SPDelano, CA7.8 GWh10.8 mi
Lerdo Detention Facility - Solar 2, 3Bakersfield, CA2.0 GWh14 mi
Nachtigall 1836-WDWasco, CA11.0 GWh0.2 mi
North Kern 1Shafter, CA6.9 GWh13.1 mi
North Kern 2City of Shafter, CA6.1 GWh13.8 mi
North Kern 3Bakersfield, CA13.6 GWh10.1 mi
North Kern State Prison Phase IIDelano, CA7.4 GWh12 mi
Sun Pacific - LerdoShafter, CA6.0 GWh12.7 mi
Wildwood Solar I, LLCWasco, CA48.3 GWh14 mi
Wildwood Solar IIWasco, CA38.7 GWh13.9 mi
Wonderful NurseryWasco, CA5.1 GWh3.6 mi